頂栓 的英文怎麼說

中文拼音 [dǐngshuān]
頂栓 英文
ejector
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  • : 名詞1. (可開關的機件) bolt; plug 2. (塞子) stopper; cork
  1. Andres had flattened at the click, the top of his head hard against the ground.

    安德烈斯聽到槍聲,立刻臥倒,頭狠狠地抵住地面。
  2. By analyzing and experimentally verifying the model, new ways of improving mixer performance were put forward. ( 1 ) heat water should be used in the mixer ' s temperature control to make the mixer work with optimal parameters. ( 2 ) the surface materials of the mixing chamber and rotors should be chosen rationally to change material surface energy and increase friction on them. ( 3 ) when the compound was processed under higher pressure of floating weight, shallow groovers or stripes parallel to the axle of the rotor should be made on the mixing chamber internal wall to increase the real contact area and improve mixing effect

    通過對模型的分析和實驗驗證,提出了提高密煉機混煉效果的新途徑: ( 1 )密煉機溫度控制採用溫水冷卻,使密煉機處于最佳工作狀態; ( 2 )通過合理選擇密煉室和轉子表面材料以改變材料表面能來增大膠料與它們之間的摩擦力; ( 3 )在上頂栓壓力較大的條件下,在密煉室內壁與轉子軸線同方向加工淺的光滑槽可明顯改善混煉效果。
  3. She was leaning over, with part of her upper deck above water, and you could see every little chimbly - guy clean and clear, and a chair by the big bell, with an old slouch hat hanging on the back of it, when the flashes come

    這條船已經一側傾斜,上艙一部分浮在水面上。電光一閃,煙囪的一根根小鐵鏈看得清清楚楚。還有大鐘旁邊一把椅子,背後還掛著一垂邊的舊帽子。
  4. In this test, a special bolt - jack is used to exent of prestressing force to brace angles as the whole structure is under dead - load. in this state brace angles withstand partly load before twice - load and the stress and strain of concrete are decreased. in this way the aim of removal of load and strengthening can be reached

    本試驗中採用專用螺千斤在恆定荷載水平下對混凝土柱角鋼撐桿施加預壓應力,使外包角鋼在二次受力前即分擔部分荷載,使混凝土應力水平和應變水平降低,達到卸載與加固同步進行的目的。
  5. Under the regulations, a hose reel system is required for every 30 m ; fire hydrants must be installed at staircases where fire hoses can be pulled out for use ; firemen should be provided with easy access to the fire scene, such as a lift that reaches the top floors within one minute ; there should be designated floors in high - rise buildings for occupants to take refuge, for instance, the provision of one such refuge floor for every 20 floors or so, in order to curb the spread of fire

    根據規定,每30米須設有消防喉轆在梯間須有消防,可以拉出水喉應用亦須有地方讓消防員容易進入火場,例如可在1分鐘內到達樓的消防電梯高層大廈還須有避難層的設施,例如每二十多層便有一層避難層,令火勢不容易擴散。
  6. Specializing in the production of jack, hydraulic wrench, hydraulic nuts, bolts hydraulic tensile, snorkel platform groove machine, demolition broken clamp, the manual hydraulic pump, electric and pneumatic hydraulic pumps and other hydraulic pump

    專業生產千斤、液壓扳手、液壓螺母、螺拉伸器、液壓升降平臺、坡口機、拆破鉗、手動液壓泵、電動液壓泵和氣動液壓泵等。
  7. Roofing accessories. strip metal bolt clamps with extended pin

    附件.帶鋼制嵌有廷長桿的螺卡箍
  8. Bolted on, top entry single access cover for ease of maintenance

    固定,部進入的唯一檢修蓋,便以維護。
  9. Abstract : some recommendations in design of fire hydrant system for 9 to 12 - storey residential buildings are proposed, these include the incorporation with the drinking water system, leaving out of roof water tank when the frequency control or pneumatic water supply facility with reliable power source is installed

    文摘:介紹了小高層住宅群消火系統設計動態,並提出與生活給水系統合併時,有可靠備用電源的變頻或氣壓給水系統可不設屋消防水箱,還建議修訂有關消防設計規范的內容。
  10. Secure your machinery by bolting it to the floor, then rounding off the bolt heads

    機器:用螺把機器裝嵌在地上,並把螺部磨滑;
  11. 7, and the material contiguous surface as above the crest bolt, mix the indoor wall and turn son is etc. to all plate hard chrome, since bear corrosion, and then locate pure

    7與物料接觸的表面如上頂栓混煉室內壁轉子等均鍍硬鉻,既耐腐蝕,又位於清掃物料,更換顏色確保色真。
  12. Bolt, pan head, amagnetic with cone point nf l 22 - 072 cross recess

    有nf l22 - 072十字槽錐磁性皿形頭螺
  13. Railway transport equipment. tank wagons and tank containers for carrying liquid chemical products. dome cover with a toggle - bolt closing device

    鐵路運輸設備.液態化學產品運輸用罐車和貯液槽.帶套環螺閉合裝置的圓
  14. ( 2 ) 3d - fem analysis for the load - bearing capacity of the stud connector as the prevailing method to determine the shear rigidity and the limit load - bearing capacity of the shear connector is the push test, which is time consuming and laborious, in this thesis the push tesi specimen of the stud connector is simulated through the non - linear analysis module of the msc / nastran and the numerical analysis results are in good coherence with that of the practicality lev ; as a result, the shear rigidity and the limit load - bearing capacity of the stud connector can be determined by the finite element method and only a few practicality verification tests

    ( 2 )釘型剪力鍵承載力的3d - fem分析針對當前剪力鍵一般通過費時費力的推試驗來確定抗剪剛度和極限承載力的狀況,本文利用msc nastran非線性模塊實現了對釘剪力鍵推試樣的數值模擬分析,數值計算結果與試驗結果能夠很好吻合。這使得通過有限元方法的模擬和少量實物試驗的驗證,就能確定釘剪力鍵的剪切剛度和極限承載力,可以大大節省時間和經費。
  15. Top - directly as a basis and foundation of the bearing surface as the top - embedded steel bearings or bearing surface, the supporting surface, the anchor bolt ( anchor ) position should be consistent with the allowable deviation of norms

    基礎面直接作為柱的支承面和基礎面預埋鋼板或支座作為柱支承面時,其支承面、地腳螺(錨)位置的允許偏差應符合規范的規定。
  16. 5, last bolt also in order to clip a set of structure, can also water cool off or the steam heat, bringing pressure through an air cylinder, the compulsive powder anticipates and the solid material is even to mix, exaltation produce efficiency

    5上頂栓也為夾套結構,也可通水冷卻或蒸汽加熱,通過氣缸施加壓力,強制粉料和固體物料均勻混煉,提高生產效率。
  17. It is carried on our research in this field from the multi - resident steel structure knot of beam - column research. there are various of knot style including top - and seat - angle steel, top - and seat - angle with double web - angle steel connections, extended - end - plate bolted connections and so on

    多層住宅鋼結構樑柱節點型式的研究到現在已有各種節點型式,如底角鋼連接,底角鋼、腹板雙角鋼連接,外伸端板高強螺連接,上下翼緣t型鋼連接,狗骨式剛性連接等。
  18. Roofing accessories. strip metal bolt clamps with inserted pin

    附件.帶鋼制嵌有相應長度桿的螺卡箍
  19. Roofing accessories. stamped sheet or strip metal bolt clamps with inserted pin

    附件.鋼板或沖壓帶鋼制嵌有相應長度桿的螺卡箍
  20. Standard specification for roof and rock bolts and accessories

    和石及附件的標準規范
分享友人