預制廠 的英文怎麼說

中文拼音 [zhìchǎng]
預制廠 英文
factory for prefabrication
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  • : 廠同「庵」 (多用於人名)
  1. This paper takes mobile engineering department equipment management of daqing petrochemical parent company as an example, and studies the design and application of equipment management system of daqing petrochemical parent company, for the implement of computerizing the equipment entire process management with the equipment management system and completing the synthesis management, the records management, the expense management, the fixed asset management, the specialized management and the information management with the computer system and making in the manual management some qualitative and stochastic ingredients transforming into the quantitative standard management. so it guarantees that we can perform advanced predicting management in the entire process of the matter movement and the value movement of equipment and complete the equipment servicing transition from the compulsory servicing and afterwards servicing to the preventive servicing, improving work quality, efficiency and modernized degree which the equipment manages and assisting enterprise ’ s equipment management decision - making and the whole realization of management goal and enhancing the enterprise ’ s interior equipment utilization and realizing its maximum profit

    本文以大慶石化總機動工程部的設備管理為例,對大慶石化總設備管理系統的設計與應用進行研究,旨在通過設備管理系統實現設備全過程管理計算機化,由計算機系統來完成設備的綜合管理、檔案管理、費用管理、固定資產管理、專業管理及信息管理,使人工管理中一些定性的、隨機的成分轉變為定量的規范的管理,保證大慶石化總對設備的物質運動和價值運動的全過程實行先進的可知性管理,並逐漸將設備維修從目前的以強性維修及事後維修為主過渡到以防性維修為主,提高設備管理的工作質量、效率和現代化程度,輔助企業的設備管理工作決策及經營管理目標的整體實現,提高大慶石化總內部設備的利用率及實現其最大的經濟效益。
  2. Precast concrete products - general rules for factory production control of metallic fibered concrete

    澆鑄混凝土產品.金屬纖維混凝土工生產控的一般規則
  3. Precast concrete products - general rules for factory production control of metallic fibered concrete ; german version en 14650 : 2005

    澆鑄混凝土產品.金屬纖維混凝土工生產控通用規
  4. Abstract : large time delay exists in complicated practical processes. for example, in fccu ( fluidized catalytic cracker unit ) reactor - regenerator, the feed is preheated through heat exchanging from fractional column slurry, thus results in large time delay. a predictive control system is designed for such processes, where the kernal algorithm is dynamic matrix control. application results show that the control behavior is improved than original pid control

    文摘:實際的復雜工業過程,往往具有大的時滯,例如:煉油催化裂化裝置的反應再生系統,其原料油熱通過油漿換熱實現,因此時滯特別大.本文針對這一類大的時滯過程,設計了以動態矩陣控為核心演算法的測控系統,運行實踐表明:這一控方案比原pid控在控質量上有較大提高
  5. The construction of foundation, it is that the directions of development are full - length, integrant, preliminary of factory ' s and mechanization in

    國外的在深水基礎上的主要動向也十分明確,即向基礎結構的大型化及整體化、施工工藝的工化及現場施工機械化的方向發展。
  6. Based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works

    結合東雷抽黃續建工程幾座大型泵站房屋面施工的實際,介紹大型屋面的排水與滲漏問題及設計、施工方面應注意的事項,供類似工程參考。
  7. Abstract : based on the analysis of practical roofage treatment of large scale workshops in donglei water pumping project, the design and construction matters on the drainage and roofage treatment are introduced, which may provide some reference for other works

    文摘:結合東雷抽黃續建工程幾座大型泵站房屋面施工的實際,介紹大型屋面的排水與滲漏問題及設計、施工方面應注意的事項,供類似工程參考。
  8. Stair - like generalized predictive control for main - steam pressure of boilers in a fire power plant

    火電鍋爐主蒸汽壓力的階梯式廣義測控
  9. Factory - made wrought steel buttwelding induction bends for transportation and distribution systems

    傳輸和分配系統用工鍛鋼對焊感應管彎頭
  10. A great amount of post tensioned pre - stressing concrete single box beam for double track ( as called the box beam hereinafter ) has been used on the line. it is of infeasibility in adoption of the traditional practice of pre - fabrication in precast factory and erection of the box beam with the track laying machine for that this type of beam is characterized by new structure, complicated workmanship, large volume and difficulty in transportation. therefore, the key and hardest problem to tackle is that what processing should be adopted to precast the box beam on site and that what kind of machinery should be used to transport and erect the box beam

    由於該型梁具有結構新、工藝復雜、體積大、運輸困難,將常規鐵路的橋梁製造橋梁、經過鐵路運梁到工地、邊鋪邊架進行橋梁製造與架設的傳統施工模式應用到該線是行不通的,必須在現場橋梁、並採用專門的運架梁設備進行橋梁架設,因此箱梁的製造、架設施工成為該線施工技術攻關的重點和難點。
  11. Here is our pipe prefabrication workshop ( steel structure fabrication shop, machine shop, boiler room, air compressor station, concrete mixing unit )

    這里是我們的管道車間(鋼結構製作、機械加工車間、鍋爐房、空氣壓縮機站、混凝土攪拌裝置) 。
  12. Applying fuzzy control theory, the prediction of coke rate based on blast temperature, blast temperature and coal injection rate is respectively discussed in the paper. actual production data were used to conduct the model calculations. the research showed that the predicted results were in good accordance with actual ones

    運用模糊控理論探討了根據風溫報焦比以及風溫、噴煤報焦比的問題,利用某實際生產數據進行模擬實驗得到了較好的報效果。
  13. Along with the constant progress of society and the incessant advancement of production, house decoration is transiting from traditional handwork in locale to the way of assembly house decoration mode, including the factory ' s preparation, mechanization of production and installation in the spot

    隨著社會的不斷進步和生產力的不斷提高,住宅裝修行業必然從傳統的現場手工作業走向工、機械化生產、現場裝配的裝配式住宅裝修發展道路。
  14. This proof following enterprise already through the authentication, and has set up a file in the dongguan 114 nets industry and commerce enterprise database, inquires the more detailed enterprise material, please dial the dongguan enterprise information desk 96060 ( artificially ) 9686810114 billion ( to be automatic ), this enterprise numbers for 48114

    茲證明東莞市中港四航局第一工程公司東江口構件已通過認證,並已在東莞114網工商企業數據庫中備案,查詢更詳細的企業資料,請撥東莞企業查詢臺96060 (人工) 9686810114 (自動) ,該企業編號為48114 。
  15. To use more factory - made components in the provision of building services installations

    在屋宇裝備工序中,增加使用工組件。
  16. 406 our piping prefabrication workshop covers a total area of 1000m2

    我們的管道加工擁有一千平方米的面積。
  17. Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns with tendons in the joints of the frames. these beams and columns are hoisted in site and the tendons are passed through the moire pipes. so prestressing force are brought to the joints of the frame. these tendons also can assume the moments at the end of the beams in ordinary condition

    壓裝配式應力混凝土框架是採用工化生產的柱和應力梁,運至現場直接吊裝,樑柱就位后,將后張應力筋穿過樑柱留孔道,對節點實施應力張拉壓。
  18. Design on the steel beam of overhead crane in precast factory for lot iv of yrdp

    預制廠房鋼吊車梁的設計
  19. A more promising strategy seems to be to procure smaller prefabricated elements from the nearest local factory, provided that specialized facilities can be demonstrated to reduce environmental impact and add economies of scale

    一個更好的策略是在最近的本地工生產更小的組件,由工提供專業化的設備,這樣的策略可以通過示範被證實可以降低對環境的影響並且還可增加經濟規模。
  20. Subassemblage and prestressed concrete frames are assembled by precast prestressed beams and columns, which are made in the factories, with tendons in the joints of the frames. so the joints and frame are monolithic and continuous, consequently, this kind of frame systems possess higher reliability and solve the problems in the process of assembling, exploring a new way for industrial production of prestressed structures

    壓裝配式應力混凝土框架是採用工化生產的柱和應力梁運至現場安裝,並對節點實施二次應力張拉,構成整體受力節點和連續受力框架,克服了裝配式節點受力可靠性差的缺陷,開辟了應力結構工業化生產的新途徑。
分享友人