預埋工程 的英文怎麼說

中文拼音 [máigōngchéng]
預埋工程 英文
carcase work
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站實際資料,對m方案和n方案溫度場進行了施期和運行期全過模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值線圖以及施期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值線圖,提供了施期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了冷卻水管的效果和可行性以及冷卻水管的區域。
  2. Through analyzing and researching the physiognomy map of hebei plain > the fourthly epoch map of hebei plain > engineering geology map of hebei plain, hydrogeology map of hebei plain. lithology map of the fourthly epoch and ancient watercourse map of hebei plain, achieving the fixation factors that control the arising and development of the ground fissures, such as, the earth ' s crust tress, the fourthly epoch lithology, the chancing of ground water table, active faults and ancient watercourse, and also making sure the exponents of each factors ; researching random factors, such as, precipitation. and agriculture irrigation, and making sure the exponents of each factors too

    找出了地裂縫發展的周期,對地裂縫的發展趨勢進行了測;圈定了地裂縫發生敏感點。在分析河北平原第四紀地質圖、地貌圖、地質圖、水文地質圖、古河道圖基礎上,找出了河北平原地裂縫致災固定因子如:地殼應力、第四紀巖性、地下水位深降幅、活斷層和古河道,並確定劃分各因子指數;研究地裂縫隨機因子,如大氣降水和農業灌溉,並劃出各因子指數。
  3. The modes selection of directly buried installation for hot - water heat - supply pipeline, the design and construction of directly buried installation with and without expansion joint and the quality assurance of prefabricated directly buried insulating pipe are discussed with a practical engineering example

    摘要結合實例,探討了熱水供熱管道直敷設方式的選擇,有補償和無補償直敷設方式的設計與施制直保溫管質量的保證。
  4. This paper approaches reinforcement fabric cover, reinforcement fabric joint, reinforcement fabric embedded inserts, wall anchorage depth and wall joint form during the design of underground continuous walls, meanwhile, some problems affecting wall quality in the various sectors during construction are also discussed, including reinforcement fabric installation, groove bottom hole cleaning and quality testing equipment

    本文對地下連續墻設計過中的鋼筋網保護層、鋼筋網接駁、鋼筋網件、墻體錨固深度、墻體接頭形式以及施中鋼筋網安裝、槽底清孔、質量檢測設備等各個環節中影響墻體質量的一些問題進行了探討。
  5. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方及應力-應變轉換原理,結合電測元件的樁身率定,對三組不同種類、不同施藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該合理設計樁型提供了可靠的設計參數,為確定科學的施藝提供了有力的依據。
  6. Abstract : based on an incident of a worker buried live, interpret the premise of a good performance in safety and the necessary procedures we should take on to prevent incident

    文摘:根據某地一名人因開挖作業而被活致死這一事故,論述了作好安全作防止事故的前提條件和必要的防、檢查、控制、措施及序。
  7. Specification for structural design of buried prestressed concrete pipeline of water supply and sewerage engineering

    給水排水地管芯纏絲應力混凝土管和應力鋼筒混凝土管管道結構設計規
  8. In the last part of the thesis the key points are given with the detailed analysis and summarizing for dynamic control technology in subgrade construction, namely the calculations for the settlement in subgrade construction, including the calculation methods for the dynamic control in pre - compacting period, the burying of settlement plates, and the final settlement of the subgrade

    本文最後重點對路基施動態控制技術即路基施中沉降量計算進行了詳細分析、總結,包括壓期動態控制、沉降板設、地基最終沉降計算方法等。
  9. This research findings will set a fir m theoretical foundation for its widely application

    研究成果將為大直徑鉆應力砼空心樁在中的推廣應用奠定堅實的理論基礎。
  10. Abstract : construction method by steps is used for pre - embedded parts of steel structure engineering foundation with easy construction, high accuracy and good quality, and the economic benefit is remarkable

    文摘:在鋼結構基礎螺桿的施中,採用一次就位分步施法,施簡單、精度高、質量好,經濟效益顯著。
  11. Before embedding of the foundation and embedment parts, technical clarificaiton will be don by the engineer in charge and the working group on the basis of design drawing 、 installation documentation 、 design amendment notification and supervision nofification 、 the principle of no impeded the progress schedule 、 the requirement of the relevant regulations and specification, setting out the embedment locaiton applied by the theodolite 、 water level and tape after that carrying on the embedment process and the record will be well kept

    以設計圖紙、設備安裝資料及設計修改通知單和監理通知單為依據,按規規范的要求,以不影響進度為原則,由主管師對施班組進行技術交底,利用經緯儀、水準儀和捲尺等測量具放點定位進行基礎及並做好記錄。
  12. This will provide concrete reference for parameters values which mainly depend on the experiences. according to the selected bp model and related water table depth records and other information, the annual and monthly mean water table depth trends in the future planning year ( 2005, 2010 ) are forecasted on condition that water saving reconstruction projects are accomplished in the larger scale experimental zone ( jiefangzha ) of hetao irrigation district

    在此基礎上根據黃河河套灌區多年的水文、氣象和地下水信息,對一個大尺度區域的多年年均地下水深變化進行了bp模型的模擬與檢驗,測了灌區節水實施后未來規劃水平年( 2005 , 2010年)年平均、月平均地下水位下降的動態。
  13. Calculating adopts the way of finite unit spot parameter by using the character of dispersion. thus, it can get the similar answer of stress, stress strain and displacement. supervising uses strainmeters, non - stressmeters and tiltmeters, which are buried in the concrete wall to supervise the stress, tress strain, displacement during period of working and makes the forecast

    計算採用有限元法將混凝土防滲墻利用離散化變為有限單元節點參數,從而得到應力、應變、位移的近似解;監測採用應變計、無應力計及測斜儀現場設在砼墻體內對混凝土防滲墻在施期及運行過中進行監測其應力、應變、位移,從而作出報。
  14. Specification for structural design of buried premade concrete round pipeline of water supply and sewerage engineering

    給水排水制混凝土圓形管管道結構設計規
  15. Abstract : connected with the practical project, the paper tries to discussthe problem of anchor bolt setting in large - scale power equipment ' s foundation such as fan and electromotor used in removing dust project, analyzes the feasibility of a new grouting method in pre - setting hole and puts forward its popularization value in other projects

    文摘:結合實際,討論了在除塵中風機、電機等大型動力設備基礎地腳螺栓設的問題,分析了一種新型的留孔灌漿方法的可行性,並提出了其在其它中的推廣價值。
分享友人