預測計劃 的英文怎麼說
中文拼音 [yùcèjìhuà]
預測計劃
英文
business planning- 預 : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 計 : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
- 劃 : 劃動詞1 (撥水前進) paddle; row 2 (合算) be to one s profit; pay 3 (用尖銳的東西在別的東西上...
- 預測 : calculate; forecast; prognosis; divine; forecasting; foreshadowing; predetermination
- 計劃 : 1 (工作、行動以前預先擬定的內容和步驟) plan; project; programme; device; devisal; design 2 (做...
-
A number of other types of information are also relayed into the computer, including information from picket ships, aew aircraft, ground observer corps , aircraft spotters, flight plans for both military and civilian aircraft, and weather information
一些其他類型的信息也傳遞給了計算機,這些信息來自(雷達)哨艦, aew載預警飛機、地面觀測隊和空中偵查,還有軍用和民用飛機的飛行計劃、氣象等等信息The research of this paper includes three parts : the first, according to the statistical figures about the cargo transport in recent years, it analyzes cargo transport structure and the changing law and the internal reason of cargo transport. at the same time it analyzes and calculates the change of the arriving ships " structure for a systematic and full understand of the transport demands. the second, it make a scientific forecast of the port ' s future cargo capacity making use of the grey forecast system, which provides scientific basis for medium - long term development plan of the port ' s cargo handling capacity
本文研究的工作主要分三個部分:第一,根據張家港近年來有關貨物運輸的一些統計數據,對貨物運輸的結構和規模演變的規律及內在原因作一剖析,同時對到港船舶的結構變化進行預測,以求對運輸需求有一個系統全面的了解;第二,應用灰色預測系統對張家港港未來港口貨運吞吐量進行科學預測,為張家港港貨物裝卸能力規劃提供科學依據;應用物元分析技術對張家港港口的未來發展前景作出一定程度的分析、研究,找出張家港港口未來發展規劃的零散無序、不成系統的因素,總結前人經驗的基礎上採用綜合評判物元模型進行評判,在預測港口未來發展規劃是否科學實際上具有獨到見解。Accurate load forecasting is helpful to planning generators " starting and stopping in the interior of the electrical networks economically and reasonably, preserving the security and stability of power system, reducing the unnecessary circumvolving repertory capacity, making planning to overhaul the units in reason, ensuring the normal production and life of the society, effectively reducing the cost of generating electricity, increasing the economical and social benefit
電力負荷預測是供電部門的重要工作之一,準確的負荷預測,可以經濟合理地安排電網內部發電機的啟停,保持電網運行的安全穩定性,減少不必要的旋轉儲備容量,合理安排機組檢修計劃,保證社會的正常生產和生活,有效地降低發電成本,提高經濟效益和社會效益。Information publication planning budget, selecting channels, contacting advertisement agencies, proofreading documents, assessing effects recruiting participating job fairs, collecting resumes, contacting interviewees, responding emergencies
信息發布預算計劃媒體選擇廣告代理商接觸稿件的校對效果測定招聘人才招聘會的參加簡歷的整理面試者的聯系緊急變化的對應And the influence factors of production planning are analysis, the effect of client relationship to planning is brought forward in stress, the correspond method is adopted. in the second place, after the analysis to mechanical system is done, the function model and information model is set up aimimg to the planning management. there are four secondary function module, includeing market forcast, planning prepare, attemper planning resource and monitor planning process in the planning function management
首先,闡述了面向訂單生產的計劃特點,對生產計劃的影響因素進行分解,著重提出了客戶關系對計劃的影響,並對此所採取的相應對策;其次,對製造系統進行總體的分析后,針對計劃管理模塊建立了相應的功能模型和信息模型,在計劃管理的功能模塊中,分別對計劃中的四個子功能模塊:市場預測、計劃準備、調度計劃資源、監督計劃過程進行功能分析;在計劃管理的信息模型模塊中,根據企業的資源狀況,將計劃分為年度生產計劃、月度計劃、日計劃。They ensure a multi disciplinary approach to programmes ; identify priority areas of action for the organization in the region and, in collaboration with departments and divisions at headquarters, advise on the incorporation of such priorities into the organization s programme of work and budget ; implement approved programmes in the region ; and monitor the level of programme implementation and draw attention to any deficiencies
它們確保一種多學科的計劃執行方式;為本組織確定在該區域的重點行動領域,與總部各部司協作,就將這類重點納入本組織工作計劃和預算提出咨詢意見;執行該區域的批準計劃;監測計劃執行量和提醒注意任何缺陷。The main procedure and steps are following as : according the random characteristic of the time spent by each work procedure, computer simulation is applied to produce the most possible scheduling network. and by corresponding optimization and adjustment on the network, the cost and scheduling construction network can be obtained ; during the practical construction according to the network, the warp between the actual cost and expected scheduling is tracked dynamically. then the computer simulation system is used to predict the future cost and progress operation, and take corresponding precautionary measures to control beforehand
其主要思想與步驟為:首先運用計算機模擬技術來模擬工序作業時間的隨機特性,產生概率最大的施工網路計劃,並對其進行優化和調整,以獲得滿足工期、質量要求的成本及網路計劃;在施工過程中動態跟蹤施工實際成本與進度與目標計劃所發生的偏差以及質量問題,然後根據已出現的偏差,利用計算機模擬技術對項目未實施部分進行進度、成本的預測和分析,根據現有信息對網路計劃未完成部分進行調整和優化,以盡可能把各項費用控制在預定計劃成本之內或使工程的綜合指標最優。Ecpc of the university of california at san diego hui et
Rcm ,這項工作是短期氣候預測計劃一部份C. 2 - note 1 : the new product introduction program should include provisions for such programs as : quality and reliability prediction studies, pilot production, demand and capacity studies, sales and service personnel training, and new product post - introduction evaluations
註解1新產品介紹程序應包括以下程序:質量及可靠性預測計劃,試制產品,需求及產量計劃,銷售及服務人員培訓,新產品定位估計。Material requirement planning ( mrp ) is a theory of stock planning and production planning. mrp can work out a detail production plan of every material, and then every purchasing plan
物料需求計劃( mrp )是一種庫存計劃方法和生產計劃方法,依據客戶訂單的需求或者銷售預測,計算出每一種自製的成品、部件、零件的生產計劃,以及每一種采購件的采購計劃。Among these numerous prediction methods, bp neutral network methods is considered as the best one and applied prevalently, with high precision, good effect and feasibility. so this study chose bp to predict water demand in tangshan city of the programming year of 2010 year. because the original statistic data of water resources utilizing was about resident living and factory producing, water demand with bp method was just the two
對幾種典型需水量預測方法進行評析,在眾多預測方法中選擇應用最為廣泛、預測精度高、效果好的bp神經網路法預測規劃水平年2010年城市需水量,由於原始統計數據主要城市生活和工業用水, bp預測的也只是這兩部分用水量,對于農業用水則通過灌溉用水定額和灌溉面積計算,生態環境用水則是類比調查確定。The fifth chapter discusses and values some supply chain management modes at present, such as vmi ( vendor managed inventory ), jmi ( jointly managed inventory ) and cpfr ( collaborative planning, forecasting and replenishment )
第五章,對現有的供應鏈管理模式: vmi (供應商管理庫存) 、 jmi (聯合庫存管理) 、 cpfr (共同預測、計劃與補充)進行了分析和評價。The fourth chapter makes an analysis and evaluation on the existing supply chain management modes, such as vmi ( vendor managed inventory ), jmi ( joint managed inventory ), cpfr ( collaborative planning, forecasting and replenishment )
第四章,對現有的供應鏈庫存管理模式: vmi (供應商管理庫存) 、 jmi (聯合庫存管理) 、 cpfr (共同預測、計劃與補給)進行了較深入的分析和評價,並對cpfr系統的績效評價體系進行了研究。Based on summary of headstream of loss of quality - cost, finding key factor of the loss, this paper bring forward how to reduce the cost and increase benefit guarding against quality question and controlling emphases of quality - cost management by analyzing position of the loss and confirming duty of the loss. the forecast, planning, controlling, check and analysis of economic performance of quality - cost management can carried out by setting items of quality - cost management and relative technical methods of accounting. the quality - cost management is a very complicated task
通過對質量成本損失源的分層歸集,找出質量成本損失的關鍵因素,提出了如何進行質量整改,降低質量成本,提高項目的經濟效益;通過分析質量成本損失的位置,明確質量成本損失的責任,從而預防質量問題的發生,把握質量成本管理的重點;通過設立質量成本管理的科目,藉助管理會計的有關技術方法,對質量管理工作的經濟性進行預測、計劃、控制、核算和分析。The master project plan includes a budget plan, capacity plan, communications plan, deployment plan, development plan, pilot plan, purchasing and facilities plan, security plan, test plan, and training plan
主項目計劃包括預算計劃、容量計劃、通信計劃、部署計劃、開發計劃、試驗計劃、采購和設施計劃、安全計劃、測試計劃和培訓計劃。While a major purpose of the beach water quality monitoring programme is to chart long - term trends and changes in water quality, there are times when the programme alerts the government and the public to sudden and unexpected deterioration due to pollution incidents. in such cases, the epd in collaboration with other government departments brings into operation its beach pollution response plan, which is designed to call a series of anti - pollution measures into play quickly and effectively
環保署推行泳灘水質監測計劃,主要目的是評估水質的長期趨勢和變化,此外如發生個別不可預計的污染事故導致水質惡化,我們亦會立即知會相關單位和公眾,並與其它有關部門協力執行泳灘污染應變計劃,迅速而有效地實施各種抗污染措施。On the basis of the preset plan of software testing engineers, the automated software testing system is expected to conduct the automated testing by means of automated testing tools or other methods ; thus lightening the intensity involved in the labour of by - hand testing and enhancing the quality of software
自動化測試就是希望能夠通過自動化測試工具或其他手段,按照測試工程師的預定計劃進行自動的測試,從而達到減輕手工測試的勞動量、提高軟體質量的目的。For 25 years the leadership of our national programmes in prediction have been making the assumption that the problem is simple and will therefore have a simple prescriptive solution
過去25年裡,我們的國家地震預測計劃的領導者一直假定這個問題是簡單的,並認為因此應當有簡單的次第方案。 」Further allocation of public funds appears unwarranted unless there are specific and compelling grounds for thinking that a proposed new prediction programme will be successful
進一步將公共資金分配給這個方面看來缺乏正當理想,除非有引人注目的基礎得以認為提議中的一個新的預測計劃將是成功的。 」Finally, by using of the mathematical model, it is calculated and predicted the effect of the different tongguan riverbed elevations as well as the different conditions of incoming water and sediment on the variance of the flood elevation and the tend of aggradation and degradation of the lower weihe river bed. it is answered quantitively the lessening extent of sediment silt and the decreasing extent of the flood elevation of the lower weihe river after 14 years on two different incoming water and sediment conditions with three different tongguan elevations, respectively 328m, 327m and 326m. these results supply important references to the planning of flood control and comprehensive regulations of the weihe river basin
最後用驗證后的數學模型對不同水沙系列、不同潼關高程( 328m 、 327m 、 326m )下渭河下游的沖淤趨勢和洪水位的變化進行了預測計算,從定量上回答了潼關高程從328m降至327m (相當于潼關高程降1m )和潼關高程從328m降至326m (相當于潼關高程降2m )時,渭河下游14年之後各河段的減淤程度以及不同流量級洪水位的降低幅度,這些成果對于渭河下游防洪治理規劃的制定具有重要的參考價值。分享友人