順序凝固 的英文怎麼說

中文拼音 [shùnníng]
順序凝固 英文
directional solidification
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 動詞1. (凝結) congeal; curdle; coagulate 2. (注意力集中) fix
  • : Ⅰ形容詞(結實; 牢固; 堅硬) firm; hard; solid Ⅱ副詞1 (堅決地; 堅定地) firmly; resolutely 2 [書...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 凝固 : solidify; solidification; coagulation; congealing;clotting; hardening; solidifying; freezing
  1. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混土配合比,混土灌注從兩端至中間、先底板、后腹板、再頂板的施工和斜向分段、腹板水平分層、附著式振搗為主、插入式搗為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  2. Abstract : by mean of adjusting the position and shaps of risers, shrinkages and porositi es in balancing axle case are eliminated on the principle of direirional solidification, its density is a lso improved

    文摘:根據動態順序凝固的原則,對斯太爾平衡軸殼鑄鋼件設計合理的冒口位置和形狀;有效地消除了鑄件熱節部位的縮孔,提高鑄件的緻密度。
  3. Melting temperature, putting in sequenceiof raw material, chemical composition and flux type affecting structure morphologies of altib master alloys in producing process of master alloys has been systematically investigated from the view of al - ti - b master alloys heredity. and we study the effect that different master alloys refine commercial al and al alloys

    本論文主要從altib中間合金遺傳性的角度出發,系統地研究了在制備中間合金的過程中,熔煉溫度、原料加入、 ti含量、速度、原料的化學成分和熔劑種類等對中間合金組織形態遺傳性的影響。
分享友人