電遠離水 的英文怎麼說

中文拼音 [diànyuǎnshuǐ]
電遠離水 英文
electricity and water
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ形容詞1 (空間或時間的距離長) far; distant; remote 2 (血統關系疏遠) distant in relationship 3...
  • : Ⅰ動詞1 (離開) leave; part from; be away from; separate 2 (背離) go against 3 (缺少) dispens...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 遠離 : far away; aloof
  1. According to the test and observation indicated that mostly fish goes upstream and far away the sluiceway when fish migration, so fishway designed by us was arranged in the right bank of reservoir area and far away from the electricity generation hole intake upstream about 280 meters in order to induce the fish entering the fishway

    根據試驗和觀察表明,魚類洄遊時大都沿岸上溯,同時應道,故我們的魚道進出口是布置在庫區右岸,洞進口上游約280米處,以利誘導魚類進入魚道。
  2. Using ansys as analysis tool, and the influence of river water fluctuating on geoelectric observation data in different distance from riverway to geoelectric monitoring observe station is numerically simulated, and the relationship between error of observation data and distance from riverway to the stations is summarized

    摘要利用ansys作為分析平臺數值模擬了觀測系統距河道不同距情況下,由河漲落引起的淺層局部性非均勻性對地觀測數據的影響,總結了觀測系統距河道近與觀測數據誤差大小的關系。
  3. An increased oil content ensures t hat the electrostatic - induced viscosity perk occurs at a higher moisture level a nd at a grater distance from the dryer outlet in a vertical scraped surface evap orator

    化油腳進入濃縮器前,添加油脂,可以使由靜引起的粘度高峰提前出現,並濃縮器出口。
  4. The heartfelt and emotive waters of irrawaddy, featured in the movie beyond rangoon, is played with a beauty and depth of feeling characteristic of hans zimmer ' s cinematic pathos

    而令人感懷的《伊洛瓦底江之》是影《仰光》的配樂,馬克西姆以清麗的演奏充分展現了漢斯?季默影的感傷特點。
  5. With the development of the electric power system, static - state reactive power compensators ca n ' t have met the requirements of the actual production and operation, and the trend to the fast and dynamic compensation for reactive power become greater and greater. since ertan hydroplant and 500kv transmission systems in sichuan power system have been operated, many power plants of load center are forced to halt during the high - water period, because the great deal of power is transmitted to far - distance load center. thus the load center loses voltage sustentation and the level of the system stabilization is debased greatly

    四川網的二灘站和500kv輸變系統投入運行后,由於二灘站的大量輸送至負荷中心,迫使負荷中心的火機組在豐期大量停機,使負荷中心失去壓支撐,大大降低了網的壓穩定平;同時,因為四川網中的無功補償裝置全為靜態無功補償容器(或抗器) ,這些設備只能在系統正常運行狀態下起到無功補償和壓支撐的作用,而在網出現事故時,不但不能起到壓支撐作用,反而會促使壓崩潰事故的發生。
  6. With the increasing requirements for detecting distance, photoelectric module, including light source and modulation, can be put under water to reduce the loss of light power in the optical fiber transmission and transmit the detected signal to the signal processing workstation on the shore. optical transceivers must be applied to realize the low - rate optical communication between the workstation on the shore and the long - distance photoelectric modules under water

    隨著光纖聽器陣列技術的發展,可將光源與調制部分作為程光模塊置於下,減少光纖傳輸過程中光波信號的損耗,而直接將光纖的探測信號傳回岸基工作站進行處理,以增加光纖聽器的探測距
  7. With the gradual built of three - gorges hydraulic power station and the execution of the project " electric power transmission from west to east ", the hydroelectric resource is being developed at top speed and the hydroelectric occupy more and more specific weight. the continuous completion and commissioning of large hydraulic power station, as well as the continuous increasing of extra - high voltage and long distance power transmission system, deteriorate the stability control problem of hydro - electricity system

    隨著三峽站的逐步建成和「西東送」計劃的實施,我國的開發進入了高速發展的時期,大型巨型站不斷建成投運,超高壓系統不斷增長,在我國力系統中所佔比重越來越大。
  8. The thesis consists of two parts : a case and the case study. in the case, the general situation of water conservancy and hydroelectric engineering industry of guangdong province is introduced from three aspects of investment, engineering, and engineering enterprises. a series of tactic actions according to the market competition, which were carried out by the third water conservancy and hydroelectric engineering bureau guangdong province ( twcheb ) in the last four years, are reviewed

    在案例部分,首先從投資、施工和施工企業三方面介紹了廣東省行業的概況;再以局長林慶國為人物線索,詳細回顧了省三局在過去四年中針對市場競爭採取的一系列策略措施,卻無法扭轉頹勢,反而被昔日實力不分伯仲的省二局在後面;最後提出了省三局所面臨的市場困境。
分享友人