預應力構造 的英文怎麼說

中文拼音 [yīnggòuzào]
預應力構造 英文
prestressed constructions
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. The two specimens, which are designed as : main beam - pre - stress beam ? floor ? frame columniation assemble the space specimens. in order to checkout whether the code can be applied for the special structure systems, the structure of the specimens refer to the current gb50010 - 2002 concrete structure design code and gb50011 - 2001 seismic resistant code

    本文試件的各組成件為:非邊梁梁板框架柱組合空間試件,各組成件的參照了現行《 gb50010 - 2002混凝土結設計規范》及《 gb50011 - 2001抗震規范》的有關規定,以檢驗規范及設計條例能否適用於該特殊結形式。
  2. Pretensioned space lattice structure is a new kind of space structure which develops very fast in recent years. through taking the pretensioning with tendon, the space lattice structure could effectively improve the weight of bearing, control the distortion of the structure, minimize the cost of the engineering

    拉索空間網格結是近幾年發展比較快的新型空間結體系。在空間網格結中通過拉索引入,能夠有效地提高結承載。控制結變形,降低工程價。
  3. This paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    建立混凝土連續梁橋度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的進行體系設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論
  4. Abstract : this paper sets up a fuzzy optimum math - model of the prestressed degree for prestressing bundle disposition of prestressed concrete continuous beam bridges, which is transformed into a clear math program by - level cut - set. by the solution of the clear math program, a succession of reasonable prestressing moments can be obtained. then it is convenient to dispose the prestressing system by only taking account of geometric factors of all controlling sections. based on this, a theory of automatic disposition of the prestressing bundles is proposed and an engineering example is given to demonstrate it

    文摘:建立混凝土連續梁橋度的模糊優化問題,按-水平截集解法,將模糊優化問題轉化為確定性的數學規劃問題.求得一較合理的消壓彎矩后,只需按控制截面的進行體系設計.在此基礎上提出了配束自動化的基本思想,並以一實例說明其理論
  5. Based on the results of experimental research, we can find that the construction method of joints zone are feasible and safe, the joints between concrete - filled steel tubular core columns and prestressed concrete beams have good ductility and good energy dissipation, and the concrete - filled steel tubular core columns can raise the shear strength of core area of joints and the bending strength of the column ends

    試驗研究發現,針對該節點所設計的處理方式是可行的、安全的,鋼管混凝土核心柱與混凝土梁框架節點有著很好的延性和能量耗散能,由於柱為鋼管混凝土核心柱,大大提高了節點核心區的抗剪承載,同時也使柱端抗彎承載得到加強。
  6. In this thesis, the new structure of pre - stressed cantilever composite beam with corrugated steel webs on steel - concrete composite spine girder was brought forward for the first time, a series of experimental researches and theoretical analyses relating to this new structure are conducted, including load transverse distribution rule, shrinkage and creep effect, temperature difference effect, and ultimate bearing capacity

    本文提出大懸臂波形鋼腹板挑梁這一新的形式,對其橫向分佈規律、收縮徐變、溫差效以及承載能等方面的受特徵進行了分析和試驗研究。
  7. The main work is described as follows : ( 1 ) this thesis introduces the phylogeny, research and application actuality inland and abroad of steel - concrete composite structure with corrugated steel webs, summarizes the basic construction and forcing characteristic of pre - stressed cantilever composite beam with corrugated steel webs

    主要做了以下工作: ( 1 )介紹了波形鋼腹板組合結的發展歷史、在國內外的研究用現狀,總結了波形鋼腹板組合挑梁的基本特點和受特徵。
  8. In a big cantilever overhung structure, unbonded prestressing concrete technology can increase the stiffness of reinforced concrete brace, decreases the de - formation, cut down the column section area, save the cost, solve the difficult problems during the process of design and construction and also enlarge the range of unbonded prestressing concrete technology

    摘要在大懸臂懸挑結中,利用無粘結施工技術,提高鋼筋砼支撐的剛度,減小變形,減小柱截面面積,節約價,解決了設計、施工中的難題,擴大了無粘結技術的用范圍。
  9. It has been found out that using a prestressed concrete flat slab floor can decrease the thickness of the floor slab, improve forced property and service functions of the structure, and so as to save materials, reduce cost and prevent the cracks of shrinkage and temperature

    採用混凝土無梁樓蓋可以降低樓板厚度,改善結的受性能和使用功能,而且能節約材料,降低價,防止收縮和溫度裂縫的產生。
  10. Different from the construction of rc, the construction of pc needs high technique. there is a close relation between design and construction, and different manner of construction would result in different internal force of structure

    混凝土結的施工不同於普通鋼筋混凝土結的施工,其對技術有較高的要求,且在設計與施工上關系密切,施工方式的不同有可能成結的不同。
  11. Cfrp tendon is a new composite material manufactured by special technology, it has many advantages such as high - strength, low - density, better corrosion - resistant and so on, so it can potentially replace steel tendons in normal concrete structures and prestressed concrete str uctures, particularly in areas where corrosion is a problem

    碳纖維塑料筋是採用特殊工藝製的新型復合材料,它具有強度高,密度小,耐腐蝕等優點,能夠取代普通混凝土結混凝上結中的普通鋼筋和鋼筋,尤其是在鋼筋銹蝕問題嚴重的地區。
  12. This thesis aims to analyze how to select and assign prestressed tendon, how to design anchorage bearing joint, how to control the crack, how to calculate the axial prestressed force and the third moment and how to design the edge column of top layer. on the base of the research in and out our country and construction of the prestressed structure, some helpful conclusion and suggestion are presented, which is suggestive for the design and construction of long span continuous prestressed concrete frame

    本文將綜合設計與施工兩個方面,對筋的選用、布置,錨固區的設計及處理,裂縫問題,側向約束對梁軸向及柱中第三彎矩的影響,頂層大跨邊柱設計等幾個問題進行系統的分析研究,並在國內外研究和大量工程實踐的基礎上,提出了一些建議和防措施,對此類工程設計和施工有一定的參考價值。
  13. Considering the characteristics of internal force and structures of simply supported pc bridges, a novel automatically step - up method ( asum ), taking into account the influence of steel arrangement, steel ratio, stress losses of tendons and time - dependent concrete modulus, to analyze creep and shrinkage effects is presented. this method accepts all kinds of expressions of creep and shrinkage, and it is easy to calculate total stress, strain of concrete and steel and deflection of bridge at any time, the expected prediction accuracy will be obtained by further dividing the time - step within duration

    首先,針對混凝土簡支梁橋的受特徵和特點,提出了徐變效分析的全量形式自動遞進法,可考慮截面上鋼筋位置、配筋率、鋼筋鬆弛、混凝土彈性模量隨時間變化等影響,且計算式可適用於任何形式的收縮、徐變特性表達式;建立的公式可方便地求解任意時刻混凝土、鋼筋的變和跨中梁體的豎向變形,計算精度可方便地通過計算時段的細分來控制,直至給出滿意的結果。
  14. It is found that the prestress should be increased to reduce the loss of prestress with the deformation of the support

    研究表明在膜結的找形階段適當地加大結的初始,以減小由於支座變形所成的損失。
  15. By comparing the numerical results of water infiltration with air and without air, it is shown that the method in this paper is more effective for solving problems of water infiltration in unsaturated soil. in this paper the forming process of oil - bearing basin is the main research object and the mathematic model of geology is built, in order to simulate the dynamic forming process of stratums especially oil - bearing stratum in geology history in the time and space concept, further to investigate the history of petroleum forming, transmitting, accumulating and predict the distributing rule and scope of petroleum, and offer an rapid, quantitative, exact, general choice for the researcher of petroleum geology. with denudation, poor - compactness and sedimentation hiatus, the stratum relations of sedimentation section is judged, and the ancient thickness and pressure of stratum layer are recovered by the inversion method of back stripping. the numerical simulation algorithm of recovery of geological history is also given

    為了利用現代化的計算技術再現含油氣盆地的地史演化發育過程,以便進一步定量化研究油氣的生成、運移和聚集的歷史以及測油氣分佈規律、分佈范圍,為石油地質學家提供一個快速、準確、定量、綜合的研究手段,本文就含油氣盆地的地史演化發育過程為主要研究對象,建立了數學地質模型,運用優化理論與演算法,在考慮了剝蝕、欠壓實、沉積間斷等地質現象的情況下,採用回剝反演法,用鉆井、測井、地震等方法獲得的地層物性資料,判別沉積剖面中地層的接觸關系,恢復地層的古厚度、古壓了地史恢復的數值模擬方法。
  16. Using this new technology, there needs no the second tensioning of the prestressing tendons and temporary braces, thus the construction period and cost can be cut down obviously

    該改工程不需要對鋼筋二次張拉和對結進行臨時支撐,因而明顯地縮短了施工周期並節省了工程費用。
  17. For example, the large friction loss of prestressed tendons, complex anchorage bearing joint, the problem of cracks in large area structure, axial compress of long span continuous beam under prestress. all those hinder its use in long span structure. until now days, the cognition about the behavior of such structure under loads is not enough for the realm of prestressed concrete of all the world

    但是,技術用於大跨連續框架結,在設計和施工中還存在一些缺點和不足,例如筋的摩擦損失過大,節點錨固區設計和復雜、大面積結的裂縫控制問題、大跨框架梁在作用下的軸向縮短等,這些都是困擾大跨混凝土框架結用的突出問題,特別是目前對于混凝土超靜定結的受性能,國內外界的認識尚不夠全面。
  18. At present, crack phenomenon always appears in long span prestressed concrete continuous beam bridges used, the reason of which is that the structure prestressed loss is estimated lower

    目前,在部分已建成運營的大跨度混凝土連續梁橋的不同部位出現了不同程度的開裂現象,多數是由於施工時對結損失估計不足所成的。
  19. Relied on the scientific research fund project of the guangdong communication department : " the application research of high strength concrete in ultra - thin beam bridge ", the double - prestress ultra - thin beam composite structure is presented creatively by my tutor prof. shao xudong in the course of studying the ultra - thin beam bridge

    本文依託于廣東省交通廳科研基金項目《高強混凝土在超薄梁橋中的用研究》 ,本人導師邵旭東教授在超薄梁橋研究過程中創性的提出了二次超薄梁組合結
  20. This paper mainly describes the constructions of the formwork which is used in the monorail transit system in chongqing, and indicates that during the track girders ' fabrication, it is very important to pay attention to steel fabrication, orientation of conduct for tendon passing, the mixing, molding and maintaining of the concrete and the stretching of the prestressed tendon

    介紹了重慶市單軌交通系統中的混凝土軌道梁模板的,並闡述了在軌道梁製作過程中重點做好鋼筋製作、管道定位、混凝土拌制、成型、養護及筋張拉等工序的工作。
分享友人