預應力連續梁的英文怎麼說

中文拼音 [yīngliánliáng]
預應力連續梁英文
prestressed continuous beam

  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : Ⅰ動詞1 (連接) link; join; connect 2 (連累) involve (in trouble); implicate 3 [方言] (縫) ...
  • : Ⅰ形容詞(連接不斷) continuous; successive Ⅱ動詞1 (接在原有的后頭) continue; extend; join 2 (...
  • : 名詞1 (屋架中架在柱子上的長木) beam 2 (通常也指檁) purlin 3 (橋) bridge4 (物體中間條狀隆起...
  • 連續: continuation; succession; series; continuity; continuing; running; continuous; successive; contin...

※中文詞彙預應力連續梁在字典百科國語字典中的解釋。

  1. In order to meet the demand of bridgework, we monitor and analyze the stress and the deflection during the process of bridge construction

    本論文根據橋工程建設的需要,對施工過程中簡支轉結構的和撓度進行理論分析和施工監測。
  2. The paper, in the light of my bureau ' s construction experience and project practice in constructing large span prestressed continuous beam bridge ( continuous rigid frame ) in recent dozens of years, introduces a new thinking about the standardized design of cable - stayed hanging basket and the standardized construction technology of the continuous beam bridge ( continuous rigid frame ), gives the detailed account of a series of construction technique and achievements such as : the development and construction ways of large span continuous beam bridge, the standardized design thinking and operation of cable - stayed hanging basket, the standardized construction technology of the continuous beam bridge ( continuous rigid frame ) etc., meanwhile, it is attached with a whole set of detailed standardized design sample drawings of cable - stayed hanging basket

    本文根據我局十幾年來修建大跨度預應力連續梁剛構)橋的施工經驗和工程實例,介紹了一種斜拉式掛籃標準化設計的新思路及剛構)橋標準化施工工藝。詳細敘述了大跨度橋的發展、施工方法、斜拉式掛籃標準化設計思路及做法、剛構)橋標準化施工工藝等一系列施工技術及成果,並附有全套詳細的斜拉式掛藍標準化設計定型圖。對同類型橋的施工及掛籃設計具有參考價值。
  3. Using theory of structure intensity and prestressed concrete bridge, this paper reviews theoretical computing method of stress and deflection. making use of the procedure of computing bridge structure, the structure of simply supported - continuous system is calculated and the result is analyzed, the character on force and deflection is generalized in the paper

    運用學理論、混凝土結構強度理論和橋結構相關理論論述了橋與變形的理論計算方法;利用專用橋結構計算程序結合具體工程項目中的簡支轉結構進行了數值模擬計算,並對計算結果進行理論分析,提出這種結構型式在受狀態與結構變形上的特點。
  4. Abstract : through the practice of vertical pressers in long sp an continuous box - girder and the research of two - way prestress model test, the construction technology about unbonded vertical prestress is proposed and applie d in hanjiang bridge in hanchuan. for the first time, it ? s first adopted in long span concrete bridge in our country and a lot of economic benefits are created b ecause of its advantages such as little drill way, rapid and imple construction, h igh quality and so on

    文摘:通過漢川漢江公路大橋大跨徑豎向施工實踐和雙向模型試驗研究,在該橋施工中提出並用了無粘結豎向技術.這在國內大跨徑砼橋樑上尚屬首次全面採用,它具有孔道直徑小,施工簡便快速,質量易於保證等優點,為全橋施工創造了較為顯著的社會經濟效益
  5. Based on the linear creep theory and deformation coordination principle, the calculation method and computing formulas about the inner force redistribution and the stress redistribution are investigated in this thesis, the validity of this method is demonstrated by comparison the calculated results with the tested results

    基於線性徐變理論和變形協調原理,本文研究了二次預應力連續梁的徐變內重分佈和徐變重分佈的計算理論和計算方法,並與試驗結果進行比較,以求驗證本文方法的可行性。
分享友人