需量計 的英文怎麼說

中文拼音 [liáng]
需量計 英文
demand meter
  • : Ⅰ動詞(需要) need; want; require Ⅱ名詞1. (需用的東西) necessaries; needs 2. (姓氏) a surname
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. The dissertatio n constructs the index system, introduces the coefficients of development, coordination, fairness, and the coefficient of sd, which is composed by the former three and can reflects the sd overall strength of watershed, brings forward the quantative criteria of in order that the research of wrcc is based on the good watershed ecology and environment, the dissertation, according to the ecological appropriate theory, builds the logarithm normal distribution model about the relation between the growth of natural vegetation and the depth of groundwater ; based on this relation model, proposes a quantitative method of ecological water requirement ( ewr ) of natural vegetation in arid area, which utilizes the results of rs technique and the spot testing data of vegetative physiology demand

    針對流域特點建立了基於水資源的流域可持續發展評價指標體系,引入發展系數、協調系數、公平系數,以及由其構成的衡水資源支撐社會可持續發展綜合水平與能力的可持續發展系數,提出了可持續發展的定判別方法。為保證在良好生態的前提下進行水資源承載能力研究,論文根據生態適宜性理論,建立了乾旱區典型天然植物生長與主要環境因子的偏態單峰對數正態分佈模型。基於此關系模型,利用遙感技術成果以及植物生理水的現場實驗數據,提出了乾旱區天然植被生態算方法。
  2. With the deveiopment of hydraulic technology, hydraulic system and hydraulicequipment are more complicated, hydraulic technology is more widely and morecomp1icatedly used in agricultural machine and their malfunction is more difficu1t to bedetected. fault diagnosis of hydraulic system is not as apt to be observed as that of themechanical equipmeflt or is not as easy to be detected as that of electric equipmeflt bymu1tipurpose meter or other meters. flux meter gage and pressure gage ca n ' t meet the needof fault diagnosis for hydraulic system because its working medium and workingcomponents are hiding inside the sealed vessel

    隨著液壓技術的發展,液壓系統及液壓設備越來越復雜,液壓技術在農機上的應用也變得廣泛而復雜,農機液壓系統的故障診斷也越來越困難,液壓系統的故障診斷不象機械設備那樣直觀,也不象電氣設備那樣通過萬用表等儀器測得,液壓系統的工作介質和工作部件都在密閉的容腔內,流、壓力表等測儀器遠遠不能滿足故障診斷的求。
  3. We adopt the " haichuanbool form " and " haichuanbo02 form ", which is designed and executed by maritime affair bureau of moc, to collect the data of auxiliary variable. the monthly arrival and departure freight tons of pws units

    匯總的港航監督所站月度輔助變數據,完全採用交通部海事局制訂執行的「海船舶01表」和「海船舶03表」 。
  4. Calculation method on ecological pondage and ecological water requirement of marsh

    沼澤濕地生態儲水及生態算方法探討
  5. The patient just needs to breathe in and out forcefully through a tube connecting his mouth to a special device called the spirometer, and relevant data could be obtained for analysis

    接受檢查的人士只用口含一條連接到特別儀器(肺)的喉管,然後用力呼吸,便可得知有關數據,以助診斷。
  6. The frame parts are important components to build the framework of the aircraft, which quality and efficiency of the machining determines the manufacturing time and performance of the whole aircraft. in present more time was spend in designing the fixture when producing the aircraft. so the technology of computer aided fixture design ( cafd ) was studied to meet the requirement of aircraft manufactuing enterprise to enduce the fixture design cost and enhance quality

    在結構件的數控加工中,要花費大時間進行夾具設,傳統的夾具設方式已成為縮短飛機生產周期的瓶頸,快速地設出滿足製造要求的夾具是飛機製造企業的迫切要,算機輔助夾具設正是為了適應這一要求而產生的。
  7. According to statistics parameters of the typical clouds over xi ' an region and cloud data obtained from the global distribution of cloud cover under the auspices of world meteorological organization, for xi ' an region typical cloud, the parameters of khragian - mazin cloud drop size distribution are obtained. based on xi ' an cloud water content profile, on earth - space paths, attenuation due to cloud are calculated by means of the k - m distribution. it is shown that the attenuation induced by cloud are taken into account at ka - at elevation angle smaller than 30 and v - band paths

    第三,根據西安地區氣象觀測數據,討論了西安典型雲的宏觀和微觀物理特性;根據西安典型雲的觀測結果和世界氣象組織提供的數據,得到西安典型雲的k - m雲滴譜參數;並根據西安地區雲的液水含算了地一空路徑上雲的衰減,結果表明,在v波段和仰角小於30度的ka波段路徑,雲的衰減加以考慮。
  8. Now the two issues we are confronted with are : first, a reasonable regularization technique is required to overcome the ill - posedness of the problem ; second, we are required to develop a computational efficient technique to reduce the complexity of the solving, which in turn promotes the implementation of the solving algorithm

    目前,逆問題研究中要解決的關鍵問題是: 1對逆問題中的病態現象,給出一種合理的正則化方法; 2減少逆問題求解所,增強求解演算法的可實施性。
  9. At present, the studies about the controlled alternate furrow irrigation are focused on how it affects the water physiological indexes, water consumption and yields of crops. but, some problems suc h as the soil infiltrative parameters, irrigating water advancing, water redistribution in soil, calculation of crop water requirement and water consumption, and the upper and lower limit indexes of soil moisture, guiding a field irrigation after the controlled alternative furrow irrigation is implemented in field, have not been researched systematically and deeply. if these problems could not been solved commendably, the popularization of controlled alternate furrow irrigation will be affected

    然而,目前有關交替隔溝灌溉的研究還主要集中於這種灌水方式對作物水分生理指標、耗水和產的影響方面,而對大田採用這種灌水式后的土壤入滲參數變化情況、作物與耗水算、以及指導大田灌溉的水分下限控制指標等與大田生產實際密切相關的幾個問題基本上還沒有進行系統的深入研究,而這些問題如不能得到很好地解決,勢必會對這種灌水方式的推廣應用產生嚴重的影響。
  10. During the calculation of crystallography, we always need to make some calculation such as vector length, angle between vectors or planes etc. this is a group of scilab functions which can make some common calculation

    晶體學算過程中經常算矢長度、矢夾角等。此scilab工具箱提供了一組適用於任何晶體結構的函數,可以在輸入晶格常數的前提下,算一些常用的晶體學數據。
  11. The siphon type can not realized automatic measurement and data handling and the tipping bucket type dynamic accuracy is not high. at the same time, the bigger inaccuracy exists in these two kinds of measurement methods. along with the science and technology and the requirement of society development, the automation to the meteorological factor gathers and meteorological data saves and data handling have been put forward to the higher requirement

    氣象部門長期使用的雨為虹吸式或翻斗式的,虹吸式不能實現自動測與數據處理,翻斗式動態精度不高,同時,這兩種方法測降雨存在較大的誤差,隨著科技和社會發展的求,對氣象要素的自動採集和氣象數據的自動存儲、數據處理也提出了更高的要求。
  12. This theses sets forth that the current situation and existing main problems in the course of practice of kanban system in electrolux changsha factory, which present in production layout, material supply, quality controlling, master production scheduling ( mps ) and mrp arrangement as well as information flows between factory and distributor, factory and supplier, etc. and that actions and improvement measures for implementation of kanban management

    本論文敘述了伊萊克斯長沙工廠實施看板管理過程中,在生產布局、材料供應、材料質控制、主生產劃及材料劃的制定、以及工廠與經銷商和工廠與供應商的信息流等方面當前的現狀和所存在的主要問題。以及為實施看板管理所採取的行動和改善對策。
  13. Cumulative demand meter

    式最大要電
  14. Statistics on german meteorological data for calculating the energy requirements for heating and air conditioning equipment

    德國採暖和空氣調節設備能算的氣象數據統
  15. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和正確性,並且與其它算理論的結果比較,證明公式有足夠的精度,可用做初步設中主纜線形的算,能夠滿足工程的要; ( 3 )對自錨式懸索橋主纜系統算理論進行了系統研究,包括成橋線形和內力算、空纜線形和內力算、鞍座預偏算、索夾安裝位置算和索鞍處主纜無應力長度修正方法。
  16. Water demand calculation of minimal river ecology

    河流最小生態
  17. Ningmeng, longsan reaches and its lower reach are studied as well ; from which the suitable and the minimum eco - environmental water demands for 10 important hydrographic sections of the main stream of the yellow river are put forward at last

    對寧蒙(下河沿頭道拐) 、龍三(龍門三門峽)和下游3個重要河段的河道生態、環境算方法及生態、環境耦合等問題進行了研究,提出了黃河幹流10個重要水文斷面的適宜生態環境水和最小生態環境水
  18. Review of calculation method for water demand of ecological environment

    生態環境算方法研究現狀
  19. The research about the method for calculating the basin ' s ecological water demand

    流域生態算方法的研究
  20. Discussion on caculation methods of varied eco - environmental water requirements

    不同類型生態環境算方法的探討
分享友人