預應力錨索 的英文怎麼說

中文拼音 [yīngmáosuǒ]
預應力錨索 英文
tendon
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  • : 名詞(鐵制的停船設備) anchor
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  1. The construction technology for the prestress anchored retaining wall

    預應力錨索樁板墻施工技術
  2. The article structure the landslide prevention and cure, the structure of prestress anchors and its application in detail. basing on the geology condition of fabricating yard, we calculate the solid power and the length of anchor rope. we have worked out the experiment research scheme, and has carried on the earlier stage experiment, field demarcation experiment and has opened pulling the experiment on the spot. ten teams of steel rope to two teams of structure types twist the experimental data that thread internal stress and the total pulling force has been in progress research, and has put forward raising the measure of solid capability of prestress anchor and administering possessing

    本文以川藏公路滑坡路段為研究對象,對滑坡的治理、預應力錨索的結構、作用及其在滑坡防治中的用進行了詳細的分析;基於施工現場的地質條件,對最佳固段長度進行了理論計算;制定了實驗研究方案,進行了前期實驗、現場標定實驗、實地張拉實驗;對兩組結構型式的十組鋼絞線內及總張拉的實驗數據進行了研究,提出了提高預應力錨索固性能的措施,以及具體的施工方案和施工工藝。
  3. The structure of prestressed anchor - rope and groundsill is one of the most effective sheathing works, it is used wildly in some slop protection works. the structure is made up of prestressed anchor - rope and groundsill. the combined structure can utilize the latent energy of rock or soil mass

    預應力錨索地梁結構是一種極其有效且正推廣用於各工程部門的支擋防護體系。該結構由預應力錨索和地梁共同組成。
  4. Internal force calculating method of prestressed - cable beam - on - foundation for high rock slope

    巖石高邊坡預應力錨索地梁的一種內計算方法
  5. Construction technology for pre - stressed anchor - rope in buttressed retaining wall

    預應力錨索在扶壁式擋墻中的施工技術
  6. Abstract : this paper introduces four typical light - retaining structures. they are frame girder with prestressed anchor ropes, antislide pile with preslressed anchor ropes, anchored nelwork with jetting concrete and retaining wall with root piles. these structures are successfully applied to the national highway no. 107 in guangdong province

    文摘:以國道107線清連一級公路上四個典型的邊坡病害治理工程為例,介紹預應力錨索格構梁、預應力錨索抗滑樁、噴掛網支護、樹根樁擋土墻等輕型支擋結構在公路邊坡病害治理工程中的
  7. Strengthening steep slope at new putaojing tunnel using prestressed anchor ropes

    新葡萄箐隧道陡崖病害的預應力錨索加固
  8. Basic tests on the prestressing force anchor of a high slope project

    路塹高邊坡固工程預應力錨索基本試驗
  9. Construction technology of prestressing anchor cable consolidation for high road cut side slope

    預應力錨索加固高路塹邊坡施工技術
  10. Depend on the advantage of military industry, it has been a professional company which could research, develop, design and machining pre - stress cable anchor, bolt and other machine

    藉助軍工優勢成為一家集科研設計加工預應力錨索具和機具的專業企業。
  11. Probe into the prestressed anchor wire construction technology

    預應力錨索施工技術探討
  12. Dynamic design for anti - slide piles with prestressed anchor cables

    預應力錨索抗滑樁的動態設計
  13. Construction of powerhouse slope pre - stressed anchorage cable in malutang hydropower project

    馬鹿塘水電站廠房邊坡預應力錨索施工
  14. 3. in applications, the structure of stabilizing piles with pre - stressed anchor cables can be associated with retaining wall, combined bolting and shotcrete, precast concrete lagging ( plain, troughlike, archlike shapes ), and so on, which enlarge the application areas of this structure

    3 、在實際用中,預應力錨索抗滑樁可與砌石擋墻、噴支護、制擋板(平板、槽形板、拱形板等)聯合作用,形成多種形式的組合結構,從而可擴大這種結構型式的用范圍。
  15. Besides experiments, the present domestic and abroad study on anti - slide pile is mainly analysis by traditional cantilever beam method, foundation coefficient method and elastic mechanic method. on the basis of previous studies, this paper carries out a research on relevant design and calculation theory about anti - slide piles, comprising the interaction between anti - slide piles and rock and soil of side slopes, the soil arching model of anti - slide piles and the internal stress calculation method of prestressed anchor cables

    目前國內外對抗滑樁的研究,除試驗研究外,主要採用傳統的懸臂梁法、地基系數法及彈性學方法來進行分析。本文在前人的研究基礎上,通過對抗滑樁相關設計計算理論進行研究,包括抗滑樁與邊坡巖土體的相互作用,抗滑樁的土拱效模型以及抗滑樁預應力錨索的內計算方法進行分析。
  16. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽水電站泄洪閘閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加張拉,考慮了可能發生的多種荷載工況組合,並與無閘墩結構進行了對比分析研究,指出其效果是明顯的,可以大大改善閘墩結構的受狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的成果和各荷載下的位移成果,這些成果的取得對閘墩的設計具有一定的指導和參考價值。
  17. This paper presents analysis on the engineering geologic features, cause of revival and prediction of the developing trend of the captioned landslide in zigui county, together with the proposed treatment measures, which will be of reference value for other landslide treatment practices

    摘要在論述三峽庫區秭歸縣歸州四號滑坡工程地質特徵、復活原因、後期變化趨勢的基礎上,提出滑坡治理方案,進行預應力錨索抗滑樁、樁間檔土板、植被護坡、地面排水等分項工程設計,總結本滑坡治理工程的設計經驗,供其它滑坡治理工程參考。
  18. The test data of dongping project, which belongs to beijing - zhuhai highway at guangdong province, are given in this thesis. all the data are drawn to diagrams and compare with the theory compute results of winkler method and continue beam method separately

    本文還對東坪工點的預應力錨索地梁進行了現場試驗,測試了,地梁土壓以及梁內鋼筋拉,並繪製成相關數據表和相曲線圖。
  19. On the basis of the important research project of the ministry of communications - the prevent and study of slope disaster in the project of beijing - zhuhai highway, the thesis developed the structure ' s design theory. in order to design more reasonable, the thesis propose the cohesion shear stress is unequal distribute at the anchorage zone. and it can be divided into two parts, the front function is uniform and the behind is exponential

    為了合理的進行工程設計,本文按彈塑性理論對預應力錨索固段的黏結剪進行了分析,將固段劃分為塑性變形區段和彈性受區段兩部分,認為固段黏結剪為非均勻分佈,前段剪為均勻折減,後段剪為寸旨數變化,由此提出了相固段長度計算公式。
  20. In this paper, author compare with shenzhen holiday plaza project ( be known as firstly deepest foundation pit, deepest excavation depth is 21m ), use combinative method for theory guidance, test study, simulation analysis, project application and information feedback, entirely and deeply study prestress anchor cable composite soil nail, and also make a pilot study for deformation of pile anchor composite soil nail

    本文以深圳假日廣場深基坑支護工程(號稱「深圳第一坑」 ,最深開挖21m )為背景,採用了理論指導、試驗研究、模擬分析、工程用和信息反饋相結合的方法,對預應力錨索復合土釘支護結構進行了全面深入的研究,對樁式復合土釘支護結構的變形進行了初步研究。
分享友人