  1. The civil engineering contractor may need to lay out his own casting yard.

    土木工程承包者可能需要設置自己的預制場
  2. The optical fiber preparation collapsar plc control system is a set of equipment that be using at the scene by yofc

    光纖棒熔縮機plc控系統是長飛光纖光纜有限公司正在工業現使用的一套生產設備。
  3. The box girders were to be precast units, bonded together in place at the joints with an epoxy resin.

    箱梁採用構件,在現連接處塗以環氧樹脂,以粘結成為整體。
  4. The construction of foundation, it is that the directions of development are full - length, integrant, preliminary of factory ' s and mechanization in

    國外的在深水基礎上的主要動向也十分明確,即向基礎結構的大型化及整體化、施工工藝的工廠化及現施工機械化的方向發展。
  5. 5 ) a new type of superposed beam used in wutaizha terminal market, with notch at each end of the prefabricated member, is analysed, and design method of it is also regard as the representative of the superposed beam with notchs

    5 )針對武泰閘農副產品市工程中使用的帶槽構件疊合梁,根據前面提出的計算方法,總結了這類形式的疊合式受彎構件的設計計算原則以及計算方法。
  6. Study on prefabrication technique for fair - faced concrete stand in shanghai international f1 circuit

    1上海國際賽車清水看臺板技術的研究
  7. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁廠製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  8. When the prefabricated plant is under the viaduct, the monolithic box girder is lifted by the gantry crane and transported by the special rotary traversed platform, and then transported and erected by the bridge girder transporting and erecting machine

    設在高架橋下時,採用提梁機提起整孔箱梁,通過特製旋轉式橫移平臺喂梁,運架一體式架橋機運梁和架梁。
  9. Expanded polystyrene case - bay fillers for concrete floors with prefabricated binders and dividing floor

    梁和現澆注混凝土樓板斂縫用膨脹聚苯乙烯
  10. During the temperature fields, the results indicate that the processing parameters such as the extrusion velocity, casting temperature, perform preheating temperature, die preheating temperature and so on are important for the temperature fields besides the dwell time. they are must be in concordance each other to the deforming zone is in the quasi - solid state, and the stable semi - solid extrusion is implemented. during the deforming fields, the hyperbolic sine thermo - rigid - viscoplastic fem model is selected according to the forming feature of the process, and the variations of the stress - strain fields are studied

    在溫度的模擬中,模擬結果表明,保壓時間是影響製件成形質量的關鍵因素之一,擠壓速度、液態金屬澆注溫度、熱溫度和模具熱溫度等工藝參數對溫度的影響也很大,需進行參數之間的協調,只有當變形區內部始終維持準固態時,才能實現穩定的液-固擠壓成形過程;在變形的模擬中,根據液態浸滲擠壓的成形特徵,選用了雙曲正弦剛-粘塑性有限元計算模型,研究了變形過程中應力應變的變化規律,研究了模角對變形和金屬流動的影響及變形力的變化過程和其影響因素。
  11. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    催化裂化裝置中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧化碳余熱鍋爐的內襯,也適用於軋鋼加熱爐、各種煅造爐、電阻爐的爐頂、爐墻、爐底高溫部位的現澆注,可製成構件。
  12. Observations obtained from overseas sources as well as from local networks are decoded and quality - checked for doubtful or erroneous data. short - range forecast fields i. e. 3 - hour forecast from 20 - km inner model and 6 - hour forecast from 60 - km outer model from the previous model run are used as first - guess or background in assimilating the latest observational data. objective analyses are then carried out and currently a three - dimensional optimal interpolation method is used to prepare the initial fields for the model forecast

    天文臺從海外及本地網路取得觀測資料,經過譯碼后,便會進行質量控檢查,把可疑和錯誤的數據剔除,然後利用上一次模式運行所得出的短期,即20公里內模式的3小時報及60公裡外模式的6小時報,作為初估背景,再注入最新觀測數據,進行客觀分析,以得出模式報的初始
  13. Along with the constant progress of society and the incessant advancement of production, house decoration is transiting from traditional handwork in locale to the way of assembly house decoration mode, including the factory ' s preparation, mechanization of production and installation in the spot

    隨著社會的不斷進步和生產力的不斷提高,住宅裝修行業必然從傳統的現手工作業走向工廠、機械化生產、現裝配的裝配式住宅裝修發展道路。
  14. Precast concrete casting yard

    混凝土澆灌
  15. The national centre of quality inspection and the experts from the circulating association of building material of china have asserted that epdm colored rubber granule is one qualified building material of environmental protection, which assured safety and nonpoisonous substance involved in

    該產品的型epdm塑膠跑道卷材已在全國各地大型體育館田徑地鋪裝。 epdm彩色顆粒已遠銷北美歐盟東南亞等國家及國內各地區市
  16. Based on the study idea of the former pile else, this paper has conducted and discussed the mechanism of consolidation, settlement calculation and optimization design of the pcc pile according to the test in situ results and reasoning. it includes the followings in detail : ( 1 ) compared with the precast tube concrete pile and tube sinking concrete pile, the merits and shortages, construction machine, construction technology of the pcc pile and pcc pile composite foundation are introduced in detail to make the pcc pile be known completely by engineers

    本文在借鑒其他樁型的研究的基礎上,通過現試驗研究和理論推導,對pcc樁處理軟基加固機理、沉降計算和優化設計等進行了較為深入的研究和探討,具體包含以下幾方面的內容: ( 1 )在與管樁和沉管灌注樁等樁型比較的基礎上,對pcc樁的優缺點、施工機具設備、施工工藝、技術作用機理以及pcc樁復合地基技術特點等進行了述評。
  17. Workmanship on building sites - code of practice for concrete work - sitework with in situ and precast concrete

    建築工地操作工藝.混凝土作業實用規程.現作業和混凝土
  18. The contractor shall submit work plans for the work to be undertaken in compliance with the quality assurance requirements of the contract conditions including off site precasting

    承包商應按照合同條件中的質量保證要求遞交工作計劃,包括工地地外的工作。
  19. Extension and reconstruction of precasting yard for 500 t semi - circular cylinders and caisson cylinders

    半圓體與箱筒預制場的改擴建
  20. Raw material should be sepaall re - bars shall be fabricated in the prefabrication area and piled together as per the specification, type and piled with tags

    3原本材料必須分規格堆放,且掛牌標識。鋼筋應在預制場集中加工成型,分規格、型號堆放並配上鋼筋規格標示牌。