非同步比特流 的英文怎麼說

中文拼音 [fēitóngliú]
非同步比特流 英文
asynchronous bit-stream
  • : Ⅰ名詞1 (錯誤) mistake; wrong; errors 2 (指非洲) short for africa 3 (姓氏) a surname Ⅱ動詞1 ...
  • : Ⅰ名詞1 (步度; 腳步) pace; step 2 (階段) stage; step 3 (地步; 境地) condition; situation; st...
  • : Ⅰ動詞1 (比較; 較量高下、 長短、距離、好壞等) compare; compete; contrast; match; emulate 2 (比...
  • : Ⅰ形容詞(特殊; 超出一般) particular; special; exceptional; unusual Ⅱ副詞1 (特別) especially; v...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 比特 : [計算機] bit (信息量單位)比特波形 bit pattern; 比特差錯率 bit error rate [probability]; 比特緩...
  1. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕潮汐區域並持續保持淤積狀態,在定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積例與來沙量密切相關,基本成正關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖路泥沙沉積分配的回歸計算式,據此可以預估計算河口不區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初探討。
  2. In this paper calculation methods of various characteristics curves considering magnetic field nonlinear effect of synchronous generators is systematically studied. the comparison between the results and those without consideration of nonlinear effect is given. the magnetic field nonlinear effect on the operating characteristics is analyzed and the possible factors causing the nonlinear phenomenon is presented

    本論文系統地研究了發電機在考慮磁場線性的影響下各種性曲線的計算方法,並與不計磁場線性時的結果進行較,分析了磁場線性對發電機運行性的影響以及可能引起磁場線性的因素,並研究在考慮三元變量作用下採用插值法估算發電機的勵磁電和功角。
  3. The technical and economic evaluation of thin - type spunbond nonwoven project has mainly finished the following research work : ( 1 ) utilize the theory and method of < marketing > for market investigation, research and forecast, analyze the developing trend and market requirement of the nonwocen abroad and at home, conduct quantitative forecast for raw materials and product price, and explain that during the essential period when liaoyang petrochemical company regulates the structure of industries and product and remodels the main business items, selecting to build up the production device for thin - type spunbond nonwoven is suitable. ( 2 ) introduce techniques of different companies to form different schemes. after analyzing the features of various schemes in the thesis, through building up the target system of four levels and utilize technical comprehensive evaluating way to conduct technical evaluation of four schemes for the thin - type spunbond nonwoven project and get the prior sequence from schemes d, b, a to c. ( 3 ) different technical schemes have various cash circulation amounts, economic evaluation is first based on evaluating and confirming feasibility of each scheme by the single scheme finance, select and use the method of multiple schemes comparison selecting - inutual repelling type multiple schemes optimization, select introducing the scheme of d company technique as the optimum, then conduct undetermined analysis to further test and verify feasibility of schemes

    闡明了遼化公司在調整產業結構和產品結構、重塑主營業務的關鍵時期選擇建設8000噸年薄型紡粘織造布生產裝置是適宜的; ( 2 )引進不公司的技術形成了不的方案,論文在分析了各方案的點后,通過建立四個層次的指標體系,運用技術綜合評價的方法,對薄型紡粘織造布項目的四個方案進行技術評價,確定了丁方案、乙方案、甲方案到丙方案的優先順序; ( 3 )不的技術方案有不的現金量,經濟評價首先在單方案財務評價確認各方案可行的基礎上,選用多方案選? ?互斥型多方案選優的方法,選擇引進丁公司技術的方案最優,而後,又進行了不確定性分析,進一驗證方案的可行性。
  4. Except for research on the unsteady flow at lower lock approach in siyang, jiangsu province by physical model, a two - dimensional numerical model is developed to explore the alternate research method in this paper. through studying the project using physical model and numerical model simultaneously, the governing equations, numerical algorithm and the computation accuracy of the numerical model are analyzed. comparison between computed results and experimental data gives that computed results is well agree with measured data under several water level cases, which indicates that the numerical model is valid and reliable

    通過數學模型和物理模型的研究,對數學模型的控制方程、數值計算方法以及數值模擬的精度與物理模型試驗進行了較分析,實測資料驗證的結果表明:該數學模型與物理模型一樣在不的水位組合,不的運行工況條件下都能正確地模擬下游引航道恆定的實際水力情況,模型計算結果與實測資料十分吻合,說明建立的數學模型是合理的,結果是可靠的,可以利用該數學模型進行船閘下游引航道恆定性的研究。
分享友人