預期出水量 的英文怎麼說

中文拼音 [chūshuǐliáng]
預期出水量 英文
expected yield
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 預期 : expect; anticipate
  • 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
  1. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河位的沙因素,及僅用沙因素有效研究位的可行性,並按變對應思想採集它們的相應數據;其次,由於相應位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪相應位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛上下游相應洪位過程的擬合誤差都較小;最後,明確黃河下游含沙位的主要影響方式,即含沙主要是與其它因素聯合對位作用;另外分析了要實現變動河床洪位過程準確報的困難所在及改進方向。
  2. In this paper, thermal evolution history of organic matter of the source rocks and hydrocarbon generation history have been researched by tti method, hydrocarbon migration direction and migration times were probed combining with the area structure development feature ; distribution pattern of the main reservoir intervals on lateral and longitudinal have been predicted by researching on development feature and control factors of the reservoir intervals, the actions of reservoir conditions in hydrocarbon accumulation and bearing also were probed combining with pore evolution feature ; the micro - pore feature of regional cap and direct seal in carboniferous - lower triassic in this area have been determined with micro - capillary pressure curve and intrusive mercury curve ; the prospecting districts have been pointed out combining with the hydro - geologic feature, the potential reservoirs were classified according to trap types in this area, the author attempt to evaluate on the hydrocarbon - bearing condition in the str ata of carboniferous ~ lower triassic from hydrocarbon generation and migration reservoir condition, reserved condition etc, and predict the reservoir types and hydrocarbon - bearing patterns combining with the structure evolution. based on above, the author point out that the central block of chenghu - tuditang synclinorium and the southern block of dangyang synclinorium are the advantageous regions for exploration

    本文用tti方法研究了烴源巖有機質的熱演化史和油氣生成史,並結合區內構造發育特徵,探討油氣在區域上的運移方向和在時間上的運移次;通過對儲集層段的發育特徵和控制因素的研究,測了本區主要的儲集層段在橫向上和縱向上的分佈規律,並結合孔隙演化特徵,探討儲集條件在油氣聚集成藏中的作用;利用微毛細管壓力曲線法和壓汞法,對石炭系?下三疊統的區域蓋層和直接蓋層的微孔隙特徵進行了定評價,並結合文地質分佈特徵,指有利於油氣保存的地區;根據區內存在的各種圈閉類型,對可能存在的油氣藏進行了分類,並試圖從油氣的生成與運移、儲集條件、保存條件等方面,動態地綜合評價石炭系?下三疊統油氣成藏條件,並結合構造演化特徵,測其油氣藏類型和成藏模式。
  3. The top widely give or get an electric shocks to wait the evd of the actual shipments the predominances measure to all compare to expect to want little, up widely give or get an electric shock the first shipment 2000 set, ratio in advance conceive big for the shrinkage. machine business enterprise of another 7 greatest discses within evd alliances, now haven t take outed the kind machine, and more have no a substance action on the market. created the even to put off the evd production plan, and start all over again to beat to build the high and pure dvd ; grow the to now return at hesitate the stage ; ten thousand benefits reach a business enterprise is then directed to throw the center of gravity to face philip get the engraving of the dvd ; even if is a top to widely give or get an electric shock, and also apparently diligently not, recent capital increase 577 ten thousand usds used for to engrave the production of the dvd with develop

    上廣電等evd主導者的實際都比要少,上廣電首批貨2000臺,比先設想大為縮。 evd聯盟中的另外7大碟機企業,目前還沒有拿樣機,在市場上更沒有實質性的動作。創維甚至擱置了evd的生產計劃,另起爐灶打造高清dvd長虹目前還在觀望階段萬利達等好幾家企業則直接將重心投向了飛利浦領銜的刻錄dvd即便是上廣電,也似乎用心不專,最近增資577萬美元用於刻錄dvd的生產和研發。
  4. The primary causes of the regime shortage are the state monopoly and the state control over the education. the primary cause of the structure shortage is that the budgetary appropriations are not in favor of the compulsory education and the underdeveloped district. then this article puts forward some suggestion to alleviant these kinds of educational shortage : to raise the repay of human capital ; to initiate a system of public financial regulation ; to increase the government appropriation for education ; to relax the state control over education ; to improve the form of the financial transference expenditure, and so on

    性短缺的成因主要是我國人口多、經濟發展平低,教育投資資本邊際效率遞減趨勢、教育投資收益相對偏低等;財政性短缺的主要成因是在國家加快推進工業化特別是優先發展重工業的戰略下,政府財政支的重點必然傾向物質生產部門,而近二十年的財政制度創新都因利益格局的剛性只能作有限突破等;體制性短缺的成因主要是政府壟斷阻礙各類要素往教育領域的流入等;結構性短缺的成因主要是分級分權撥款體制無法保證教育投資的公平等。
  5. And drawn the conclusion that the situation of " surplus in quantum but contradictive in structure " will maintain in the long run

    通過對比2000至2030年果總供需測值得結論認為,從長來看,中國果供需總過剩與結構矛盾還將長存在。
  6. During the construction of the dam foundation cut - off for dalong water control project, the construction techniques adaptable to the construction under the condition with high interference, short construction period and strict quality standard are selected through the related productive experiment, with which the problems such as the prevention and treatment of hole collapse and lowering steel reinforcement cage and pre - embedded grouting pipe into place are solved, and then the successful construction of the cut - off is guaranteed as well

    摘要在大隆利樞紐壩基防滲墻施工過程中,通過生產性試驗選擇了適合該防滲墻工程施工干擾大、工緊、質標準高的要求的施工技術,解決好了孔口塌孔的防、處理及鋼筋籠和理灌漿管下設等技術難題,保證了該防滲墻工程的成功建設。
  7. This article based on the height of strategy, combine the mind of quick logistic and precise logistic, design the logistic model of small and medium - sized enterprise, with the view of system and guided by this model, this article analysis the component of enterprise ’ s logistic system, meanwhile, considered the characters of those component and the realistic of enterprise, reference certain method, optimized the enterprise ’ s logistic system. because there is phenomenon “ benefit is carried inside out ” exist in logistic system, so, when we optimizing the logistic system, we must consider the influence between both sides in benefit is carried inside out. treat wholly improved as standard, among them, the most important relation is stock and transportation

    本文從企業的戰略發展的角度,結合敏捷物流和精益物流思想的優點,設計了中小企業物流模型,並以此為指導,以系統的觀點和整體優化為宗旨,通過規劃中小企業物流系統的組成部分,結合企業自身的實際和各組成部分的特點,對企業物流系統進行了優化設計;由於企業物流系統中存在著效益背反的現象,因此,本文以占企業物流成本比重較大的庫存和運輸兩大重要組成部分為重點,在綜合考慮背反雙方的相互影響下,通過庫存計劃管理的優化,設計合適庫存平和運輸的優化模型,並採用逆向思維綜合設計了運輸方式和運輸路線模型;同時提了企業要想切實地達到物流系統優化目標的三大對策。
  8. When the paper uses the optimization regulation, it divides the management time into " t " stages according to ten days to make up the decision having many stages of the reservoir ' s optimization regulation, and it takes the reservoir ' s retain quantity of water or retain status of water and confiscated quantity of water a s condition variable, takes the water quantity of drawing off or quantity of electricity as decision variable. when the confiscated quantity of water can be known or be forecasted in every stage during the period of management, that is to say the confiscated water process can adopt the determined process, we can make up determine dynamic plan model with many stages and take the minimal lacking water as objective function

    在動態規劃方法中把庫的整個調度,按句劃分為t個時段,以庫的蓄s或蓄位z和入庫q作為狀態變,以庫放q或電站力n或發電e作為決策變,構成一個多階段決策過程,當計劃調度內各時段的入庫徑流已知或可以報,即入庫徑流過程可以採用確定性徑流過程時,分別按缺d最小作為目標函數建立多階段確定性動態規劃數學模型。
  9. Based on the results of testing site, some problems of vacuum preloading was analyzed by plane strain finite element method. the relative stable seepage velocity field can be produced with the pumping time. the depth of negative pore - water pressure transferring increases with the pvds length

    最後,對真空聯合堆載壓的施工工藝進行了研究,提了在真空聯合堆載壓的中已相對較少,可適當減少開泵,並可採用停抽結合的變真空能法,在不影響加固效果的前提下,可以大大節省用電
  10. Because the supply water system is large - scale, the pump stations are many, the ways of supply water are complicated, and the adjustable spare is large, the whole data in the optimization of supply water, the flux and its variety regulations in the control stations ca n ' t be acquired. the paper predicts supply water during the process based on the theory of artificial neural network control. the optimization has two steps

    在實際供系統中很難準確地獲取整個管網的所有基礎數據,主要難以知所有節點的逐時流及其變化規律,因此成為供系統的優化調度的難點,本文採用人工神經網路對供進行測,應用二級優化調度,第一級以整個供系統的費用最小為目標,用回歸方法求各供節點的供;第二級利用流跟蹤的方法對每個供節點(泵站)實現優化運行,以在泵站內達到最大節能目的。
  11. The auditors may specify in advance the sampling risk that they want in their sample results and then compute a sample size that controls sampling risk at the desired level

    審計師可以先設定樣本結果中他們望的抽樣風險,然後計算將抽樣風險控制在平的樣本容
  12. There are three difficulties and key problems in this papaer : : the first problem is what is the dominance bearing of the leakage fractures, and how the bedrock fracture water distribute, the second is how to test the complex chemical behavior in experiment way and quantify the relative parameters, the last question is how to number the transportation of the element 90sr and its pollution to solve the three problems, this paper does lots of work and come to the prospective order, the creativities in this thesis as follow : ( 1 ) the dominance bearing of the leakage fractures and the distribution feature of the fracture water are ascertained based on rich geological data, these basal researches are very important, which are the premises to build the transport model of the fracture water in hae field

    本項研究工作的難點和關鍵問題有三個: hae處置場基巖裂隙系統中,導裂隙的優勢方位是什麼,基巖裂隙活躍帶分佈情況如何;怎麼對核素遷移的復雜化學行為進行實驗室測試並取得有關定化參數;怎樣數值化表現溶質的遷移行為和污染情況本論文在解決以上三個問題上做了大的工作,達到了的目的,其創新之處有以下三點: ( 1 )通過地質資料的分析,首次提了hae選處置場基巖裂隙導的優勢方位和基巖裂隙活躍帶的大致分佈特徵。它是一個很重要的基礎性研究成果,是建立hae處置場運動模型的前提。
  13. However, although prechlorination efficiently removed algae, its effect was directly related to the quantity of algae and was more obvious in the period of algae bloom. with regard to yellow river water in winter with low temperature and low turbidity, it was discovered that preozonation did not result in a substantial removal of total organic carbon ( toc ), but a remarkable uv254. it was further revealed that preozonation changed the characteristics and structure of organic matters and then enhanced removal efficiencie s of them by subsequent processes

    對于夏季高藻質,高錳酸鉀氧化對有機物有一定的去除能力,並能提高后續工藝質;氯化能顯著去除藻類,但后續工藝質受藻類數影響明顯,氯化只有在高藻才能提高后續常規處理工藝質;對于冬季低溫低濁臭氧化雖不能降低中有機物濃度,但能顯著提高后續常規處理單元質。
  14. Upon using an artificial neural network ( ann ) a new short - term climate forecast model with the monthly mean rainfall in june in the north of guangxi as predictand is established making empirical orthogonal functions ( eof ) to the 36 predictors ( 15 ssa predictors, 21 500hpa height predictors ) with over 0. 05 significant correlation level of previous 500hpa height and sea surface temperature ( sst ) field, and selecting the high relative principal components, at the same time, a new approach of constructing ann learning matrix is developed. predictive capability between the new model ( principal components ann model ) and linear regression model for the same predictors is discussed based on the independent samples and historical samples

    本文通過對廣西北部6月平均降)同北半球月平均500hpa高度場和北太平洋月平均海溫場進行相關普查,選取了前36個同相關顯著平達到0 . 05以上的報因子( 15個海溫場報因子, 21個高度場報因子) ,並運用自然正交函數展開方法對這36個前報因子展開,取其中同相關程度高的主成分,結合人工神經網路技術,提了一種新的構造人工神經網路學習矩陣的方法,建立了一種新的短氣候測模型。
  15. On the premise of the study about the developing of xi ' an city ' s water supply and the great variety in water supply and the shortage of water resource, aiming for the furthest benefit from the configuration of water supply source of xi ' an city and facilitating it ' s development, this paper analyzed the characteristics of water supply sources and its changing quantity, the rising demand of water in city and the situation about water supply source, studied the problem about water supply via a variety sources, raised the principles of optimized configuration of variety sources, built the model of water demand forecasting and optimized configuration, studied the configured plan and its managing pattern

    本論文從研究西安市城市供的發展過程入手,重點分析了城市供源和城市用需求增長的變化特點,在城市供狀況相當長的時內將表現為供大於求的重大變化和西安市資源性缺的現實沒有改變的背景下,以實現最大限度地發揮城市供系統的作用合理配置緘市供源,促進西安社會經濟的持續、快速、健康發展的總體目標,研究了運用多源科學合理的供問題。分析了西安市城市供源狀況、用變化特點以及各平年需,提了多源優化調配的原則,建立了需測模型與優化調配模型,初步研究了西安市城市供源合理配置方案和相應的管理模式。
  16. Grell scheme can simulate pw more accurate than others for coarse grid of mm5 and pw simulation of bm scheme is less accurate than others for fine grid of mm5. 3, the initial humidity fields reanalyzed by using gps pw can obviously improve its capability in revealing the water vapor distribution, which can result in restraining pw prediction bias during the earlier period of model integration so as to improve pw prediction

    3 、用gps測的可降資料調整mm5模式濕度初始場可明顯增強模式初始場描述汽分佈的能力,使其對可降的描述誤差明顯減小,有利於模式初始場更好地反映汽分佈的局地特徵,從而有效地控制模式積分初對可降報誤差。
  17. While it is true that china is modernizing its forces and increasing defense spending, the prospective improvements in overall military capability need to be set against the very low - technology starting point of china ' s armed forces

    中國的確在實現軍隊現代化並在增加國防支,但對于其總體軍力發展的卻不得不建立在中國武裝力技術平很低的起點上。
  18. Further, in light of the mathematic functions among price, efficiency and equity, the effects / impacts of water pricing methodologies on efficiency and equity in water resources reallocation have been analyzed, the results are that different pricing methods have distinguish impacts on efficiency for water resources uses while they have few impacts on equity for incomes due to reallocation of water resources. fourthly, because the regional water resources have some features of river basin, an integrated water resources management ( iwrm ) has been suggested for the efficient management of regional water resources, where the basic criteria and intensions of iwrm have been analyzed. in order to the iwrm for regional water resources, the enabling environments, the institutional roles and the management instruments will be needed

    再根據交易中的價與效率及公平性關系的數學模型,分析不同的價制定方法對資源再分配(權交易)的效率與公平性影響,提的不同的定價方法對資源使用效率有顯著影響,而對公平性基本沒有影響;針對區域資源具有流域特徵的實際情況,提了區域資源綜合管理( iwrm )的模式,分析了iwrm的基本原則和包含的內容,進行了為實施iwrm的關鍵措施和體制安排,要實現區域資源的綜合管理就必須具有寬松的環境、充分發揮管理機構的作用和靈活運用先進的管理手段;根據區域資源的特點和可持續利用原則,進行了區域張仁田:區域資源可持續利用研究資源開發利用戰略方針的研究,按照制定的19項戰略方針,對一特定的區域進行了不同用戶資源需的中、長測,其中包括生態環境需,並採用iqqm模型進行供需平衡分析,提在工程設施保證、技術措施和體制及法律保障到位的情況下,遠能夠實現供需平衡。
  19. The article calculate the sale income, gross cost, income, cash flow, internal rate of return, net present value, payback period in etc. then i contrast analysis result of calculating with one of feasibility study and national standard, i have got a conclusion to analysis though ca7200e3 transformation - shell project from 2000 to 2005 management result can not achieve than assume, but this project management result is better than national standard. in conclusion the project is successful. 38 - 40 as proceeding the assessment, the article also gives many suggestion on the future of the project. i have a lot analysis from several aspect, they includes project background analysis, market analysis, project condition analysis, finance analysis, etc. these analysis prove that the project is feasibility

    論文比較分析ca7200e3變速器整體前殼項目可研與項目實際運行的符合度,找項目實際運行與可研測之間偏差產生的原因;論文首先對項目立項決策科學性、產品技術方案可靠性、原材料供應經濟性、組織機構和人力資源配置合理性進行了綜合評價;然後對項目建設中費用、進度、質、合同、信息管理工作存在問題進行了系統分析評價;接下來對項目運行狀況從產、效益多方面進行分析,找項目運行中存在的主要問題,並分析了問題產生的主要原因;最後在項目產品未來發展需求測基礎上結合項目立項后評價、建設后評價、特別是運營狀況后評價所發現的問題,對如何提高該項目管理平給了相關建議。
  20. In accordance with the practical situation of ben - gang water supply systems, this thesis find out the problem in the operation. the research contents include three aspects which are short - term load forecasting and decision of optimum operation scheme and the renewal of equipment in water supply systems. the firstly discusses the short - term water consumption problem with three models : grey forecasting model, artificial neural network model and modified artificial neural network model, it is very valuable that the modified artificial neural network model

    本文根據本鋼供系統的實際狀況,找了本鋼供系統運行中存在的不足,進而提了相應的改進措施。主要內容包括供系統短負荷測,確定系統最優調度方案和設備更新與設備投資問題。在測部分運用灰色測方法, bp神經網路方法和改進的神經網路方法進行用測,並進行比較分析,重點提用遺傳演算法進行神經網路權系優化的改進演算法。
分享友人