需量電費 的英文怎麼說

中文拼音 [liángdiàn]
需量電費 英文
demand charge
  • : Ⅰ動詞(需要) need; want; require Ⅱ名詞1. (需用的東西) necessaries; needs 2. (姓氏) a surname
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (費用) fee; expense; expenditure; dues; charge 2 (姓氏) a surname Ⅱ動詞(花費; 耗費) ...
  • 電費 : power rate; electric charge
  1. By setting up dummy variable regression equation, the effect of non - economy factors is analyzed quantitatively. 3. using artificial neural network to map the relationship between the household appliance percentage and average residential electricity demand, this paper presents an artificial intelligent method to forecast residential electricity demand

    建立帶有虛擬變的多元回歸方程,同時考慮了影響居民求的經濟因素和非經濟因素,定描述了非經濟因素(例如氣候、生活習慣、消習慣)對居民用的影響。
  2. Presently, the world largest scale and most influential brand meeting : 2004 international vehicle maintenance equipment exhibition attracts exhibiters from more than 100 countries and regions in the world to participate the conference in german frankfort. zonda auto group, the leader in chinese maintenance trade, introduced the new product which behalf the international advanced technology, such as paint equipment, became the spot light on the exhibition. the new product zd - 900 of zonda is a new - type of energy - conserving product, adopt international advanced technical, the heat system which the core parts of the product meet the high level demand

    車輛行駛時,可利用富餘功率給池充,無停車充,也不必增加充站該車每100公里油耗僅22 . 4升,比同等噸位的燃油汽車節油30 % ,加滿一箱油可行駛650公里尾氣排放達到了歐標準維修用僅為燃油車的1 3該車在國家汽車質檢測中心通過了54項強制性試驗,下線后已行駛1 . 7萬公里,表現出了良好的安全性能。
  3. Most of the current semi - physical simulators of the avionic system consist of special software and hardware, which results in the necessity to develop simulators independently for different avionic devices. simultaneously, according to the requirement of the software engineering, software must need to be strictly tested after developed or modified. this will consume much energy and time, and makes the software hard to be maintained

    當前的航系統半實物模擬器多是使用專用的硬體設備搭配專用的模擬軟體來實現的,這種專用性就造成了要針對不同航設備單獨開發模擬器的問題,同時按照軟體工程的要求,軟體的開發以及修改都要經過嚴格的測試,這就使得模擬系統的開發耗的精力和時間,同時使得模擬軟體難以維護。
  4. To prepare international standards for electrical energy measuring and electrical load control equipment ( such as watt - hour meters, var - hour meters, maximum demand indicators, telemetering for consumption and demand, equipment for remote meter reading, time switches, equipment for the control of loads and tarifs and consumer services ) including the equivalent electronic forms of these devices and their accessories

    負責制定能測和負荷控制設備(如:有功、無功度表、最大指示器、損耗和的遙測、遠程抄表設備、時間開關、負荷和率控制設備及用戶服務等)的國際標準,包括功能相近的運用子技術實現的設備及其附件。
  5. This paper, based on the electric policies of some city, compares in aspects of the capacities and electric powers of main equipment, initial investment, annual operating power costs and the economic analysis of ice storage air condition with normal air condition in different quantity of the storage - ice

    本文鑒于某市的價政策,通過計算某工程的設計日及全年空調負荷,得出各自所的設備容功率大小,分析比較了初投資及年運行等,並按不同的設計日負荷對此工程進行了不同蓄冰時的經濟分析比較。
  6. Loss of load cost, energy not severed, net loss and loss of load duration, are considered when deciding which load should be curtailed

    最終要停運負荷點時,切負荷策略綜合考慮了停損失用、停、網損和停時間因素。
  7. China three gorges project corporation ( ctgpc ) is in a important period of reorganization, and two communication departments belong to ctgpc incorporated at presently, thinking of many sides, must resolve them beginning with management. especially now, there are some failure on telephone management, such as redundancy of organization, iterative function, obsolete technique, lack of efficiency, wasteful workforce, large amount of workload and lack of accuracy so much and so on

    三峽公司正處于改制重組的關鍵時期,而原來三峽公司下屬的兩個通信部門剛剛合併,在許多方面都要從管理入手加以解決,尤其是在目前的狀況下暴露出在話管理方面的種種弊端,諸如機構重疊、話管理部分功能重復、技術陳舊、工作效率低、人力資源浪、工作大且準確率得不到保證等問題日益突出。
  8. The system is using the existing the network resources to obtain the prominent economic benefit through organizing the telephone communication without putting on the lines and purchasing the telecommunication network equipments, which is saved much costs such as equipment charges, lines charges, and project charges

    計算機網路話通信系統無鋪設話線路和購置話通信網路設備,節省大建設話網路的設備、線路和工程用,可取得顯著的經濟效益。
  9. Ddsy951 electronic single - phase advace - payment electric energy meter following as meter with a shielded and sealed construction, adops microelectromic technoligy to measure electricity and comes up to standard of gb t17215 - 1998 and gb t18460 - 2001. it collects handles and stores dataset with advanced monolithic processing system. the meter features in good abti - electromagnetism, low power loss, high precision, abstraction - of - electricity prevention, high overload and long service life

    Dtsy951子式三相預付液晶能表下稱表採用微子技術計能,符合gb t17215 - 1998和gb t18460 - 2001標準的表,採用全屏蔽全封閉結構,用先進的單片機處理系統進行數據的採集處理和保存,具有良好的抗磁干擾低自耗節高精度不校表防竊表高過載長壽命的特點。
  10. The winter suiting consigned to us has been in less demand because it is out of season. we have been in trouble how to dispose it. a certain source of purchase, however, today offered to buy the whole remaining stock at 6 % discount. the quantity of the stock as of today is shown in the enclosure sheet. we shall appreciate hearing from your comment on this matter by cable

    貴公司寄售的冬季衣料,因已過時,顧客求不多,我們對該批貨物的處理很周章。今天有一買家要求以6 %的折扣全數購買。茲附上存貨數,敬請察閱。尊意如何?盼即用報賜復為感。
  11. Electrical parameter includes voltage, current, power, frequency, power factor, and so on. the adjustment system of electrical network needs many panel instruments that can show the electrical parameter, such as voltage, current, power, cycle etc. tjsually these instrument is not accurate, wastes manpower resource, and the management of the data is inconvenient and easy to mistake. recently the development of micro - electronics technology and the advent of slsi. especially the advent of singlechip, lead to a new revolution in the field of instrument

    工參數一般包括壓、流、功率、頻率、功率因數等。在網調度自動化的設備中要配置多隻測顯示上述工參數的鑲嵌式面板表,如壓表、流表、功率表等等,其一般均為指針式面板表,精度低,可視距離近,數據要人工抄錄,浪人力資源,數據管理不便,容易出錯。
  12. The paper based on a great deal communications " literature and investigation of lanzhou telecom. it applies a great deal theories of market course to analyses the development tactics of lanzhou telecom ' s phs operation, for example, demand analysis of consumer, product life cycle, ability of competition, etc. the paper starts with analyzing the market circumstance of lanzhou telecom ' s phs operation

    本文是在閱讀大通信行業文獻資料和通過對蘭州信進行深入調查研究的基礎上,採取定性與定相結合、層層推進的實證分析方法,運用消求分析、產品生命周期、競爭力等相關理論,對蘭州信無線市話業務發展進行了深入研究。
  13. In the mode using constant rate water pump, pumps are put to run atfull capacity in all operation cycles, with no means for water flow rateregulation attached, incurring significant waste of electric power

    高位水箱造價較高,並且要增加樓房的設計強度,增加了投資成本。恆速泵打水總是滿負荷運轉,不能根據用水的多少調整泵流,因此浪能。
  14. We have to strike a balance between the extra cost of a new microcomputer and the extra convenience of a new photocopier

    在購買一部微腦所的額外花和一架新的照相復印機所提供的格外方便之間,我們得衡一下兩者間的得失。
  15. This paper chooses the indicators of economy and land quality input which has influence on the output, depending on cd - productive function to establish the function between input and output : y : productive forces of the cultivated land f : input of the fertilizer and agricultural chemical i : input of the irrigation l : input of the labor q : input of the land quality a : the level of average management t : the level of changing management a, b, c, d, f : productive elasticity coefficient the factor of the land quality includes texture, content of the organic matter, degree of the pickled, the structure of the soil

    本項研究選擇了影響農用地總產出的經濟投入指標和土地質投入指標,藉助c - d生產函數,建立土地投入產出的函數關系: y = a ? e ~ ( ft ) ? f ~ a ? i ~ b ? l ~ c ? q ~ dy為以土地總產值表示的土地生產力f為化肥和農藥的投入i為灌溉投入,即灌溉所用的水l為勞動力投入(考慮了農業機械投入的修正) q為土地質投入a為平均管理水平t為變化的管理水平a 、 b 、 c 、 d 、 f分別為各相應生產要素的產出彈性系數其中,土地質因子包括表土質地( t人有機質含矚入鹽漬化程度px土體構型p )等。他們之間的關系為: q ( a ; xt a 。
  16. Power demand side management ( pdsm ) plays an important role in the present electrical energy scenario now, as an efficient way to reduce the energy waste, to postpone the construction of new plants and to incentivate energy conservation

    求側管理在減少和減緩力建設投資、改善網運行的經濟性和可靠性、控制價上升幅度、減少力用戶開支、降低能源消耗、改善環境質等方面都具有重大價值和成效。
  17. At present, the problem in testing sheet resistance for micro - areas is that probes must be set up at the suitable locations by handwork. in order to know the wafer ' s impurity distributing, we need test many times, so will waste a lot of time. if the wafer ' s diameter would be 300mm, this problem will be more serious. in this paper, image analysis is introduced, through pre - processing and edge picking - up, the probe tips are recognized. then probe tips will be aligned respectively in two perpendicular directions through driving stepper motors. thus the distribution of sheet resistance for whole wafer is got by automatic testing and it offers information for detecting the impurity distribution and the diffusion uniformity

    這樣,完成200mm ( 8時)圓片雜質的擴散分佈要對許多圖形進行測試,要花很長的時間,當測試300mm矽片時問題就更為突出。本文將圖象與視覺測系統引入四探針測試系統中,對採集到的原始探針圖像進行預處理、邊緣提取等操作,以便實現探針針尖的識別,然後由機控制實現探針的自動定位。這樣測試系統可以自動獲得全片的薄層阻分佈,為超大規模集成路檢測雜質分佈和擴散的均勻性提供信息。
  18. Secondly, the generation of electricity and the sale of electricity increase slowly, the proportion and the cost of purchasing electricity go up. thirdly, the electricity expense due becomes more and more so that the operation of the electric grid becomes more and more difficult, and the knowledge on characteristic of demand is not enough to exploit the potential of power consuming market. finally, the concept of marketing is not based on the market, and the low level of service results in the simpleness of the marketing strategy, and the marketing system cannot meet the demand of the market changing

    市場化改革給供企業提出許多新問題,尤其是市場營銷面臨嚴峻的挑戰:力銷售由供不應求轉變為求不足;發和售呈低速增長,購比重上升,購成本增加;欠數額增長,網運營困難;用市場潛力深挖不夠,求特點了解不足;營銷思想沒有真正以市場為導向、服務水平不高、營銷策略較單一、市場營銷體系不能適應市場變化的要等。
  19. Clp has glossed over the fact that it has made a serious error in misjudging the duration of supply from the yacheng gas field in hainan island and it is hong kong that has to pay, both in terms of damage to the environment, and increased bills to its customers

    錯誤評估海南島巖城氣田的天然氣存,導致香港環境遭受破壞,市民多交,實屬嚴重失誤,然而中卻刻意隱?有關過失,市民有權知道個中因由。
  20. That would not only save billions of dollars in electricity bills, but also significantly reduce energy demand, environmental pollution and greenhouse - gas emissions

    不光會節約數百億的,而且會顯著減少能求,環境污染以及溫室效應氣體排放。
分享友人