電網荷載 的英文怎麼說

中文拼音 [diànwǎngzǎi]
電網荷載 英文
network load
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  • : 荷名詞(蓮) lotus
  • : 載Ⅰ名詞(年) year : 一年半載 six to twelve months; six months to a year; 三年五載 three to five ...
  • 電網 : electrified wire netting; live wire entanglement; power grid電網電源 electric network source; 電...
  1. Moreover, it could do so reliably ? and that means wind power could be used for what is known in the jargon as base - load power supply

    而且這種比較可靠? ?這意味著,像人們常說的那樣,風能可以被利用來提供基本功率。
  2. Electricity metering - data exchange for meter reading, tarif and load control - part 31 : use of local area networks on twisted pair with carrier signalling

    量計.抄表費和負控制的數據交換.第31部分:帶有波信號傳輸的雙絞線局域的使用
  3. This project makes some researches with emphasis on the mv / lv distribution power supply situation under the present load condition. some results such as the calculation of line load rate, theoretical line consumption rate and electric voltage decrease are acquired by the mathematical analysis, and thus the power supply capability is evaluated comprehensively. the same has been done to the lv power network

    課題在系統搜集分析蘇州供企業的背景資料,即企業概況、力需求、輸、高壓配狀況基礎上,重點研究了當前負下的中低壓配情況,並通過數學分析得出線路的負率的計算、理論線損率以及壓降等各項運行指標,綜合評估得出其供能力。
  4. Secondly, their aims are made the investment of substations, feeders or running cost of electric power system minimum. but they do n ' t take into account of land utilization, street accessibility of right of way, etc., but demands of electric power system. generally, a straight line distance, namely, euclid distance, was used for calculating the distance between a load point and a substation, which is a straight forward but non - practical way for most planning techniques

    其次受研究工具的限制,這些模型以工程投資、運行費用等最小為目標,僅能考慮導線流量、壓降等力系統技術約束條件,簡化略去了用地限制、街道可達性等重要的自然約束條件,且求解這些模型的前奏是計算負點到變所的歐幾里得距離(直線距離) ,簡便但不切合實際(這一點在城市規劃中尤其重要) ,因此較難給出技術上可行的最優解。
  5. In this dissertation, the beijing downtown area distribution system capability is evaiuated based on fuzzy theory according to the present condition of beijing distribution system. factors considered in this dissertation affecting the capability are including as follows : feeder load rate, voltage offset, network 1oss and n - l analysis. the load allocation in beijing distribution system of downtown area is got, and conclusion of the whole fuzzy distribution capability is reached

    本論文根據北京城區配現狀,應用模糊數學的方法,對影響配的供能力的各個因素:線路負率、壓偏移、損和n - 1校驗分析進行了評估,得到了北京城區配的負分佈情況和整個北京城區配能力的模糊水平。
  6. To the cabin which is designed by the forth department chongqing communication college, the model which includes the air in the cabin, generator set and public muffler is built integer, meshed, and added by boundary condition and load. the normal k - model etc are used to be turbulence model of the air in cabin respectively, the turbulence model is calculated by simplef or simplen algorithm, and by the first order accurate msu or the second order accurate supg in advection discretization scheme

    論文對艙內空氣、發機組和公用消聲器進行了整體建模和格劃分,施加機組艙模型的邊界條件和,採用標準k -等多個模型來分別模擬機組艙通風散熱的空氣湍流流動,採用simplef和simplen兩種不同的數值演算法以及一階msu和二階supg的對流項分離方案來對流動模型進行運算。
  7. Consequencely, the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, and the back - analysis and the prediction of the parameters of the dam system have been done according to the operating observed data. the research work involves several aspects as follows : 1 ) a back - analysis model including the prior information and a predictive model of nonlinear time series were established ; 2 ) the analysis and assessment system of the operating state of the concrete dam was developed under the ansys development environment, in which the analysis module of the loading effects, the back - analysis module, the forecasting module of the physical parameters and the assessment module of the operating state were contained ; 3 ) according to the operating observed data, the operating state of the dam was assessed and predicted with the analysis system of the operating state, the results suggested that the dam is in basically normal operation at present

    具體工作有以下幾方面: 1 )收集整理漫灣水站大壩運行監測資料,並對其進行了系統分析,從觀測資料本身直觀的分析了大壩的運行狀況; 2 )總結位移反分析的理論及方法,建立了考慮先驗信息多介質位移反分析模型,基於神經路非線性映射功能,建立了神經路時間序列預測模型; 3 )以ansys軟體為平臺,開發了漫灣水站砼重力壩運行狀態評價模塊,結合效應分析、參數反演分析、參數預測分析三個模塊組成漫灣水站砼重力壩運行狀態分析系統;實現了對漫灣水站運行狀態的動態「反演-預測」分析; 4 )利用漫灣水站砼重力壩運行狀態分析系統,在漫灣大壩實測資料分析、大壩砼特性參數反分析、大壩砼彈性模量衰變規律及預測分析的基礎上,系統的分析並預測了大壩運行狀態。
  8. Being basis on the 14 regional grid planning texts of historical data of hunan province, initially determining the factors that affecting power grid construction ; to reflect the distribution of information to determine the scale of construction leading indicators to assess the scale, with its own network of intelligence presented to the region to assess the scale of the distribution network - building indicators system ; establishes assessment models of evaluating 110kv distribution network building scale integrated ; considering the main factor that influencing the construction scale of the distribution network, the improvement method of 10kv distribution networks capacity - load ratio is proposed ; the combination of high voltage distribution network planning optimization technology results presented evaluation pressure distribution network building scale integrated assessment methods

    課題以湖南省14地區已有規劃文本歷史數據為基礎,初步確定各種影響建設的因素;以反映配建設規模的主導信息來確定規模評估指標,提出了符合自己情的地區配建設規模的評估指標體系;建立了評價110kv配建設規模的綜合評估模型;通過研究各影響因素與負發展儲備系數參數的關系提出了確定10kv變比的方法;結合高壓配規劃的優化技術成果,提出了評價中壓配建設規模的綜合評估方法。
  9. This paper mainly discusses a control method of substation voltage and reactive power. in order to get suitable decision for one day 24 hours tap - transformer ' s step switch and shunt capacitor switch, an approach of substation voltage and reactive power control on the basis of the combination of artificial neural network ( ann ) reactive power forecasting and evolutionary programming optimal decision - making is put forward

    論文主要研究變站的壓/無功控制決策問題,為了確定一天24小時內合適的有調壓變壓器分接頭位置和並聯容器投切狀態,提出一種基於人工神經路的無功負預測和進化規劃優化決策相結合的變壓和無功的綜合控制決策。
  10. Based on the theory mode, the delay time between the beginning of optical illumination and the onset of lock - on switching was calculated, and the transiting speed of electrons, the traversing velocity of the current filament, was obtained as well. the calculated results matched well the experimental results. taking advantage of the ultra - fast response characteristics of the devices, si - gaas pcss ' s are successfully applied to the broadening test of nanosecond laser pulses

    應用單極疇模型數值計算了lock - on效應的光、時間延遲和流子的渡西安理工大學碩士學位論文越速度(絲狀流穿越開關間隙的速度) ,所得計算結果與實驗測試結果基本吻a利川半絕緣gaas光屯導開關的超快光l匕11向應燈性,成功地應川下納秒激光脈沖展寬試驗中,證明了開關可廠泛應川在超快光響應和光反饋路中。
  11. To prevent pumping system stopping working, working without efficiency and being destroyed, so it is very important to monitor oil - well. the thesis dissertates the process of developing displacement - load sensor which collects displacement data and load data to form the indicator diagrams, researches the means based on rbf neural network of recognizing fault types, designs parts of hardware and software of the mainframe of the oil - well monitor and control system, and debugs the entire oil - well monitor and control system

    為了防止抽油機故障停機、無油空抽、不法分子的蓄意破壞等情況的發生,因此對油井工況進行實時監控顯得尤為重要。本文論述了採集用於形成油井示功圖的位移和數據的傳感器的研製,包括硬體路和軟體的設計,對基於rbf神經路的油井工況模式識別方法進行了研究,對監控系統主機的部分硬體路及相應的軟體進行了設計,並對整個油井監控系統進行了聯調和測試。
分享友人