鞍尾 的英文怎麼說

中文拼音 [ānwěi]
鞍尾 英文
cantle
  • : 名詞(放在牲口背上馱運東西或供人騎坐的器具) saddle; sella
  1. Under an arch of triumph bloom appears bareheaded, in a crimson velvet mantle trimmed with ermine, bearing saint edward s staff the orb and sceptre with the dove, the curtana

    他騎著一匹乳白色的馬,它甩著猩紅色的長巴,轡裝點得十分華麗,馬籠頭是用金子製成的。
  2. The stout and muscular horses with short manes and knotted tails are standing foursquare on rectangular base slabs

    陶馬體態膘肥,梳短鬃,扎,披一袱。
  3. Problem set 2 : continuum approximations of non - stationary random walks, random walk in a harmonic well, steps with fat tails, saddle - point asymptotics

    問題2 :非穩定型隨機漫步的連續極限,具調合井的隨機漫步,具備巨大部的漫步,點近似解。
  4. Roads ( works, use and compensation ) ordinance ( chapter 370 ) ( notice under section 8 ( 2 ) ) - - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - tam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭及天水圍雨水排放系統改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬崗、元崗新村及田心村地區排水改善工程? ?附屬道路工程
  5. Roads works, use and compensation ordinance chapter 370 - notice under section 8 pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - kam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦田、牛潭及天水圍雨水排放系統改善工程第1階段第2b期- -錦田(工程組合d )擬建的長莆、馬崗、元崗新村及田心村地區排水改善工程- -附屬道路工程
  6. Roads ( works, use and compensation ) ordinance ( chapter 370 ) - - ( notice under section 8 ( 2 ) ) pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - - kam tin ( works package d ) road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) - - (根據第8 ( 2 )條規定所發的公告)工務計劃項目第92cd號元朗、錦田、牛潭及天水圍雨水排放系統改善工程第1階段第2b期- -錦田(工程組合d )擬建的長莆、馬崗、元崗新村及田心村地區排水改善工程- -附屬道路工程
  7. Roads works, use and compensation ordinance chapter 370 notice under section 8 - pwp item no. 92cd yuen long, kam tin, ngau tam mei and tin shui wai drainage improvement, stage 1, phase 2b - tam tin works package d road works ancillary to the proposed drainage improvement works in cheung po, ma on kong, yuen kong san tsuen and tin sam tsuen areas

    道路(工程、使用及補償)條例(第370章) (根據第8 ( 2 )條規定所發的公告) - -工務計劃項目第92cd號元朗、錦田、牛潭及天水圍雨水排放系統改善工程第1階段第2b期? ?錦田(工程組合d )擬建的長莆、馬崗、元崗新村及田心村地區排水改善工程? ?附屬道路工程
  8. Age structure and distribution pattern of pinus massoniana population in wuhan ma an mountain forest park

    武漢市馬山森林公園馬松年齡種群結構與分佈格局
  9. The most common model, the 47g introduced in 1953, can be recognized by the full bubble canopy, exposed welded - tube tail boom, and saddle fuel tanks

    最普通的貝爾47g在1953年投入使用,他擁有一個全玻璃的座艙,和一個暴露的金屬管焊接而成的機及馬狀的油箱。
  10. Shortly before 7. 30 am, a motorcycle travelling along ma on shan road towards kowloon reportedly stopped outside kam tai court due to a failure of the engine. a private car from behind, failing to stop in time, rammed into the motorcycle before ramming into a bus travelling in the same direction

    今晨約七時三十分,一輛電單車沿馬山路往九龍方向行駛,駛至錦泰苑對開時,由於引擎故障而停下,隨的一輛私家車收掣不及,先撞向電單車,然後再撞向沿相同方向行駛的一輛巴士。
  11. Experiment research of the water recycling of the tailings of no. 2 concentration workshop, donganshan sintering plant by thickening - purification

    山燒結廠二選礦濃縮凈化回水利用的試驗研究
分享友人