順砌 的英文怎麼說

中文拼音 [shùn]
順砌 英文
[磚] facing bond順砌構造 side construction
  • : Ⅰ介詞1 (向著同一個方向) in the same direction as; with 2 (依著自然情勢; 沿著) along; in the d...
  • : 砌Ⅰ動詞(用磚、石等壘) build by laying bricks or stones Ⅱ名詞(臺階) step
  1. Special landform condition accomplishes extremely characteristic space relationship of landform, plant and water, and water goes down continually along the layer stone, building dynamic and capricious waterscape, luxuriant plant community forms green barrier, increasing the ecology effect of garden region

    特殊的地形環境成就極具特色的地形、植物與水的空間關系,水體的整石源源不斷的跌落,營造動態多變的水景,茂密的植物群落形成綠色屏障,更增添園區的生態效果。
  2. In the early times, we once lived on a piece of land where there was a dilapidated house leveled almost to the ground. master was able to build a simple house on the remaining foundation and walls. she did everything herself, mixing concrete, laying bricks, plastering walls, setting up wooden frames, hammering big nails, and even doing the plumbing

    當時我們所住的那塊地上,有一處幾乎只剩地基的斷垣殘壁,師父就著它所殘留的形勢在地上繼續蓋起一棟簡單的房子,從拌水泥磚塊抹墻壁架木頭槌大釘接水管等等,無不親自動手。
  3. Tkenny or, principal of smallcampus. net, believes the q9 cis is the perfect input system for primary school students. " unlike secondary school students, primary school students do not have the ability to learn keyboard - based chinese input methods such as chang jei. q9 users only need to identify the shape of the upper part a given character and do not need to learn stroke sequences or complicated input methods

    資訊小校園校長柯佳列先生表示:由於小學生與一般中學生不同,語言水平尚未達到能掌握一般如倉頡的復雜鍵盤輸入法,九方只需九鍵作輸入,並能以字型字,不需強記筆或其他復雜的輸入規則,便能作文字輸入,實為在學習中文語言的學生提供一個最佳的中文輸入方法。
  4. Test showed that under level loads the damage process of multi - ribber slab was according to the order of silice bric ^ concrete frame ^ outer gimbal, released energy classificately, had perfect energy consume and anti - collapse capacity

    試驗表明密肋復合墻板在水平荷載作用下破壞過程按「塊,框格,外框」的序進行,能夠分級釋放能量,表現出了良好的耗能能力及抗倒塌能力。
  5. The research suggests that the failure process of the multi - ribbed composite walls under horizontal seismic loads is : the cracks of the infilled silicate bricks and the cracks of the inner rib beams and rib columns - the cracks of the outer frames ; and that the walls can release energy by stages, showing perfect capacities of energy dissipation and collapse resistance

    研究表明:復合墻板在水平地震力作用下,其破壞過程按「填充塊?肋梁肋柱?外框架」的序進行,分級釋放能量;試驗中墻板大部分發生剪切滑移破壞;墻板的平均抗剪承載力、延性指標、耗能及抗倒塌能力明顯優于組合磚墻。
  6. This system is the new type, in which the connection between the special - shaped column and concrete block is stronger than that of frame structure and the dark beams are located and its constructional sequence is brickwork first and placing columns second and concrete blocks are as bottom forms when beams are placing

    這種新型結構形式的主要特點包括:異形柱與塊為馬牙槎連接、墻體內含有暗梁、施工序為先墻后澆柱、梁澆築時以塊為底模。
  7. The causes may be explained as follows : the lagging of legal construction ; the flaw of present supervision system ; unsoundness of market environment ; the lagging of construction of banks itself etc. as to price - making mechanism of obs, some basic principles must be obeyed and value - based mode should be employed

    J瓜以月以加。如伽如咖tofco二, 。a丙步履維艱;存款大戰大大增加了銀行的籌資成本;居民活期存款向定期存款轉移使銀行利息成本上升;銀企關系不,逃廢債多
  8. By adopting the calculating analysis method of elastic - plastic three - dimensional fem numeric simulation, this paper makes a simulation analysis on the structure stability of the shallow cover and unsymmetrically loaded parts in tongyoushan tunnel, mainly simulates the effects caused by different construction orders on surroundings and supporting structure stability, and it centers on the analysis on the weak part, the midwall in the lining of the connecting - arch tunnel

    摘要採用彈塑性三維有限元數值模擬計算分析的方法,對桐油山隧道淺埋、偏壓地段結構穩定性進行了模擬分析,主要模擬了不同施工序對圍巖及支護結構穩定性的影響,重點對連拱隧道整體襯中的薄弱環節中墻進行了分析。
  9. We have accomplished the building project of 240 tons circulating fluidized bed boiler at jilin chemical fibre group, it marks a new stage of our development in the field of large - scale furnace building project

    我公司吉林化纖240噸循環流化床鍋爐築工程的利完工,標志著我公司在大型鍋爐築工程領域又上了一個新的臺階。
  10. By adopting jet grouting, ground water was controlled effectively, and thus further excavation and implementation of the scheme of grouted rubble revetment were ensured

    採用高壓旋噴注裝進行止水防滲處理后,地下水得到了有效的控制,保證了基坑進一步開挖和裝塊石護坡方案的利施工。
分享友人