非歸位式 的英文怎麼說

中文拼音 [fēiguīwèishì]
非歸位式 英文
non homing position type
  • : Ⅰ名詞1 (錯誤) mistake; wrong; errors 2 (指非洲) short for africa 3 (姓氏) a surname Ⅱ動詞1 ...
  • : Ⅰ動詞1 (返回) return; go back to 2 (還給; 歸還) return sth to; give back to 3 (趨向或集中於...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • : 名詞1 (樣式) type; style 2 (格式) pattern; form 3 (儀式; 典禮) ceremony; ritual 4 (自然科...
  1. By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel

    本文選擇黃河下游兩對相鄰水文站多年水沙資料,藉助多種數學方法尋找其中的線性擾動項,將隨機數學中分析、邏輯、納、演繹、隨機的思考問題方引入到線性水文預報中,實現沖淤河道相應水過程的有效擬合。
  2. When soil antecedent condition is dry and the initial rainfall intensity is high, peak surface runoff also considerably lag behind that of rainfall, because of the formation of temporary relative impermeable top layer ; b ) surface runoff is controlled primarily by infiltration - excess runoff mechanism under unsaturated condition ; the major fraction of surface runoff are dominated by saturated infiltration - excess runoff response, only a small fraction by return flow mechanism when soil is saturated ; c ) subsurface flow is dominated by saturated runoff mechanism, and the duration of subsurface post the rainfall end is dependent upon rather the soil properties than the rainfall characteristics ; d ) subsurface flow intensity in cultivated soil layer ( 0 ~ 20cm ) is high up to 35mm / h when rainfall intensity is up to 120mm / h, indicating the existing of macropores and pipe flow in cultivated layer

    2 )耕作制下紫色土的產流主要機制是: 1 )當雨前土壤含水量未達到飽和狀態時,表面產流起始時間有明顯滯后現象,這與紫色土的快吸水性和較多毛管孔隙密切相關;當雨前土壤較乾燥,降雨初期雨強較大時,易形成臨時相對不透水表層,表面產流峰也有明顯滯后現象。 2 )表面徑流的產流方主要是超滲產流,當土壤達到飽和狀態后,有四川大學博士學論文小部分回流發生,但主要是飽和超滲產流發生,因為紫色土的相對不透水層和其它透水障礙層不明顯。 3 )壤中流主要是飽和產流,與降雨過程有明顯的滯后,而且雨停后的壤中流產流歷時與降雨特徵無關。
  3. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本報告主要對口門加寬,口門西妥理工大學工程碩士專業學論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回計算,據此可以預估計算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模進行了初步探討。
  4. _ _ _ _ uncertain factors of macroscale inversion analysis of displacements are summed up. associated inversion model containing non - deterministic factors is proposed, i. e. " deterministic inversion of differential equation + systematic optimization technique = non - deterministic inversion ". the systematic optimization technique includes direct operator optimization, direct numerical analysis optimization, measurement design optimization, measured data processing, in - ersion algorithm optimization, and inverse operator regularization, etc. when this associated inversion technique is used in displacements back analysis, uncertain factors can be processed quantitatively

    納了宏觀尺度移反演分析的不確定性因素,提出了容納不確定性因素的移反演分析的聯合反演模,即「微分方程確定性反演+系統性優化技術=確定性反演」的模,並具體論述了聯合反演模的系統性優化技術,包括正演運算元的優化、正演數值分析的優化、測量設計優化、觀測數據處理、反演演算法優化、反演運算元處理等六個優化方法。
  5. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型以及塑性區大小的確定提供了重要依據。
  6. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,納總結出計算上下部結構相對移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞線(鋼棒連接)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  7. Moreover, the thesis analyses the necessity and scientificity of classifying the staff to knowledge worker and non - knowledge worker from the character of this two kinds of staff, and the existing theory localization of job stress and management. secondly, researches the knowledge worker and non - knowledge worker, obtains the new data by questionnaire, analyses the job stressor of these two kinds of stuff in china organization and the character of their pressure reaction, compares the differences of their apperception to the job stressor and the reaction to pressure provocation by analyses of correlation and analyses of regression. thirdly, according to the result of demonstration research, analyzes the character of job stress of the knowledge worker and non - knowledge worke, indicates the primary and subordinate work pressure of these two kinds of staff presently in our country 。 fourthly, aiming at the character of work pressure of these two kinds of staff, brings forward the principles of pressure management on organization lay, and the prompting management strategy in order to forming positive pressure as well as the controlling management strategy in order to preventing or removing or minishing negative pressure

    具體的研究工作如下:一、概述了知識員工、知識員工以及工作壓力的相關理論,並從知識員工與知識員工的工作特徵和現有的工作壓力及管理理論的局限性入手,分析了在我國工作壓力及管理領域中,將員工分為知識型與知識型兩大類來進行研究的必要性和科學性;二、以我國企、事業單中的知識員工與知識員工為調查對象,通過問卷方獲取新鮮數據,並通過數理統計方法分析目前我國這兩類員工群體所面臨的壓力源及其壓力反應的特點,通過相關分析和回分析比較他們對工作壓力源的感知、對壓力刺激的反應的差異;三、根據實證研究結果,分析知識員工與知識員工的工作壓力特點,分別指出目前我國組織中這兩類員工所承擔的主要、次要工作壓力;四、針對這兩類員工的工作壓力特點,從組織層面提出了壓力管理的原則、旨在形成積極壓力的激勵管理策略,以及能起到預防、消除或者減小消極工作壓力作用的控制管理策略。
  8. A study and experiment on severe rainfall with numerical weather forecast in ningxia using geostationary meteorological satellite infrared data in order to improve the ability of torrent rainfall forecast in ningxia, which locates in northwest of china with an arid climate, the relationship between geostationary meteorological satellite infrared data and summer hourly precipitation in ningxia was analyzed, the geostationary meteorological satellite infrared data were applied to retrieve the relative humidity at medium and low layers of atmosphere

    強降水預報是中尺度數值預報的難點之一。為了提高數值預報模於中國西北乾旱地區寧夏的強降水預報能力,本文研究了地球同步氣象衛星紅外資料與寧夏夏季逐時降水的關系。應用地球同步氣象衛星紅外資料,通過優選人工神經網路和最優擬合后的線性回這兩種線性方法,反演了寧夏自地表到300hpa不同層次的相對濕度。
分享友人