預定厚度 的英文怎麼說

中文拼音 [dìnghòu]
預定厚度 英文
final thickness
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
  • : 度動詞[書面語] (推測; 估計) surmise; estimate
  • 預定 : 1. (預先規定或約定) fix in advance; predetermine; schedule 2. [計算機] reserve
  1. We prospectively investigated whether measurements of carotid intima - media thickness in the presence or absence of albuminuria in patients with stable chest pain syndromes can be used as a noninvasive test algorithm for prediction of significant coronary artery disease

    前瞻性研究穩性胸痛綜合征患者在有/無蛋白尿時的頸動脈內膜中層測量能否作為測重要冠狀動脈疾病的一種無創性檢查方法。
  2. Research area is characteristic of heterosphere obviously, which mainly manifests that distribution, thichness and extent of delelopping of sand body is not symmetrical. difference of transverse permeating rate is more 10 times than longitudinal permeating rate. the research indicates : the principle productive formation at this area is the member of h8x, h8s on the lower hezi formation that are good reservoir

    研究區儲層非均質性明顯,主要表現為砂體分佈不均勻、不均,發育程不一,滲透率縱橫向差異均在10倍以上等;儲層發育較好的層段是山西組山1段,是本區的主要產層;神經網路技術對于儲層物性參數的測是一種比較有效的方法;儲層綜合評價指數對于儲層的評價具有一的理論和現實意義。
  3. In the paper, the finite element simulation software dynafrom is applied to analyze the affect of different blank holder during the forming process of laminose stepped tubular part, predict the possible defects such as wrinkle and break, obtain the rational style of blank holder avoiding the occur of defects and determine the rational configuration of die. the forming affect of thin - wall shallow stepped tubular part is analyzed when using different lubricate condition ( friction coefficient ). by this method, the relationship between friction coefficient and drawing depth of laminose stepped tubular part is obtained

    本文利用有限元模擬軟體dynafrom分析了不同類型的壓邊圈對薄壁階梯筒形件成形過程的影響規律,測了採用不同類型壓邊圈時可能出現的成形缺陷如起皺和拉裂,獲得了防止缺陷產生的合理壓邊圈形式,確了合理的模具結構形式;分析了不同的潤滑條件(摩擦系數)對薄板階梯筒形件成形的影響,獲得摩擦系數與薄板階梯筒形件的拉深深的關系;分析了階梯筒形件成形過程中的不同階段的應力應變分佈、毛坯材料變化情況,並獲得了階梯階梯筒形件能一次拉深成形的條件。
  4. With the material dynamic constitutive equation including damage and the effect of stain rate the predictable formula about ballistic limit velocity of fiber composite target. secondly based on the damage feature about ceramic / fiber composite target caused by impact load, analysis model about defense performance of ceramic / composite material target is formed and the predictable formula about ballistic limit velocity is also given. lastly using the reflection and projectile theory of stress wave the paper discusses the design of ceramic / composite material target, optimizes the design of double layer ceramic / composite targets, gains optimal coefficient under certain area density and discusses the variety relationship of area density and thickness with optimal coefficient u nder some ballistic limit velocity 3

    首先,分析了纖維類正交鋪層復合靶板在沖擊載荷作用下的損傷破壞機理,結合包含損傷和應變率效應的材料動態本構方程,建立了纖維復合材料板彈道極限速測公式;其次,根據陶瓷/纖維材料復合靶板在沖擊載荷下的破壞特點,建立了陶瓷/復合材料靶板抗彈性能分析模型,給出了彈道極限速測公式;最後,利用應力波反射和透射理論討論了陶瓷/復合材料靶板的設計問題,對雙層陶瓷復合靶板的優化設計進行了分析,給出了在一面密下的最佳優化系數,討論了一彈道極限速下的面密隨優化系數的變化關系。
  5. Pre - impregnated glass fabrics. determination of the thickness of a layer of pre - impregnated product after pressing and curing

    浸玻璃織物.加壓和焙燒后浸墊的測
  6. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層抬高分級充水壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層抬高分級充水壓法的適用性研究,其中包括砂墊層、地基沉降與固結、地基穩性、降水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎沉降速率與不均勻沉降程、各分級充水加載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強增長等方面的實測與數據分析。
  7. 4. combined with the design of the three gorges prestressed concrete penstock with steel liner in the three gorges power. station, the consistence among the results of theory calculating, the analysis of plane finite element and three dimensional finite element is proved, the concrete stress distributions of the prestressed concrete penstock are analyzed with different steel liner thicknesses, different crack resistances, different concrete thicknesses and different initial radial gaps between steel liner and concrete. the feasibility of the design method of prestressed concrete penstock with steel liner is proved

    結合三峽電站鋼襯應力混凝土聯合受力壓力管道的設計方案選擇及論證分析,對比分析了鋼襯應力混凝土壓力管道理論計算、平面有限元和管壩整體三維有限元分析結果的一致性,確了管道結構在不同鋼襯、不同抗裂要求、不同外包混凝土及不同鋼襯與管壁混凝土間初始徑向間隙等因素影響下的內力分佈規律,驗證了鋼襯應力混凝土壓力管道的設計方法。
  8. Presently most of the theoretical method to predict the propeller - induced hull pressure fluctuation is based on the calculation method in which the pressure is induced by pulsating source in infinite flow. the calculation method is adopted and the corresponded computer program is complied. the propeller - induced hull pressure fluctuation due to blade thickness, blade load, cavity thickness and the change of the cavity volume can be analyzed respectively in the computer program

    目前,螺旋槳誘導的船體表面脈動壓力的理論報方法,大多是以無限流場中點脈動源誘導的周圍流場的脈動壓力的計算方法為基礎的,本文採用該方法編制了計算程序,可以分別考慮槳葉、槳葉負荷、槳葉上空泡及其體積變化在船體表面指位置上產生的脈動壓力。
  9. The jinjiang landslide, which is away 5km from the left bank of upper stream of baihetan hydropower station in the jinsha river, with about 1. 58 108m3 of accumulation and 56m of average thickness, is very huge ; so that, evaluating the stability of landslide and forecasting its danger are also particularly important to assess the possibility of the project

    金江滑坡距擬建的金沙江白鶴灘巨型水電站左岸上游僅5km ,其堆積體積近1 . 58 10 ~ 8m ~ 3 、平均達56m ,因此,弄清其穩性狀況及合理地測其危害對評價工程建設的適宜性顯得尤其重要。
  10. By comparing the numerical results of water infiltration with air and without air, it is shown that the method in this paper is more effective for solving problems of water infiltration in unsaturated soil. in this paper the forming process of oil - bearing basin is the main research object and the mathematic model of geology is built, in order to simulate the dynamic forming process of stratums especially oil - bearing stratum in geology history in the time and space concept, further to investigate the history of petroleum forming, transmitting, accumulating and predict the distributing rule and scope of petroleum, and offer an rapid, quantitative, exact, general choice for the researcher of petroleum geology. with denudation, poor - compactness and sedimentation hiatus, the stratum relations of sedimentation section is judged, and the ancient thickness and pressure of stratum layer are recovered by the inversion method of back stripping. the numerical simulation algorithm of recovery of geological history is also given

    為了利用現代化的計算技術再現含油氣盆地的地史演化發育過程,以便進一步量化研究油氣的生成、運移和聚集的歷史以及測油氣分佈規律、分佈范圍,為石油地質學家提供一個快速、準確、量、綜合的研究手段,本文就含油氣盆地的地史演化發育過程為主要研究對象,建立了數學地質模型,運用優化理論與演算法,在考慮了剝蝕、欠壓實、沉積間斷等地質現象的情況下,採用回剝反演法,應用鉆井、測井、地震等方法獲得的地層物性資料,判別沉積剖面中地層的接觸關系,恢復地層的古、古壓力,構造了地史恢復的數值模擬方法。
  11. Prepared technical parameters were optimized by l9 ( 34 ) experiment analysis. a unique method for cleaning and drying of substrate - cleaning used by scour, drying used by infrared light was fished out by large numbers of experiment. chemical mechnism of zno thin film prepared by sol - gel technique was discussed by dta for the first time. by the measurements of sem, xrd and uvs, the thin film was analysed. the result proved that the thin film with strongly preferred orientation of c - axis perpendicular to the substrate surface which surface was homogenous, dense and crackfree was the crystalline phase of hexagonal wurtzite. the thin film was composed of plentiful asteroidal crystal which crystal dimension approximately 10 30nm. the average transmittance of thin film in visible region was above 90 %. the results of measurements else also proved that the thickness of single dip - coating was 75 240nm, this films resistivity was found to be 3. 105 102 3. 96 105 ? cm. the thickness and resistivity of thin film influenced by dope - content, withdrawal speed, pre - heat - treatment, anealing were reseached respectively

    利用xrd 、 sem以及uvs光譜儀等分析方法對薄膜進行了研究,結果顯示,所制備的薄膜為六方纖鋅礦型結構,具有高c軸擇優取向性;表面均勻、緻密,薄膜材料由許多星狀晶粒組成,晶粒尺寸大約為10 - 30nm左右;薄膜可見光透過率平均可達90 % ;對薄膜以及電學性能進行了測后發現:單次鍍膜約為75 - 240nm , al ~ ( 3 + )離子摻雜型氧化鋅薄膜的電阻率在3 . 015 102 - 3 . 96 103 ? cm范圍內;分別研究了摻雜濃、提拉速燒溫、退火溫等工藝參數對薄膜和電阻率的影響。
  12. By means of measuring the difference in physical characteristic of rock body we could predict the geological condition that the gas power composes in, by means of measuring the position in three dimensional space we could determines the security thickness of the rock body with which the mining is protected, and so on

    通過測量巖體物性差異測瓦斯動力賦存的地質條件,通過測物性差異體的三維空間位置可確采礦作業的安全巖體隔離,等等。
  13. A strong financial support has enabled factory in zhang jia gang sheng meei machine co., ltd. an ideal working environment, equipped with advanced production facilities, latest technology, conveying belt and cnc control system to ensure the top quality of hand - driven flat knitting machine. the parts and standard accessories are either manufactured locally or imported overseas. the annual production capacity reaches beyond 100, 000 sets in volume, and more than us 30, 000, 000 in value. consequently, labor force increases to 400 - 600 people. the labors in sheng meei enjoy a great extent of sense of ownership to the company

    本公司環境優雅舒適,有雄的資本實力,一系列人性化合理化健全化科學化的管理理念和管理制,且有世界一流的全自動化電腦控制設備,裝配材料國內無法供應者,均原裝進口,而生產出具有世界一流水準的手搖編織機,年產量逾十四萬臺,年創產值逾四千萬美元以上,年創匯可達數千萬美元,員工人數近千人。
  14. The principle of artifical freeze sinking and its advantages in engineering application are introduced ; and combining with field cases, a definite introduction is made on the computational method of freeze walls in mine construction ; moreover, how to predict the thickness of freeze walls by using computer simulation is briefly introduced

    摘要介紹了人工凍結法的原理及其工程應用中的優點,並結合工程實例對礦井施工中凍結壁的計算方法做了一的介紹,並簡略介紹如何來用計算機模擬來測凍結壁的
  15. Confirming least rock pillar thickness in cross - cut coal uncovering

    石門揭煤最小留巖柱的確
  16. If the coating is of a great enough thickness, according to gove, it would make the fabric sample seem younger than it should be to the radiocarbon method

    依照哈里所說: 「如果覆蓋物有足夠的,那麼放射性碳測法會得出比期年代要晚的結果。 」
  17. Through using microfacies analysis and heavy mineral, the source direction is determined. through logging facies and sand body contour, the depositional system is determined. through using wave - classification, stratimagic facies analysis, the reservoir distribution is predicted in the unknown fields

    相分析方法技術解決了儲層的類型及其宏觀展布問題,在本文中,系統運用了沉積微相研究方法、輕重礦物等確物源方向、運用測井相、砂體圖等方法確宏觀沉積體系,運用波形分類、 stratimagic相分析技術測未知區儲層的宏觀展布。
分享友人