預埋件 的英文怎麼說

中文拼音 [máijiàn]
預埋件 英文
built-in fitting
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ量詞(用於個體事物) piece; article; item Ⅱ名詞1. (指可以一一計算的事物) 2. (文件) letter; correspondence; paper; document
  1. Their parties abroad were less varied than before ; and at home she had a mother and sister whose constant repinings at the dulness of every thing around them threw a real gloom over their domestic circle ; and, though kitty might in time regain her natural degree of sense, since the disturbers of her brain were removed, her other sister, from whose disposition greater evil might be apprehended, was likely to be hardened in all her folly and assurance by a situation of such double danger as a watering place and a camp. upon the whole, therefore, she found what has been sometimes found before, that an event to which she had looked forward with impatient desire, did not, in taking place, bring all the satisfaction she had promised herself

    外面的宴會不象以前那樣多那樣有趣了,在家裡又是成天只聽到母親和妹妹口口聲聲怨生活沉悶,使家裡籠罩上了一層陰影至於吉蒂雖說那些鬧得她心猿意馬的人已經走了,她不久就會恢復常態可是還有那另外一個妹妹,秉性本就不好,加上現在又處身在那兵營和浴場的雙重危險的環境里,自然會更加大膽放蕩,闖出更大的禍事來,因此從大體上說來,她發覺到其實以前有一度她早就發覺到她眼巴巴望著到來的一事,等到真正到來了,總不象她期的那麼滿意。
  2. It will cover products including anchor channels for pre - casting systems, stainless steel aerial tower work platforms and scaffolding products, and is scheduled for production in october 2004

    設施可製造的產品包括槽式預埋件不銹鋼高空工作平臺及棚架產品及其他鋁金屬加工產品。
  3. District heating pipes - preinsulated bonded pipe systems for directly buried hot water networks - pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene

    區域供暖管道.直式熱水供暖網的絕熱連接的管道系統.聚氨酯絕熱層和聚乙烯外覆層的鋼管組
  4. Experimental research on the bearing capacity of the angle steel embedded part

    角鋼錨筋預埋件承載力試驗研究
  5. Beam side form shall be installed after all work inspected and accepted such as beam rebar work, cushion block laying, steel inserts installation, steel doweling and pocket molding bed, etc

    綁扎梁筋,墊保護層墊塊,安放、插筋、留孔胎模等,經檢查合格后扣梁側模。
  6. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下連續墻設計過程中的鋼筋網保護層、鋼筋網接駁、鋼筋網預埋件、墻體錨固深度、墻體接頭形式以及施工過程中鋼筋網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  7. District heating pipes - preinsulated bonded pipe systems for directly buried hot water networks - joint assembly for steel service pipes, polyurethane thermal insulation and outer casing of polyethylene

    區域供暖管道.直式熱水管網用先絕熱有包覆管層的管道系統.聚氨基甲酸乙酯熱絕緣和聚乙烯外覆層的鋼管用接頭組
  8. Preformed directly buried steam insulating pipes technical - specification for heating in city

    城鎮供熱制直蒸汽保溫管技術條
  9. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合電測元的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  10. It will cover products including anchor channels for pre - casting systems, stainless steel aerialtower work platforms and scaffolding products, and is scheduled for production in october 2004

    設施可製造的產品包括槽式預埋件、不銹鋼高空工作平臺及棚架產品及其他鋁金屬加工產品。
  11. There is a high precision anti - interference leakage detection sensor fitted in the enclosed oil chamber, and a thermosensitive element fitted in stator winding to carry out automatic protection of pump motor

    該泵密封油室內設置有高精度抗干擾漏水檢測傳感器,定子繞組內了熱敏元,對水泵電機自動保護。
  12. The bracket and vertical column of cable tray will be installed by welding or expansion bolt of the basement. the welding place treatment will be done by painting

    橋架的立柱、托臂等支架可與基礎預埋件焊接固定,也可採用膨脹螺栓固定,對于現場焊接處一定要做好防腐處理,通常由用戶現場塗刷防腐漆。
  13. Having analysed and handled the engineering accident of embedded object in suzhou zi xing paper company. 4

    3 .為蘇州紫興紙業公司分析與處理了聯合廠房預埋件事故。
  14. Having analysed and bandled the accident of embedded object bearing kinetic load in suzhou zi - xing paper company. 3

    2 .為蘇州紫興紙業公司分析與處理了聯合廠房預埋件(承受動載)事故。
  15. Check up with built - in pipe & hole & so on as per drawings during civil construction

    依據圖紙設計檢查土建的予留空洞
  16. Its one - stop top - of - the - line solutions also include specialized services in architectural curtain - wall design, high - caliber cast - in channel and curtain - wall panel - forming, and door and window fabrication

    集團一站式頂級鋁材方案,更包括建築幕墻設計槽式金屬預埋件幕墻鋁板加工成形,以至鋁制門窗。
  17. In this thesis, a series of single and double - direction - load tests are carried on the single plate framing connection between truss - steel beam and concrete wall often used in tall - building. by single - direction - load tests, the flexure capacity of the joints in use of different design is researched in particular, the effect of bolt design on the flexure capability is analysised ; based on the cyclic loading experiment, such characteristics of the anchors are analyzed -. bearing capacity. rigidity, ductility, hystersity capacity, energy dissipation and failure phenomena

    通過單向靜力試驗,研究了單剪板連接的不同設計對鋼架梁的約束能力的變化,重點討論了螺栓的設計對約束能力的影響;通過周期性反復加載試驗研究了不同設計的單剪板連接預埋件的抗震性能的不同,重點分析了結構的承載能力、剛度、延性、滯回性能、耗能能力及其破壞特徵等。
  18. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    以設計圖紙、設備安裝資料及設計修改通知單和監理通知單為依據,按規程規范的要求,以不影響工程進度為原則,由主管工程師對施工班組進行技術交底,利用經緯儀、水準儀和捲尺等測量工具放點定位進行基礎及預埋件並做好記錄。
  19. For large tent or using long - term tent, concrete foundation should be first constructed with pre - embedded plate, then poles of tent should be welded on the pre - embedded plate

    對于使用時間比較長的大型蓬房,需做基礎預埋件,篷房結構和預埋件連接。
  20. It has been representing the promising development direction of composites manufacturing techniques with high quality and low cost due to its outstanding operation for large structure or function parts with complex geometry in one step

    該技術可實現一步浸滲成型帶有夾芯、加筋、預埋件的大型結構功能,是高性能低成本先進復合材料制備技術的主要發展方向。
分享友人