項目組負責人 的英文怎麼說
中文拼音 [xiàngmùzǔfùzérén]
項目組負責人
英文
pets- 項 : Ⅰ名詞1 (頸的後部) nape (of the neck) 2 (款項) sum (of money) 3 [數學] (不用加、減號連接...
- 目 : Ⅰ名詞1 (眼睛) eye 2 (大項中再分的小項) item 3 [生物學] (把同一綱的生物按彼此相似的特徵分為幾...
- 組 : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
- 負 : Ⅰ名詞1 (負擔) burden; load 2 (虧損) loss 3 (失敗) defeat Ⅱ動詞1 [書面語] (背) carry on th...
- 責 : Ⅰ名詞(責任) duty; responsibility Ⅱ動詞1 (要求做成某事或行事達到一定標準) demand; ask for; req...
- 項目 : item; article; clause; subject of entry; [體育] event
- 負責人 : accountable person
- 負責 : 1. (擔負責任) be responsible for; be in charge of 2. (認真踏實) conscientious
-
During recently 3 years, i mainly engaged in mechanical vocation ' s plant planning. i attended 25 projects, which including feasible reports, preliminary designing and working drawing designing, ranged over establishment or technology reforming of machine tool factory, gear factory, tractor factory, automobile manufactory, electric pump factory, electromechanics factory, electric cable factory, the highest investment of them is 160 million yuan, total design work expand over 850 million ( no repeat calculate ). for i have professional ability and well up in developmental situation of mechanical vocation and it ' s situation inside jiangsu province, these projects what i designed were all authorized by leading department and expert, introduced into national plan and bring into operation. these projects bring both economic profit and society profit for the factory ' s technical advancement, product ' s update. as the director of these projects in these designing and consultation work, i generally organize and operate these and earn the higher valuation of leading department and consumer
近三年來主要從事機械行業工廠工程設計,先後參與二十五個項目的可行性研究報告編制,初步設計和施工圖設計.涉及機床廠,齒輪廠,拖拉機廠,汽車製造廠,電泵廠,電機廠,電纜廠的新建或技術改造,其中單項投資額最高的為1 . 6億元,總計完成投資額為8 . 5億元(未重復計算)的設計工作量.由於對機械行業發展狀況和省內狀況較為熟悉,具有一定的專業水平,這些設計項目均經有關領導部門,專家審定列入國家計劃,得以實施,為工廠的技術進步,產品更新換代,生產發展創造較好的經濟效益和社會效益.在這些設計,咨詢中,本人均任項目負責人,全面組織,實施設計工作,得到主管部門和用戶較高評價Dr kerry kirwan who is leading the team said, we have looked at the plastic covers and facias and looked at the ways we can minimise the environmental impact
科萬博士是這個項目小組的負責人,他稱: 「我們已經對手機的塑料外殼和顯示屏進行了研究,還考慮了採用能夠盡量減少環境污染的方法。It is the role of inspectors and veterinarians involved in meat inspection to ensure that meat is not only safe but also wholesome for human consumption. many aspects of animal health and food safety are involved in the journey of food from the farm to the consumers plate. november will see a group of chinese inspectors traveling to canada for further training in the canadian method of meat inspection
來自內江市獸醫衛生檢驗監督所資中縣動物防疫監督所資中縣銀山鎮公民真水南鎮重鎮等地生豬檢疫小組的負責人檢疫員共30餘人參加了本次現場培訓活動,學員在培訓過程中積極與terry hunt博士交流討論,並希望以後項目能多提供這樣的培訓機會。At present, the running mechanism of the regional economic cooperation between the eastern and the western depends mainly on two paths : one is to hold the conference of the enterprises among provinces to realize the interregional cooperation b y leading of the officials. the other is that the enterprises make decisions independently on the basis of the market mechanism
目前,東西部區域經濟合作的運作機制主要有兩條路徑依賴:一是以政府間經濟協作區負責人牽頭,舉行跨省區企業座談會實現區際合作;二是市場機制起基礎性作用,政府對區際利益關系進行協商,企業主要通過區際協調性組織搜索各種信息,自主決策實施具體的合作項目。During the technoligy reaching process, as the main person of this technoligy item, i did a lot of reaching work, and i utilized the way of quantitative and quatitative analysis, then i mainly put forward the possibility of the orgnic carrier heating. as the same time, as a person in change of teachnology of a unit, we put the techenic plan into effect, from the running of a set of equipment, the situation of a set of equipment, the situation of utilizing meet every requiment of technoligy
本人在該課題的研究過程中,從項目開始有意向起作為主要完成人,在做了大量的調查和研究工作的基礎上結合原有工藝特點,利用定性和定量的分析方法,著重提出了熱載體加熱的可行性,同時作為單位技術負責人,全面組織了該項目的落實,經一套設備的試運行現上海海運學院工程碩士論文使用狀況均達到各項技術要求。To establish service quality management system to make quality to be controlled in every layer, set up quality inspection organization organ with guiding team of project leader, technicians, team leader to perfect quality obligation system of every layer management staff to ensure authority to be divided and carried out
建立服務質量管理制度,使質量得以各層次控制,成立以項目負責人帶頭,技術員、班組長為領導班子的質量檢查組織機構,完善各級管理人員的質量責任制,確保職權分工落實。Here at washington center union mission, a shelter for the homeless, special projects manager julian smith says housing costs in the nation ' s captital have trippled over the past five years, really well for a few but forcing many belove the poverty line
位於華盛頓慈中心的慈善組織協會,一個專為無家可歸的人提供避難場所的地方,特別項目負責人朱利安.史密斯說首都的住房成本在過去五年裡翻了三翻,這對少部分人來說確實很好,但是卻迫使很多人生活在貧困線以下。During the training, the hosts organized the trainees to pay a field visit to the dairy product project sponsored by sichuan new hope group company at yangping of hongya county, jinli meat processing industrial co., ltd. in qionglai, and carrefour supermarket in chengdu. they had extensive discussions with executives of these corporations over such topics as the admittance of agricultural products into supermarkets and the operation of farmers associations
培訓期間,主辦單位還組織學員實地參觀了四川新希望集團在洪雅陽坪的乳業項目,邛崍金利肉業以及成都家樂福超市等,並和這些單位的負責人就農產品進入超市農民協會的運作等話題進行了廣泛的交流。Under the guide of pi dang ( professor dang anrong, from tsinghua university ), during the project, we investigated many historic sites and local culture, measured and calculated vegetative cover extent in the local field, we also did effective surveys and interviews related to public health problem
在項目組負責人,來自清華大學的黨安榮教授的指導下,項目實施期間,我們走訪調查了很多名勝古跡,研究了當地文化,對當地植被覆蓋情況進行了測量計算,我們也對有關公眾健康問題進行了卓有成效的調查和采訪。Answer : preparative job includes : understands workplace one, the moving circumstance of 2 equipment, this job has with moving equipment without direct connection, have the job that cooperates without need with other team and group ; makes working priority discipline and the blemish that prepare to solve and weak point ; the staff member makes clear to divide the work and be familiar with the concerned data such as blueprint and test gauge cheng ; should be had the blueprint that agrees with actual state, record that examines last, newest rectify spare parts of the instrument that decides requisition, test gauge cheng, qualification, machine parts or tools kept in reserve, tool and join lead to wait ; is a few righter important equipment, especially complex protector or couplet jumps loop protector, should weave test program, working controller should fill in ticket of protection safety precaution, examine and approve via technical chief, just can carry out
答:預備的工作包括:了解工作地點一、二次設備的運行情況,本工作與運行設備有無直接聯系,與其他班組有無需要配合的工作;制定工作重點項目及預備解決的缺陷和薄弱環節;工作人員明確分工並熟悉圖紙與檢驗規程等有關資料;應具備與實際狀況一致的圖紙、上次檢驗的記錄、最新整定通知單、檢驗規程、合格的儀器、備品備件、工具和連接導線等;對一些重要設備,非凡是復雜保護裝置或有聯跳迴路保護裝置,應編制試驗方案,工作負責人應填寫繼電保護安全措施票,並經技術負責人審批,方能實施。Ceo, general manager, account directors, customer service managers, sales directors, marketing directors, hr directors, project managers & project leaders, analysts & consultants, who want to improve the company project processes, project management competences or adopt a company project organization
總裁、總經理、會計主任、客戶服務經理、銷售主任、銷售經理、人力資源主任、項目經理和項目負責人、分析人員及顧問工程公司有意改善過程、項目管理能力、組織工程公司採用Prof. he fangchuan, dean of asia - pacific research institute of peking university and principal of the research group, made the concluding remark, pointing out that the topic research on the book history of domestic and foreign culture exchange has gained some achievements, and as the complete collection of their research fruits, the book has been scheduled as the key item of humanities in peking university
亞太研究院院長課題組負責人何芳川教授做了總結發言,他指出,中外文化交流史的課題研究已取得階段性成果,作為成果集大全的中外文化交流史一書已被列入北大人文學科的重點項目,在各位課題組成員的努力下,編寫工作年內將完成,他還就該書在學術上的突破點做了說明。Upon receipt of a project, the project director will work out a bilingual list of technical terms, organize a project team composed of competent translators interpreters with specialized knowledge backgrounds as required by customers and perform a full - length quality control, with considerations for high - efficiency and high - speed operations
項目接收后,項目負責人制定雙語術語表,根據客戶需要領域內具有專業知識背景能夠勝任翻譯項目的譯員組成項目組,全過程進行質量的全面控制,並同時做到高效率,快速度翻譯的原則。For projects that involve high - risk construction activities such as demolition and footbridge construction, specific advice is also provided by our safety advisory unit to the project team and the contractor for their consideration
對高風險項目,例如拆卸工程及興建天橋,本署的安全顧問小組會向工程項目負責人員及承建商提供意見。Hundred - product supervisor : be responsible for sugaring up project, organizes human resources to translate information, keep the teaching matters in order
百事英語主管:全權負責包裝項目,組織人力資源對資料進行翻譯,維持教學秩序。Ron previously worked for the aspectj group at xerox parc, where he led the first aop implementation projects and training for customers, and he was a founder and the cto of c - bridge, a consultancy that delivered enterprise applications using frameworks for java, xml, and other internet technologies
Ron以前在xerox parc為aspectj小組工作,在那裡他領導了第一個aop實現項目並負責客戶的培訓,他還是c - bridge的創始人和cto ,這家咨詢機構採用java的框架xml和其他internet技術提供企業應用程序。Article 23 a project principal shall organize and implement the research work in light of the project scheme, make original records on the implementation of the funded project, and submit an annual progress report concerning the project to the fund management organ
第二十三條項目負責人應當按照項目計劃書組織開展研究工作,作好基金資助項目實施情況的原始記錄,通過依託單位向基金管理機構提交項目年度進展報告。The main reason leading to such problems are found including organization structure is not reasonable in establishment ; responsibility, right and benefit is not reciprocal, process of object management is not unobstructed and so on the critical problem is organization structure is not reasonable in establishment, so, the optimized design of the object management system is made. firstly, three designed plan of organization structure is offered, they are competent organization structure, object organization structure and matrix organization structure, after the comparison between advantages and shortcoming and experts evaluation, the matrix organization structure is suitable for the institute. secondly, optimize the design of selection of object manager and management system, the institute adopts object manager responsible system
首先對組織結構進行優化設計,提出了三種組織結構設計方案,即職能事業部式組織結構、項目式組織結構和矩陣式組織結構,經多方案優缺點比較和專家評價,確定出該院應採取的是矩陣式組織結構模式;其次,對項目經理挑選與管理系統進行了優化設計,該院項目管理實行項目經理負責制,項目管理的成功既取決于項目經理個人,又取決於一個強有力的項目團隊,因此建立了一套相對完善的項目經理挑選與培訓程序和合理的項目管理系統;然後,結合勘察設計項目管理的基本內容和程序,按照iso9000族標準及該院質量管理體系文件的規定,對該院項目管理流程進行了優化設計,實現了該院項目管理流程的規范化、程序化和高效化,以確保項目管理取得圓滿成功。Given an organization chart and a listing of team members, process owners, and sponsors, the six sigma black belt should be able to identify projects with a low probability of success
譯文:給出一份組織圖和團隊成員名單、過程負責人和發起人,六西格瑪黑帶出哪些成功機率很小的項目。Based on the project and its characteristics, how to application and research construction proposal for large - scale metallurgical factory project is what i did. through the compiling, i have been systematically researching the whole construction process, and have it a guide plan, which can control the whole construction program. in this way, my practice capability improved a lot
筆者為該項目的施工建設總負責人,正在組織工程的施工建設,因此以該項目為載體,對大型冶金工程施工組織設計的編制進行了應用研究,結合該工程的特點,系統地研究了該施工組織設計的全過程,以求得更好地成為指導工程建設的全局性的控制文件,並通過具體實施不斷總結,以此來提高筆者在實踐當中的應用能力。分享友人