項目壽命期 的英文怎麼說

中文拼音 [xiàngshòumìng]
項目壽命期 英文
life of project
  • : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
  • : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • 項目 : item; article; clause; subject of entry; [體育] event
  1. As for a investment project of product operation, one should not only consider lcc, but also the whole income within product ' s life cycle ( i. e lci )

    對於一個購置產品經營的投資而言,不僅要考慮產品的全成本,而且還要考慮產品使用內的全部收益(即全收益) 。
  2. In the whole process of an engineering investment project, there must be various kinds of unstable factors that can take the positive or negative effect upon the project, but the final result is come into being by all these unstable factors. in order to ensure the real benefit, it is absolutely necessary that objective and re asonable analysis and evaluation of the risk be made and corresponding measures be taken. there is very important practical significance to improve the economy benefit of construction project investment in our country

    在一個工程投資的全過程中,會出現各種不確定性,每個不確定性都會對發生影響,但最後的影響結果是由這些不確定性共同作用而產生的,為了確保建設的實際收益能力,事先對其風險進行客觀、合理的分析與評價,並採取相應的措施是完全必要的,這對于改善我國建設投資的經濟效益具有十分重要的現實意義。
  3. The integrated management of the whole life cycle of construction project is always the key problem of the research on construction informationization

    建設的集成化管理一直是建設行業信息化研究的關鍵問題。
  4. The aeronautic weapon project is a kind of special project. it has characteristics of hi - technology, high investment, high risk, and long cycle etc. generally total lifecycle of aeronautic weapon embraces project demonstration, project design, project development, design conformation and production conformation stage, there are a large number of risks during each stage, the quality of aeronautic weapon project risk management directly influences the result of the aeronautic weapon project. how to identify every risk and analyze the influence of risk factors in different stage directly affects the result of risk management

    航空武器裝備是一種特殊,它具有高科技、高投入、高風險、長周等特徵,一般地,航空武器裝備全包括論證、方案設計、工程研製、設計定型和生產定型階段,在每個階段里都存在著大量的風險,對航空武器裝備風險管理的好壞直接影響著航空武器裝備的成敗,而如何準確識別各階段面臨的風險以及分析不同階段各風險因素的影響程度直接影響著風險管理的效果。
  5. The risk management includes the risk recognition, the risk prediction, the risk estimation, the risk plan, the risk control and the risk supervisory. it is a continuing process and can be carried in any step of the period

    風險管理包括風險識別、風險估計、風險評價、風險計劃、風險控制、風險監測幾個步驟,它是一個連續不斷的過程,可以在的任何一個階段進行。
  6. Pims is a kind of management system witch is applied for the all life cycle project under the environment of virtual organization

    Pims是在虛擬組織環境下應用於全建設的一種管理系統。
  7. The key point of the implementation of caiv method is the project performance design and the develop process, for the expense control of these two stages will determine the major part of the weapon model life cycle cost, therefore this paper mainly study the implement of caiv in the development project to the management and the optimized method of weapon equipment

    Caiv方法的實施重點是的性能、費用設計及研製過程,因為這兩個階段的費用控制將決定絕大部分的武器型號費用,因此本文將主要研究武器裝備的研製中如何實施caiv的管理方法和權衡優化方法。
  8. In this paper, on the base of analyzing the reliability operation status and the reliability data of 200mw units with the reliability management information system for jingyuan power plant, the feeble link and the key part of the generation set and system are defined and the corresponding measures are adopted, consequently, is increased the fault ratio of the device we can reduce and enhance security of the power plant, which is an effective method that controls the device reliability by using the mothod of systems engineering, namely plans, organizes, corresponds, controls and supervises the diversified engineering and technic activity of the reliability during the period of the whole device life to realize the reliability aim, minimize the cost of the whole device life and improve the general level of business safety production

    本文在應用靖遠電廠可靠性管理信息系統對該廠的200mw機組運行狀況和可靠性數據進行分析的基礎上,確定了發電設備和系統的薄弱環節、關鍵部位、並採取相應的措施,從而使設備的故障率減少,使電廠的安全性得以提高。這是一種利用系統工程的方法對設備的可靠性進行控制,即對設備全中各可靠性工程技術活動進行規劃、組織、協調、控制、監督,以實現確定的可靠性標,使設備全費用最低,提高企業安全生產綜合水平的有效方法。
  9. Analyzed life - span issues of every content, characteristic of stage to project, carry on the concrete exposition to quality, cost, progress three major meaning of control goal that carry throughout project especially, prove project life - span issues of every stage and systematic ness of the three control goals. combine traditional project a great deal of drawbacks that management mode have, theory and management inherit foundation of thought analyses and carry on project life - span issues of integrated necessity and feasibility of management in system. from project management two level, four stage and three major angle of control goal these, synthesize integrated concept, model, train of thought and implementation method after putting forward project management

    本文對工程管理在國內外的發展現狀、涵義及其系統性進行了總結;對工程項目壽命期各階段的內容、特點進行了分析,並重點對貫穿工程全過程的質量、成本、進度三大控制標進行了具體闡述;論證了工程兩個管理層次、各階段及三大控制標之間的系統性;結合傳統工程管理模式存在的諸多弊端,在系統論和管理集成思想的基礎上討論了進行工程綜合集成化管理的必要性和可行性;在前邊理論闡述的基礎上,從工程管理的兩個層次、四個階段以及三大控制標的角度出發,提出了工程綜合集成化管理的概念、模型、思路和實現方法;最後,通過一個簡單的工程案例對本文提出的集成化管理模式的可行性進行了驗證。
  10. In this article methods and applications for project bidding and risk management of the contract are discussed on basis of risk management of the project together with life cycle of the project from the viewpoint of a large state - owned contractor

    本文從大型國有承包商的角度出發,結合的特點,以的風險管理為基礎,對的投標及合同的風險管理方法與應用進行了初步的探討。
  11. The processes, tools and techniques used to manage product scope vary by application area and are usually defined as part of the project life cycle ( the project life cycle is discussed in section 2. 1 )

    用於管理產品范圍的過程、工具和技術隨應用領域的變化而變化,並常定義為項目壽命期(見2 . 1節)的一部分。
分享友人