電荷傳遞 的英文怎麼說

中文拼音 [diànzhuàn]
電荷傳遞 英文
charge transfer
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : 荷名詞(蓮) lotus
  • : 傳名詞1 (解釋經文的著作) commentaries on classics 2 (傳記) biography 3 (敘述歷史故事的作品)...
  • : Ⅰ動詞(傳送;傳遞) hand over; pass; give Ⅱ副詞(順著次序) in the proper order; successively
  1. In the first part of this paper, mn ( iii ) / mn ( ii ) couple in h2so4 was firstly applied as the positive couple to this system, i. e. redox flow cell. its chemical, electrochemical properties, redox kinetics and related parameters were characterized and discussed by rotating disc electrode ( rde ), cyclic voltammetry ( cv ), a. c. impedance ( a. c. imp ), chronoamperometry, tafel curve, and galvanostatic charge / discharge techniques. conclusions have been drawn as follows : 1. the electrochemical kinetics of mn ( iii ) / mn ( ii ) redox couple in 6. 3m h2so4 solution were studied by means of rotating disc electrode ( rde ) technique on platinum electrode

    本文第一部分首次成功地將酸性介質中的mn ( iii ) / mn ( ii )對應用於氧化還原液流池這一新型儲能裝置的正極活性材料,通過旋轉圓盤( rde ) 、循環伏安( cv ) 、交流阻抗( a . c . imp ) 、恆位階躍、 tafel實驗以及mn ( iii ) / mn ( ii )單極的恆流充放實驗,我們得出以下結論: 1 .在旋轉圓盤極上,不同轉速范圍,不同的極化過位, mn ( ) / mn ( )體系氧化還原極過程的控制步驟不同,電荷傳遞、擴散質可分別或聯合成為控制步驟。
  2. Problems occured in the anchoring of overhung tourist hall on top of the tv tower and tower drum due to construction mistakes. it was introduced in this paper that two non - binding prestressed girder beams are respectively set in corresponding locations as the anchor beam of overhung radial support beam of tourist hall, thus the integrity of the tower drum and transmission of the load were guaranteed

    由於施工失誤,作為視塔頂的外懸游覽廳和塔筒間的錨固發生了問題,本文介紹了採用在相應位置設置兩根無粘結預應力大樑分別作為游覽廳屋面和樓面徑向懸挑支承梁的錨固梁,確保了它和塔筒的整體性和載的
  3. Then, a three - dimensional, comprehensive, steady - state mathematical model is described to investigate the fluid flow, heat transfer, species transport and electrochemical reaction in the pem fuel cells

    然後,發展了一個用於研究質子交換膜燃料池特性的三維綜合的數學模型,模型同時考慮了流體流動、熱量電荷傳遞、多組分化學動力學。
  4. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系分析計算的基本微分方程及應力-應變轉換原理,結合預埋測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  5. A simple and easy operating criterion is put forward in accordance with the relation between positive - sequence component and negative - sequence component of stator current when the motor is in unbalance and single phase broken. based on analyzing the traditional inverse time - lag overloading protection of motors, an inverse time - lag operating equation with accumulating stator current is achieved, according to the differential equation of the heating and cooling while the current flows into the conductor

    在分析動機統的反時限過負保護的基礎上,根據導體中流過流時的發熱、散熱微分方程得到了累加定子流的反時限過負保護動作方程,經簡化后得到累加定子流的實用的反時限特性推公式。
  6. Model of electrochemical reaction charge transferring on surface of mineral grain and its flotation significance

    顆粒表面化學反應電荷傳遞模型及其浮選意義
  7. The system and trouble are diagnosed, etc. the introduction of the new technology with electromechanical integration, especially the popularization application of the computer, and analyse through the supervision on operation conditions of the equipment, can get more intact load under various kinds of working states of handling machinery and compose, stress table and power transmit laws

    隨著機一體化系統和故障診斷等新技術的引入,特別是計算機的普及應用,通過對設備運行狀況的監測與分析,可以獲得起重運輸機械在各種工作狀態下的比較完整的載譜、應力譜和動力規律。
  8. This paper also analyzes the general loading precision and influencing factor for three components balance. at the same time, we calibrate the three - components mirobalance with this equipment

    通過高精度復位工件臺和視測量實現了微量天平的五分量體軸校;應用力的精密與轉換實現了微量載在水平方向的準確加載。
  9. Meanwhile, the influence of doping on oleds and the mechanism of doped oleds were investigated intensely. it is found that there exists a correspondent relation between doping concentration and luminescence phenomena

    摻入的染料由客發光體變成了主發光體,並存在從客發光體向主發光體的能量轉移。
  10. In the new balance calibration system, the calibration loads was loaded with an automatic device witch drived by a electric - motor, and the calibration loads be measured with high precise force measuring sensors. the force transmission device been carefully designed to avoid the interference of friction

    本文採用了機拖動、高精度力感器測量載值並閉環控制加載的方法實現天平校準載的自動加載,同時設計和優選了高精度施力機構,保證了校準載的加載精度。
  11. To validate the performance of the system, a series of experiments are made on a 200mw unit simulator of max1000 dcs. the results of these experiments indicate : by following certain physical principles, for each real component of the control system, the mathematical model which is constructed to reveal its characteristics reflects exactly the work and message transfer process ; by considering the load demand to the unit and the electricity net ' s frequency difference, also combing with the real capacity that the unit can stand, the ccs and deh models, which are contrived by using simulation blocks, can exactly harmonize the control of the turbine and the boiler and can also control the load.

    為驗證模型的性能,本文在基於max1000dcs系統的200mw機組模擬機上進行對建立的控制系統模型進行了一系列模擬試驗,試驗結果表明對控制系統的每一實際組件按照一定的物理規律所建立的反映其功能特性的數學模型,正確地反映了其工作過程及信息過程;利用模擬模塊開發的協調控制系統及功頻液控制系統模型能夠根據對機組的各種負要求和網的頻率偏差,結合機組所能承擔負的實際能力,正確地協調對汽輪機和鍋爐的控制,並對負加以控制。
  12. Decomposition of excitation spectra shows that the charge transfer band of eu3 + at the s6 site lies in the high - energy side of that at the c2 site, resulting in that the energy transfer from the host prefers to the s6 site

    光譜分解得出s _ 6格位的遷移帶位於c _ 2格位遷移帶的高能側, y _ 2o _ 3基質傾向于向s _ 6格位進行能量
  13. With an experimental system built and two different switches designed by ourselves, a serial of high - energy high - coulomb repetitive experiments were performed at voltage up to 100kv, peak current up to 85ka, charge transfer up to about 0. 6c per pulse, repetition rate up to 10hz, and single shot energy up to 5kj

    建立了一個高平均功率開關實驗系統,設計和實驗了兩種實用的三極重復頻率氣體開關。實驗獲得的最大工作參數為:工作壓100kv ,峰值流85ka ,電荷傳遞量0 . 6c脈沖,重復頻率10hz ,單脈沖能量5kj 。
  14. Based on the static loading test and stress testing of piles in situ of the project " taiyuan second long - distance telegraphic hinge ", some researches below have been conducted in this paper. the paper consists of the following two parts : the comparisons of load transfer feature of the resistance among the four types of piles ( that is, the normal cast - in - situ pile, the cast - in - situ pile with post - pressure grouting, the cast - in - situ pile with expanded - base. the cast - in - situ pile with expanded - base and post - pressure grouting ), the bearing capacity of piles affected respectively by the two types of construction technique

    本文結合「太原市信長途第二樞紐工程」樁基現場靜載試驗和樁身應力測試試驗,對比、研究了普通灌注直樁、后注漿灌注直樁、擴底灌注樁和擴底后注漿灌注樁四種樁型的特徵,分析了擴底、后注漿兩種施工工藝對試樁單樁承載力的影響。
分享友人