預報估計 的英文怎麼說

中文拼音 [bào]
預報估計 英文
forecast estimation
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (告知; 報告) report; declare; announce 2 (回答) reply; respond; reciprocate 3 (答謝)...
  • : 估構詞成分。
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 預報 : [訊] forecast; forecasting; prediction
  • 估計 : estimate; evaluate; take stock of; size up; calculate; appraise; reckon; estimation; forecast
  1. Based on perspective model, it was proposed that drawing camera inner parameters with physics method ; in image processing, especially the particularity of robot object localization and tracking, it was proposed that several effective methods of image smoothing and sharpening, edge detection, boundary tracking ; at the same time, in order to complete object recognition, we introduced the methods of drawing object character parameters ; in object image matching, two kinds of effective object matching arithmetic was proposed ; based on the principle of object 3d information restoration, we proposed two kinds of arithmetic of 3d coordinate restoration of object feature points, and completed object movement parameters estimate and object tracking and prediction, and presented experimental result

    以透視成像模型為基礎,提出了用物理方法來提取攝像機內部參數;從圖像處理角度出發,針對機器人目標定位與跟蹤的特殊性,提出了幾種行之有效的圖像平滑、銳化、邊緣提取以及邊界跟蹤的方法;同時,為了完成目標的識別,介紹了目標特徵參數的提取方法;在目標圖像匹配上,提出了兩種快速有效的目標匹配演算法;基於目標深度信息恢復原理,提出兩種目標特徵點三維坐標恢復的方法,同時完成了目標運動參數和目標的跟蹤與,並最後給出了實驗結果。
  2. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃河河口口門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從河口泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在口門處,影響泥沙沉淤的因素主要集中在潮汐頂托、口門逐漸加寬、河口門分汊、鹽水造成絮凝等,本告主要對口門加寬,口門西妥理工大學工程碩士專業學位論文分漢對河道淤積的影響進行了定量分析: (一扣根據實測資料首次建立了河贖流路泥沙沉積分配的回歸算式,據此可以算河口不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了河口三角洲岸線動態平衡的概念,並建立了黃河河口來沙量與造陸面積的相關關系,得出了當河口多年平均來沙量維持在3 . 45億t時其河口三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提出了河口泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  3. In a confidential study leaked to the french press, the capital ' s transport authority ratp estimated an average 61 suicide attempts a year cost it in the region of ? 9m ? 6. 2m in emergency interventions and network disruption, plus the severe but often unquantifiable trauma suffered by staff who witness an attempt. christmas and new year are peak periods, with three times the monthly norm, said the report, extracts of which were published in the newspaper le parisien

    據衛12月30日道,據法國媒體道,在有關部門的一份機密研究告中,負責管理巴黎運輸系統的ratp機構,每年在該市地鐵內平均發生61起自殺事件,為此而採取的緊急干措施以及由此帶來的地鐵運輸中斷所造成的損失高達900萬歐元620萬美元,而目睹這些慘劇的車站工作人員往往會遭受極其嚴重但又通常是難以量化的精神創傷。
  4. ( 1 ) the posterior distribution of the coefficient matrix, the precision matrix and covariance matrix, and their bayesian estimation under the matrix normal - wishart conjugate prior distribution. ( 2 ) the deduction of the predictive distribution, proved to be matrix t distribution. ( 3 ) the designs of bayesian multivariate mean value control charts in terms of the relationship between the multivariate wishart distribution and x2 distribution, the bayesian process capability index and its confidence lower limi

    通過多方程模型系統的統結構,證明了矩陣正態? wishart先驗分佈是模型參數( , )的共軛先驗分佈,研究了該先驗分佈下模型系數矩陣、精度陣和協方差陣的后驗分佈及其貝葉斯,對模型密度函數進行了嚴格的數學推導,並將其應用於多元質量控制領域,構造了貝葉斯均值向量聯合控制圖;結合wishart分佈與x ~ 2分佈之間的關系,設與推斷了貝葉斯多指標過程能力指數及其貝葉斯置信下限。
  5. With this understanding, this paper chooses the longitudinal strength of hull girder as the disabled mode, by the calculation of fpso, predicts the ultimate strength and effective lifetime of the hull. expected results of examples are obtained, which provide the analysis data for the further risk assessment

    在此前提下,本文選擇了船體梁縱向強度失效模式,通過fpso實船算,分析消化了理想單元法程序軟體,了船舶極限強度和安全有效壽命期,並用一階二次矩方法對完整受損船體的結構安全性進行了可靠性的評,取得了想的結果,為進一步實施綜合安全評提供了分析數據。
  6. In this paper, we develop a single - product and single - period model ( a newsboy model ) with bayesian approach to study how the decision - maker in a seasonal goods production system to determine the production quantity and budget invested in demand forecasting

    本文經由模型推導,探討使用貝氏法之單期季節性商品生?系統(童問題)應如何訂定生?劃及需求測投資算。
  7. Whereafter, based on the analysis on the flood influence for traffic lines, the research is centered on the following parts : firstly, the destroying modes, reasons and mechanism of flooded lines are discussed, and the frameworks and countermeasures of preventing and controlling hazards system are put forward ; secondly, the ways of region forecasting for the landslide are analyzed and the automation of landslide forecast for certain site through visual programming is realized. furthermore, the function of dynamic segmentation in arc view is made use of to realize the forecast result ' s visualization ; thirdly, the reasons and patterns of roadbed subsidence are discussed and the methods of forecasting subsidence based on the gm ( 1, 1 ) model are put forward. then the applications of the arcview software and its extended module on the study of roadbed subsidence are debates upon ; fourthly, an analysis on the sources of flood for traffic lines, which situate in the reservoir coverage area, is given

    接著,論文探討了山區交通線路災害的特點、分類、時間和空間分佈規律以及災害的防治原則和對策等;然後,以洪水災害對交通線路的毀壞為主線,重點研究和分析了以下幾個問題:第一,探討了洪水對交通線路的破壞方式,水毀原因以及水毀機理,並提出了交通線路水毀防禦系統框架和對策;第二,分析了雨季邊坡塌方災害的區段測方法;通過可視化編程,編制了雨季邊坡塌方災害的工點程序,並結合arcview實現了測結果的可視化;第三,對路基沉陷原因和模式進行了分析,並提出利用gm ( 1 , 1 )模型對路基沉陷區進行分析和測,最後論述了arcview軟體及其擴展模塊在沉陷區研究分析中的應用;第四,對汛期庫區線路災害的原因進行了分析,並探討了利用數量化理論對路基防護工程抗洪能力進行測的意義;第五,提出從風險的角度對交通線路的防災減災進行管理,對風險的相關問題進行了論述,並探討了交通線路水害危險區段的劃分問題。
  8. The contractor has had to carry out extra work partly because of unforeseen ground conditions and partly because of the miscalculation of rock quantities by ove arup, and is entitled under the contract to be paid for the extra work

    承建商須進行額外工作,一方面是由於有不可見的地質情況,另一方面則由於奧雅納工程顧問有限公司錯誤石層數量,因此承建商有權根據合約獲得額外工作的酬。
  9. The main contents of the course design include : estimating the prospect of a deposit ; analyze the variability of the ore bodies, selecting the exploration area and means ; arrangement of exploration engineering ; methods of sampling, compiling and reserve calculation ; budget of exploration investment ; calculation of total profit after mining and economic appraisal ; drawing necessary figures and tables and compilation of the exploration report

    礦床勘探課程設的主要內容是礦床的遠景;分析礦體的變化性;選擇勘探范圍,勘探手段,勘探工程布置形式;確定取樣,編錄和儲量算方法;進行勘探投資算,算開采后的總利潤,並進行經濟評價;繪出必要的圖表,並寫出文字
  10. Forecasts, estimates statistical returns

    -測、及統
  11. The basic software consists of topology analysis, on - line load flow computation, state estimator, security analysis, dispatchers training simulator, short circuit current computation, and voltage / reactive power optimize, etc. the derived softwares consist of load control, capacitor optimizer configuration, transformer and feeder load distribution, impedance computation of generator, etc. network analysis software is powerful dispatch tool, though witch the current state of the power system can be realize, then improve the security and economic potential

    Dms網路分析的基本軟體有:網路結線分析、潮流算、狀態、負荷、短路電流算、電壓無功優化等。派生軟體有:負荷控制、電容器優化配置、變壓器與饋線負荷分配、電源阻抗算等。網路分析軟體是有力的調度工具,通過它可以了解和掌握當前的運行狀態,從而挖掘安全和經濟方面的巨大潛力。
  12. The paper consists of several parts as following : firstly, we probe an estimating method with the time - change parameters to overcome the problem with greater errors that us think a dynamical process with the time - change parameters as a static process with the no time - change parameters and forecast the time - change parameters system by the model with the no time - change parameters

    本文主要進行了以下幾方面的工作: 1探討了一種動態系統的時變參數的方法,克服了以往把一個時變參數的動態過程當作了非時變參數的靜態過程,而用非時變參數模型時變參數系統的狀態時帶來的較大誤差問題。
  13. Then, sage adaptive filtering usually used in kinematic gps navigation and positioning and its shorcoming are analyzed. the weights of measurement residuals and state correction residuals are modified according to the self - correlation property of colored noise and robust estimation. the procedure of weighte d prediction of covariace matrix not only resists the influence of outlying kinematic model errors, but also controls the effects of measurement outliers

    然後,分析了目前常用於有色噪聲處理的sage自適應濾波及其在動態gps導航定位應用中的缺陷,並依據有色噪聲的自相關特性和抗差調整觀測殘差和狀態改正數的權比,再通過加權控制殘留在其中的異常對協方差矩陣自適應的影響。
  14. As an essential component of dms, the system will supplement itself in the following aspect, short circuit current calculation, theoretical losing, voltage / reactive power optimize, state estimation, load forecast, etc

    本軟體平臺是dms的重要組成部分,下一步將加入短路電流算、理論線損算、電壓無功優化、狀態、負荷等功能。
  15. So - called the interest rate term structure in the paper, is the different term structural analysis and estimation in government debt bond market. the influent factor of the interest term include : the capital long period benefit, the short - term interest rate, the expected inflation, macro variable ability of adaption

    所謂利率期限下,就是指對不同時點的整個國債市場利率期限結構的分析和。期限結構的因素有資本回率、短期利率的影響、長短期利差、通貨膨脹期、宏觀調控能力等。
  16. Adjusted results for the fourth quarter of 2003 exclude a pre - tax gain of us $ 28 million on the redemption of long - term debt and a credit to income tax expense of us $ 39 million. our previous estimate of gaap earnings for the 2004 fourth quarter of us $ 0. 84 to us $ 0. 87 per diluted share included higher net tax credits than were realized

    我們早前,按照美國公認會原則( gaap )呈的盈利算,二零零四年第四季攤薄后每股盈利介乎零點八四至零點八七,其中包括較我們期為高的稅款抵免凈額。
  17. They now try to anticipate where crimes will occur based on gang intelligence

    他們現在正根據黑幫情犯罪在什麼地方會發生。
  18. Report on significant deviations between accepted tender prices and estimated provisions in the approved project estimates for capital works contracts awarded in the third quarter of 2006

    所接受的投標價與工程劃核準算費內款額之間出現重大差額的告2006年第三季批出的基本工程合約
  19. Report on significant deviations between accepted tender prices and estimated provisions in the approved project estimates for capital works contracts awarded in the first quarter of 2006

    所接受的投標價與工程劃核準算費內款額之間出現重大差額的告2006年第一季批出的基本工程合約
  20. Report on significant deviations between accepted tender prices and estimated provisions in the approved project estimates for capital works contracts awarded in the third quarter of 2005

    所接受的投標價與工程劃核準算費內款額之間出現重大差額的告2005年第三季批出的基本工程合約
分享友人