頂出點 的英文怎麼說

中文拼音 [dǐngchūdiǎn]
頂出點 英文
konckout point
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : Ⅰ名詞1 (液體的小滴) drop (of liquid) 2 (細小的痕跡) spot; dot; speck 3 (漢字的筆畫「、」)...
  1. Due to the multi - period tectonic movement and evolution of mechanical mechanism, syndeposition structures occur extensively in jiyang sag, the base of the sag subsided alternatively during the fault depression, which resulted in sinking of top bending and complicated block structure accordingly, reconstructed the syndeposition intensively, and produced the special structural landscape in combination with all levels of faults and sedimentary formations within it

    摘要濟陽坳陷由於受到多期構造運動的影響,在前第三系古地形高背景上廣泛發育同沉積背斜構造,然而由於坳陷在斷陷期基底滾動式沉降,造成撓曲部的塌陷,形成復雜的塊斷結構,使本區同沉積構造發生強烈改造,往往與各次級斷層或沉積地層相復合,表現獨特的構造景觀。
  2. Static mathematic model of drum accommodation and control is presented, and instruction model control strategy of sample intervals is presented based on differences between characteristic equations of lifting frame and characteristic equations of top and bottom board change among the sampling spots, the rules of this method are few, simple, easy to operate and meet controlling demands

    了滾筒調控靜態數學模型,並根據調高機構的調控特徵方程與采樣底板變化特徵方程的差異,給了在其采樣區間內的指令式控制策略,其方法的規則條日少、簡單易運算、符合實際控制要求。
  3. I ' m off for a breather. my deputy ' s your hostage

    去呼吸新鮮空氣,我的助手替我一下
  4. The measure of his degradation was not yet full.

    醜還沒有
  5. Firstly, the connected end sets of the relay lines are got using the breadth first search algorithm and the connected relationship of wiring terms is got in the electrical circuit diagram according to different cad block structure of different element type. secondly, the appropriate specification of the relay element is chosen by using the equinoctial graph algorithm, and the panel layout diagram is generated automatically by the combining automatic layout and manual intervention. finally, the optimized path algorithm which passes each vertex in the completed non - directional graph once and only once is put forward, this algorithm and the prim minimum spanning tree algrotithm can generate the inner panel wiring diagram and terminal wiring diagram automatically

    首先,採用廣度優先搜索演算法查找電氣原理圖中的連通導線端集,並根據不同類型的繼電元件對應的cad圖塊結構的不同,得到電氣原理圖中元件接線端子之間的連接關系;其次,根據二分圖匹配演算法為電氣原理圖中繼電元件選擇合適的型號和規格,並採用人工干預和自動布置相結合的方法完成屏面布置圖的自動生成;最後,提了完全無向圖中經過每個一次且僅一次的優化路徑演算法,利用該演算法和經過預處理的prim最小生成樹演算法自動生成屏內安裝接線圖和端子接線圖。
  6. The paper will study the upper questions based on the two interconnection networks. first, we give a fault - tolerant routing algorithm under the connectivity of the crossed cube in o ( n ) time and the length of the longest routing path ; second, with the rapid progress in vlsi, the failing probability of processors and links is very low, the traditional connectivity underestimates the resilience of large networks / here by applying the concept " conditional connectivity " introduce by harary, we show that the n - crossed cube can tolerate up to 2n - 3 ( n > 2 ) processors failure and remain connected provide that all the neighbors of each processor do not ' fail at the same time, the result is the same as the hypercube. we also give a related algorithm in o ( n ) time, and the length of the longest path ; third, we apply cluster faun tolerance introduced by q. - p

    根據menger定理, n -維交叉立方體可以容納n - 1個故障,我們給了它的時間復雜度為o ( n )的容錯路由選擇演算法及其最長路徑長度分析;在此基礎上本文證明, n -維交叉立方體的條件連通度為2n - 2 ( n 2 ) ,並給了相應時間復雜度為o ( n )的演算法及其最長路徑長度;除此之外,本文還證明當n -維交叉立方體中的故障簇個數不大於n - 1 ,其直徑不大於1 ,故障總數不超過2n - 3 ( n 2 )時,交叉立方體中任兩個無故障都至少有一條可靠路徑。
  7. Rooftops near any protrusions ( ie stairwells ). protruding stairwells, air vents, etc can be used as cover for anyone using a roof as a firing position

    靠近任何突物的屋(包括樓梯井) 。突來的樓梯井和通風口等等,可以被任何利用屋做為射擊的人當作掩體。
  8. The calculation method using in factory has larger error and is n ' t used in high ignition point oil transformer. in this paper a calculation method, which has been verified by experiment results, is presented based on the fundamental theories and rule equation of heat transfer to calculate the temperature rise of average oil, top oil, coil, core and hot - point. a program has been compiled

    本課題立足於工程實際應用,根據傳熱學基本原理和經典試驗換熱準則式,通過對變壓器發熱冷卻原理進行分析和研究,提了一套計算變壓器平均油溫升、油溫升、繞組溫升、鐵芯溫升和最熱溫升的計算方法並編制了計算軟體,對影響變壓器溫升的因素進行了分析。
  9. Some of the other players quit, but observant loungers took their places. time passed, and it came to twelve o clock

    有些賭徒退了,但是旁觀的一些游手好閑的人又了上來,時間在消逝,到了。
  10. Detail of young leaves and growing point ; many leaves reduced to bare midrib or narrow green corrugated residue of lamina ; youngest leaves and growing point brown and dead ; large green stipular lamina around crown

    缺錳甘藍的「鞭尾癥:關鍵在於嫩葉和生長,許多葉片露中脈或縮小成綠色波狀的薄層殘留,心葉和生長變褐並死亡,部周圍有大量綠色長有托葉的葉片。
  11. The large - span annular open - web cable truss structure is a new type of tensile structure based on cable dome. especially it is suitable for awning structures of palestra. little research work on this type of structure has been done abroad, and at home the research is blank

    大跨度環形空腹索桁結構體系是繼承于索穹結構、近年來才現並應用於實際工程的新型結構體系,具有顯著的特,特別適合應用於體育場的罩棚結構。
  12. The rain drummed against the tin roof of the prefabricated laboratory at great baddow in essex, where i was working as a navy scientist attached to the marconi company.

    落在埃塞克斯郡大巴多的、用預制構件蓋成的實驗室的鐵皮屋上,發咚咚的響聲。當時我做為一名海軍科學家,配屬于馬克尼公司,正在那個實驗室工作。
  13. One long, lanky man, with long hair and a big white fur stovepipe hat on the back of his head, and a crooked - handled cane, marked out the places on the ground where boggs stood and where sherburn stood, and the people following him around from one place to t other and watching everything he done, and bobbing their heads to show they understood, and stooping a little and resting their hands on their thighs to watch him mark the places on the ground with his cane ; and then he stood up straight and stiff where sherburn had stood, frowning and having his hat - brim down over his eyes, and sung out, " boggs !

    一個長頭發的瘦高個子,一白毛皮煙筒帽子推向腦門后邊,正用一根彎柄手杖在地上畫博格斯站在哪個位置上,歇朋又站在哪個位置上。大夥兒就跟著他從這一處轉到另一處,看著他的一舉一動,一邊頭,表示他們聽明白了,還稍稍彎下了身子,手撐著大腿,看著他用手杖在地上標有關的位置。接著,他在歇朋站的位置上,挺直了自己的身子,瞪起眼睛,把帽檐拉到眼的地方,喊一聲「博格斯! 」
  14. This fact led me to speculate that an axon could find its retinal cell neighbors in the tectum by homing in on chemical scents released by active tectal neurons, because its neighbors were most likely at the source of this trail

    這讓我懷疑,軸突是否可以藉著活躍的蓋神經元釋的化學物質,找到蓋里的視網膜細胞鄰居,因為它的鄰居最有可能就在這條路的起
  15. A color a e x is legal for an uncolored vertex v e v if by coloring v with a, the subgraph induced by all vertices of color a has maximum degree at most d

    v是合法的,是指由所有染顏色。的的子圖的最大度至多是d ,其中alice和bob每走一步都是用合法顏色染未染色
  16. A vertex with zero outdegree is called a sink.

    度為零的稱作收
  17. It will meet the moon four days after its discharge, precisely at midnight on the 4th december, at the moment of its transit across the zenith.

    它將在射四天後,即十二月四日半夜整,與月球相遇並穿過其
  18. The research on the embedded system and the embedded operation system reaches a new high. in this process, many hotspots come forth, one of those hotspots is ip set top box based on embedded linux operation system

    嵌入式系統與嵌入式操作系統的研究掀起了新的高潮,現了許多熱問題,其中使用嵌入式linux操作系統的ip機盒就是熱之一。
  19. Our officers, their families and guests assembled at the start line in harlech road, prepared to run the 3. 62km course

    廉署職員及家屬與嘉賓集山,準備跑畢全程共3 . 62公里的環山徑。
  20. ( 三 ) under the dynamic load of the explosion, the numeric analysis has been done and achieve the rule as follow : ( 1 ) when the frequency of vibration is 0. 3hz, the acceleration of the slopes top gets the maximum ; so 0. 3hz is believed the natural frequency of the slope as a whole ; ( 2 ) the vibration of explosion can been magnified because of the condition of the landform, when the relative altitude is up to 45m, the acceleration of horizon gets the maximum ; when the relative altitude is up to 100m, the absolute value of acceleration and the deformation of horizon is larger than that in the bottom of the slope ; ( 3 ) in the period of forced vibration, at the top of the slope, the acceleration of horizon become larger and larger ; at the middle part of the slope, it becomes smaller ; ( 4 ) when the explosion velocity of is much little, the shallow part destruction is the primary deformation of the slope

    (三)採用模態疊加法針對爆破動力作用,進行邊坡的動力響應分析,得了以下結論: ( 1 )振動頻率為0 . 3hz時,坡面部水平向加速度峰值最大;綜合考慮,可認為該邊坡的自振頻率為0 . 3hz左右; ( 2 )地形對爆破地振動存在放大作用,研究剖面的坡面,水平向加速度及位移在地形相對高差45米左右最大,而後隨相對高差的增高而減小,相對高差為100米時,水平向位移及加速度絕對值均大於坡腳; ( 3 )強迫振動段,水平向加速度值隨時間變化的規律為:坡總的變化趨勢是越來越大,而坡體中部節的變化趨勢是越來越小; ( 4 )當爆破振速較小時,變形破壞的形式表現為坡表面滑塌型。
分享友人