預定重量 的英文怎麼說
中文拼音 [yùdìngzhòngliáng]
預定重量
英文
weight allowance- 預 : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
- 定 : Ⅰ形容詞1 (平靜; 穩定) calm; stable 2 (已經確定的; 不改變的) fixed; settled; established Ⅱ動詞...
- 重 : 重Ⅰ名詞(重量; 分量) weight Ⅱ動詞(重視) lay [place put] stress on; place value upon; attach im...
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 預定 : 1. (預先規定或約定) fix in advance; predetermine; schedule 2. [計算機] reserve
- 重量 : weight; scale; heft
-
We prospectively investigated whether measurements of carotid intima - media thickness in the presence or absence of albuminuria in patients with stable chest pain syndromes can be used as a noninvasive test algorithm for prediction of significant coronary artery disease
前瞻性研究穩定性胸痛綜合征患者在有/無蛋白尿時的頸動脈內膜中層厚度測量能否作為預測重要冠狀動脈疾病的一種無創性檢查方法。Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit
電力負荷預測是供電部門的重要工作之一,準確的負荷預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。At the same time, we colligated general math models and solving methods of reliability which are on using now. all of the models and methods have been compared and analysed
結構可靠性設計是固體火箭發動機研究工作中的重要內容。採用可靠性設計方法,可以確保發動機實現預定的質量指標。Finally, we suggest we should observe the horizontal and vertical deformation and water press in soil in construction, in order to avoid the huge accident and ensure the quality of construction. through the practice of binhai road in shenzhen, the studies result was further confirmed
最後本文提出,在濱海軟土路基施工中,對軟土地基的水平、豎向變形以及土中孔隙水壓力必須進行監控以保證軟土路基施工的質量和預防重大事故的發生,並強調以現場原位試驗來確定軟土工程力學性質,將更符合工程實際。In the light of all kinds of structural faces and their assembles along tunnel, the place and growth depth of instable cuneiform body in tunnel wall rock could be predicted, then its volume and weight of instable cuneiform body are estimated based on the equator plane projecting method and the solid body ratio geometry method, which offers reliable geologic data for designing corresponding supporting measure
摘要利用赤平投影法和實體比例幾何法分析隧洞圍巖穩定性,根據隧洞沿線所遇結構面相互組合形式,預測隧洞圍巖不穩定楔形體的位置及其發育深度,從而估算不穩定楔形巖塊的體積和重量,為設計相應的支護措施提供可靠的地質依據。In this paper, we will more deeply research on the base of the works, the first part, we give the summarize for the condition and the significance. the second part, we give the preparation knowledge to the whole paper ; the third part, we research the lower and upper bound of the generalized hamming weights for the linear codes ; include d ( r, n, k ) bound, the finite sum representation of the lower and upper bound function of generalized hamming weights for linear codes, generalized griesmer bounds ; the 4 - th part, research the definition, the property of the r - th generalized weights for the non - linear codes and non - linear constant codes, and give the expression of the generalized weight of binary ( n, m, d ) non - linear codes ; the 5 - th part, research the weight hierarchy of linear codes and non - linear codes, for example, necessary condition and sufficient condition, the 6 - th part, we research the expression of the r - th generalized hamming weights of reseaval classes codes
本文在已有的基礎之上作了進一步的探討,第一章綜述了廣義hamming重量的現狀和意義;第二章給出了全文的預備知識;第三章研究了線性碼的廣義hamming重量的一些上下界;包括d ( r , n , k )界,上下限函數有限和表達式,廣義griesmer界;第四章討論了非線性碼及非線性等重碼的廣義hamming重量的定義、性質,給出了2元( n , m , d )非線性碼的第r廣義hamming重量的表達式;第五章研究了線性碼、非線性碼的重量譜系;第六章給出了幾類碼的廣義hamming重量的表達式,這些碼包括直和碼( directsumcodes ) 、笛卡爾積碼( cartesianproductcodes ) 、張量積碼( tensorproductcodes ) 、延長hamming碼。The halt is obtained by the displacement of the horse ' s weight to the hindquarters by a properly increased action of the seat and legs of the rider, driving the horse towards a softly closed hand, causing an almost instantaneous but not abrupt halt at a previously fixed place
立定是靠騎手適度加強騎坐和腳的操作,使馬體重量移向後軀,驅使馬朝向騎手柔軟封閉的手上,因而在幾乎瞬間但又不突然的在預定的位置上停穩。Concrete filled steel tube ( cfst ) arch bridge is a new type of bridge which is widely applied in china recently, and it is a relatively ideal structural form for long span arch bridge. with the background of the practice of liantuo bridge, in the view of point of feasible in technology and reasonable in economy, the key techniques and difficulties in the construction of cfst arch bridge are analyzed and discussed in the thesis. the disadvantages in the current design and construction and the improvement method are also indicated
本文以蓮沱特大橋工程實踐為背景,以主拱施工研究為主線,對鋼管混凝土拱橋重難點施工工藝,從技術上可行、經濟上合理的角度出發,詳細的進行了分析闡述,並指出了設計施工中存在的不足和今後需改進的方向;通過對鋼管混凝土拱橋施工過程中內力的計算,確定了拱肋施工最不利荷載工況下加載重量、壓重順序和張拉臨時預應力束等一系列施工措施,並將計算結果與現場監測觀測數據進行了比較分析,為今後進一步研究這類結構提供了參考。In this article, an equivalent definition of reconstruct function is drew in the state space reconstruct by time delay chaotic time series, that lead the prediction more conveniently. then introduce a weighted distance to depict neighbour points of prediction which insured the similarity of the neighbour points
本文在時間序列坐標延遲后重構的相間中,作出重構函數的等價定義,提高了預測的可操作性;並在此基礎上,引入了加權距離來刻畫預測向量的鄰近點,保證了鄰近點的相似性。The conclusions elicited by so many studies at home and abroad indicated that the financial data and financial index can be used to predict the financial crisis or bankruptcy risk of an enterprise, and in case of the methods in the field of financial risk prediction has inclined to be stability, and no important breakthrough in recent years
國內外許多研究得出的結論已經表明,財務數據和財務指標可用於預測企業的財務危機或破產風險。在財務危機預測領域,就研究方法而言,已經趨于穩定,近幾年來始終沒有重大的突破,相關的研究只是從技術細節上不斷的完備,目前仍然存在著一些問題,如:預測變量的選擇、多重共線性等問題,始終沒有得到有效的解決。5 mast can be fixed on staging immediately without drill frame with auxiliary parts horizontal axle and buckles, which makes it possible for greatly reducing rig weight and fast moving
5鉆機桅桿上預留固定安裝孔,可以無需機架直接通過輔件橫軸及扣件安裝在腳手架上,使重量大大減輕,移機快捷方便。The technological risk is shown as selecting type mistake of the software and the system supplier ' s choice risk mainly ; transform risk display and means the risk appeared in order to change and manage various kinds of required management ideas of the means, management way, and in order to meet the needs of erp system, revitalize risks of organizing brought to institutional framework and business procedure ; control project risk display to implement cycle lengthen, implement cost increase, implementation quality and implement result up to goal preconcerted ; human resources risk show as lack effective consultant of implementation, lack the risk with staff of the implementing ability mainly
技術風險主要表現為軟體選型錯誤以及系統供應商的選擇風險;變革風險主要表現指為改變管理手段、管理方式所要求的各種管理觀念轉變所出現的風險,以及為了適應erp系統的需要,對組織結構以及業務流程進行重新調整所帶來組織風險;項目監控風險主要表現在對實施周期延長、實施成本的增加、實施質量以及實施效果沒有達到預定的目標;人力資源風險主要表現為缺乏有效的實施顧問指導、企業缺乏具有實施能力的員工的風險。The technic which i use to elicit the coefficient of the prediction variable is that i firstly compute the dependance of condition attribute and decision attribute, then work out the importance of condition property ( financial index ), finally unify this importance and get the coefficient of prediction variable
通過計算條件屬性和決策屬性的依賴度來確定條件屬性的重要程度,對其進行歸一化處理后即得到預測變量的權系數,進而確定綜合預測模型。A lot of experiments have proved that the design of the measurement and control system of codog power plant experiment rig is feasible. it can complete the concerted task as well as provide an important base of the theory and the experiment to study further the credibility and the maneuverability
本文對整個系統進行了大量實驗研究,經證明整個測控系統的設計是可行的,能夠完成預定的要求,取得了一些對實船設計有參考價值的實驗結果,對進一步研究提高codog系統的可靠性和機動性提供了重要的理論及實驗基礎。The consequence proves that, the system has improved function, dependable running and handy manipulation, which improved the test quality and efficiency. it also has friendly interface and better direct view, can basically satisfy the requirements of standard test for the automobile ' s force of brake and the weight of its axles. it gained better social and economic benefits, which achieved the scheduled goal
結果表明,該系統功能完善、運行可靠,操作方便,大大提高了檢測精度與檢測速度,且系統軟體界面友好,直觀性強,基本滿足了汽車整車制動力及輪軸重量檢測標準的要求,獲得了良好的社會效益與經濟效益,達到了預定的目標。According to an order s total shipping unit, we would send the pre - determined parcel weight and dimensions and customer s chosen shipping method to the server of ups and canada post
然後根據貨品的運貨單位units ,我們會將預定的包裹重量,大小及顧客選擇的送貨方式,傳送到Total amount control is a control means in order to achieve in advance deciding environment objective, the dumped into the area pollution total amount is controlled within definited quantity, through effective measures, in serious pollution and pollution sources centralize or important protection areas
總量控制是在污染嚴重、污染源集中的區域或重點保護的區域?圍內,通過有效的措施,把排入這一區域的污染物總量控制在一定的數量之內,使其達到預定環境目標的一種控制手段。Aerospace series - carbon fibre preimpregnates - determination of mass per unit area ; german version en 2557 : 1997
航空航天系列.碳纖維預浸帶.單位面積重量測定The tactical missile seeker handover accuracy from midcourse to terminal guidance is researched. the small perturbation method is proposed to analyse error sensitivity of the seeker presetting parameters from error sources. firstly, the terminal guidance seeker presetting parameters are computed, based on the equations of a surface - to - air missile movement and a target movement. then the seeker presetting unaccuracy due to the command guidance radar measurement errors is also computed. it can be seen that the seeker presetting errors increase rapidly when the missile is close to the target, which leads to an important conclusion that the late seeker handover from midcourse to teminal guidance should be avoided
研究復合制導的戰術導彈中末制導交班的導引頭預定精度問題.提出用小擾動法分析導引頭預定參數對誤差源的誤差敏感性關系.以中遠程防空導彈為例,結合導彈運動方程組和目標運動模型,計算了中末制導交班的導引頭預定參數,並計算了在制導站雷達測量誤差下的末制導導引頭預定參數的計算精度.可知,導引頭定位參數的計算誤差隨著彈目距離的接近而顯著增大,得到中末制導交班不能太晚的重要結論Abstract : the tactical missile seeker handover accuracy from midcourse to terminal guidance is researched. the small perturbation method is proposed to analyse error sensitivity of the seeker presetting parameters from error sources. firstly, the terminal guidance seeker presetting parameters are computed, based on the equations of a surface - to - air missile movement and a target movement. then the seeker presetting unaccuracy due to the command guidance radar measurement errors is also computed. it can be seen that the seeker presetting errors increase rapidly when the missile is close to the target, which leads to an important conclusion that the late seeker handover from midcourse to teminal guidance should be avoided
文摘:研究復合制導的戰術導彈中末制導交班的導引頭預定精度問題.提出用小擾動法分析導引頭預定參數對誤差源的誤差敏感性關系.以中遠程防空導彈為例,結合導彈運動方程組和目標運動模型,計算了中末制導交班的導引頭預定參數,並計算了在制導站雷達測量誤差下的末制導導引頭預定參數的計算精度.可知,導引頭定位參數的計算誤差隨著彈目距離的接近而顯著增大,得到中末制導交班不能太晚的重要結論分享友人