順序控制接法 的英文怎麼說

中文拼音 [shùnkòngzhìjiē]
順序控制接法 英文
wiring for sequence control
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 動詞1 (告發;控告) accuse; charge 2 (控制) control; dominate 3 (使容器口兒朝下 讓裏面的液體慢...
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • : Ⅰ名詞1 (由國家制定或認可的行為規則的總稱) law 2 (方法; 方式) way; method; mode; means 3 (標...
  • 順序 : 1. (次序) plain sequence; subsequence; order; sequence; succession2. (順著次序) in proper order; in turn
  • 控制 : control; dominate; regulate; govern; manage; check; cybernate; manipulate; encraty; rule; rein; c...
  1. Several key techniques of carving and milling machine cnc system are deeply studied they include : the transformation, data rebuild and interface design of huge volume nc program produced by cam ; the algorithm of cubic parametric spline pre _ interpolation and high speed real time interpolation in the cnc system, which. will gain a much higher surface precision and cutting speed ; methodology and algorithm of movement velocity acceleration control on a real time forecast _ and _ prejudge basis is designed. therefore, a smooth movement is insured. the shake and noise problem caused by non _ uniform pules for driving stepping or servo motor is solved by an improving algorithm to generate uniform pules

    同時,本文對基於統一的pc平臺的雕銑機數系統中的幾項關鍵技術進行了深入的研究,包括: cam生成加工程的傳送、收、讀取及其加工鏈表的生成和實時重構;對cam生成的離散數據進行三次參數樣條插值和基於累加弦長的三次參數樣條插補,保證加工工件表面的精度和光性;設計具有「前瞻」功能的自動升降速,保證加工過程的平穩性;通過脈沖均勻化,有效地解決加工過程中因為脈沖不均勻而引起的震動問題。
  2. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直關繫到工程項目的投資、質量和工程進度的好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程和方,施工單位遵循一定的監理程,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目利實施的信息管理、溝通管理、沖突管理和風險管理。
分享友人