預埋管線工程 的英文怎麼說

中文拼音 [máiguǎnxiàngōngchéng]
預埋管線工程 英文
carcase work
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 管線 : line pipe; lead-out管線安裝 pipelining; 管線泵 in-line pump; 管線測量 pipeline survey; 管線敷設 pipelining
  1. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口水電站實際資料,對m方案和n方案溫度場進行了施期和運行期全過模擬計算分析,給出了拱冠梁剖面和壩體中心縱剖面準穩定溫度場等值圖以及施期、運行期拱冠梁剖面和壩體中心縱剖面非穩定溫度場等值圖,提供了施期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了冷卻水的效果和可行性以及冷卻水的區域。
分享友人