預澆制 的英文怎麼說

中文拼音 [jiāozhì]
預澆制 英文
precast
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : 澆名詞(姓氏) a surname
  • : Ⅰ動詞1 (製造) make; manufacture 2 (擬訂; 規定) draw up; establish 3 (用強力約束; 限定; 管束...
  1. Precast concrete products - general rules for factory production control of metallic fibered concrete

    鑄混凝土產品.金屬纖維混凝土工廠生產控的一般規則
  2. Precast concrete products - general rules for factory production control of metallic fibered concrete ; german version en 14650 : 2005

    鑄混凝土產品.金屬纖維混凝土工廠生產控通用規
  3. The early - crack analysis and pre - control of ribbed floor slab placed by pre - mixing concrete

    拌混凝土肋形樓板的早期裂縫分析和防治
  4. Based on the construction of the testing section for the lining of jiping main canal in shandong province of south - to - north water transfer project, the main causes of the cracking from the mechanized lining concrete slabs are analyzed from the aspects of foundation treatment, bedding layer placement, quality of the raw materials for the concrete, placement of the concrete, cutting of the hardened concrete and the curing of the concrete, and then the relevant prevention and control measures are pertinently put forward

    摘要結合山東省南水北調濟平乾渠工程襯砌試驗段施工情況,著重從地基處理、墊層料鋪設、混凝土原材料質量、混凝土築、成型混凝土割縫及養護幾個方面分析了機械化襯砌混凝土板裂縫產生的主要原因,並針對性地提出了防及控措施。
  5. As part of the renovation, the hotel ‘ s intricate terra cotta trim was painstakingly cleaned, and damaged pieces repaired with glass - reinforced concrete castings and finishes matched to the originals

    作為改建的內容之一,該旅館錯綜復雜的陶瓷磚裝飾部分,被人們煞費苦心地清理干凈一些損壞的部分則採用玻璃(纖維)增強混凝土現而成,其修復程度可以與原件相媲美。
  6. Expanded polystyrene case - bay fillers for concrete floors with prefabricated binders and dividing floor

    梁和現場注混凝土樓板斂縫用膨脹聚苯乙烯
  7. During the temperature fields, the results indicate that the processing parameters such as the extrusion velocity, casting temperature, perform preheating temperature, die preheating temperature and so on are important for the temperature fields besides the dwell time. they are must be in concordance each other to the deforming zone is in the quasi - solid state, and the stable semi - solid extrusion is implemented. during the deforming fields, the hyperbolic sine thermo - rigid - viscoplastic fem model is selected according to the forming feature of the process, and the variations of the stress - strain fields are studied

    在溫度場的模擬中,模擬結果表明,保壓時間是影響製件成形質量的關鍵因素之一,擠壓速度、液態金屬注溫度、熱溫度和模具熱溫度等工藝參數對溫度場的影響也很大,需進行參數之間的協調,只有當變形區內部始終維持準固態時,才能實現穩定的液-固擠壓成形過程;在變形場的模擬中,根據液態浸滲擠壓的成形特徵,選用了雙曲正弦剛-粘塑性有限元計算模型,研究了變形過程中應力應變場的變化規律,研究了模角對變形和金屬流動的影響及變形力的變化過程和其影響因素。
  8. Liquid - solid extrusion of composite material is a new kind of metal forming process, which has been developed in recent years with a promising practical application prospect for its simple working procedure, low cost and good workpiece performance. through a lot of experiments, the optimization and chosing method of key process parameters ( pouring temperature, mold warm - up temperature, impregnating pressure, impregnating time ) has been mastered. under the precondition of appropriate chosing these parameters, the effective control of extrusion velocity is the key of mading good workpiece. but the control of extrusion velocity remains a handwork, and it is heavily affected by such uncertainties as a handler ' s knowledge and skill about the process. in order to solve the problem, the automatic control of the extrusion velocity is studied, and a computer control system is also designed under existing condition

    通過大量實驗,已掌握了關鍵工藝參數(熔液注溫度、擠壓模熱溫度、浸漬時間、浸漬力)的優化選取方法。在合理選取關鍵工藝參數的前提下,擠壓速度的控是成形出質量良好製件的關鍵。但是,目前對于擠壓速度的控仍停留在手動控階段,利用該工藝備管、棒材製件的成功與否受操作者對該工藝及其設備的經驗及熟練程度等不確定因素影響很大。
  9. The sensitivity algorithm is a knowledge of research on the affection of parameters varies to system performance. combination with pressing force and infuse time predicted model, by using sensitivity algorithm, the affection of cast temperature, mould temperature and infuse pressure on infuse time is researched deeply, and the affection of cast temperature, infuse time and infuse pressure on the pressing force in the origination stage of extrusion process. the sensitivity analysis has huge instructing significance to the selection of parameters

    靈敏度演算法是分析參數變化對系統性能影響的一種有效工具,所以本文引入靈敏度演算法,結合壓力和浸滲時間測模型,深入研究了注溫度、模具溫度和浸滲壓力對浸滲時間的影響關系,以及注溫度、模具溫度、浸滲時間和浸滲壓力對擠壓過程起始階段壓力的影響,對于參數的選取,具有一定的指導意義。
  10. Wear resistant layer of cylinder and double - layer liner in catalyst creaking apparatus ( without or with tortoiseshell net can be used ), inner liner of carbon monoxide exhaust - heat boiler, pouring at site for furnace roof with high temperature of heating furnace of steel rolling, different forging furnace, resistance furnace, the prefabricated parts can also be made

    催化裂化裝置中的筒體耐磨層及雙層襯里, (無龜甲網和有龜甲網均可採用)及一氧化碳余熱鍋爐的內襯,也適用於軋鋼加熱爐、各種煅造爐、電阻爐的爐頂、爐墻、爐底高溫部位的現場注,可製成構件。
  11. Thermosetting resin / org - mmt nanocomposite, including exopy resin / org - mmt and phenolic resin / org - mmt, were prepared by in situ intercalation polymerization, and the intercalation and exfloliation behaviour of them were characterized by x - ray diffraction ( xrd ), dynamic mechanical thermal analysis ( dmta ), and different scanning calorimetry ( dsc )

    採用原位插層聚合法通過模固化成型備了熱固性樹脂蒙脫土納米復合材料,並用xrd , dmta , dsc等手段研究了熱固性樹脂與有機蒙脫土的插層與剝離行為,並對固化過程進行了理論估。
  12. Study of u shaped girder with pre - cast main beam and cast in - situ slab

    主梁現道床板的槽形梁研究
  13. At the finishing of this paper, the effective identification of designing factors is done and the setting elevation and the cable tension force in next stage are forecasted according to the situation of finished beams. through the forecasting, the constructing state is in coincidence with the designing state. during the bridge construction process, the value of designing parameters are made close to the construction state by means of data collections, optimal controls and detailed analysis of different reasons that caused errors

    最後,根據施工的實際狀態對設計參數進行了有效的識別,並利用灰色理論與測控相結合的方法,根據已梁段的實際狀況對下一施工梁段的立模標高和斜拉索張拉索力進行測,使施工過程中的受力狀態與已確定的合理施工狀態達到一致。
  14. Precast concrete casting yard

    混凝土灌場
  15. Reinforcements set in the precast slabs lapped with each other at the side of the slabs. in this way, the floor stands loads in two ways. the prestress in precast slabs can improve mechanical performance and meet the demands of large room width in many building structures

    本論文主要研究單向應力雙向疊合板樓蓋,其以應力疊合底板為底模,利用板側伸出鋼筋的搭接實現橫向傳力,變單向受力為雙向受力;通過二次築混凝土形成整體樓蓋結構;通過底板中單向施加先張應力改善了樓蓋的受力性能,滿足了大開間及不同型式建築的要求。
  16. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連計劃對轉爐爐次計劃的編有很高的要求,合理安排來料、煉鋼與鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵爐與lf爐站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。
  17. Secondly, the producing mechanism of crack in reinforced structure and factors which affect crack have been discussed, in the emphasis, the method is expounded, which applies first releasing then resisting, combination of releasing and resisting. in the method, flexible slit is applied firstly, which can make deformation of structure distributed, and decrease deformation energy, then the tiny expansion concrete and prestressed concrete with unbonded tendons are applied. and in the different phase, the compressive prestress is put on the concrete structure

    其次,分析並論述了鋼筋混凝土結構裂縫產生的機理和影響因素,著重闡述了「利用先放后抗,抗放結合,綜合控」的方法:即首先利用后帶,使混凝土結構分段變形,減小超長變形的影響;並採用微膨脹混凝土技術及無粘結應力混凝土技術,分階段對混凝土結構施加一定的壓應力,從而減小或完全抵消混凝土結構因混凝土硬化收縮引起的拉應力;再結合一些其他措施,成功實現鋼筋混凝土結構的超長無縫設計與施工。
  18. Refractory products. prepared unshaped materials. dense and insulating castables. consistency test

    耐火製品.散裝耐火材料.置密和隔熱鑄塊.稠度試驗
  19. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工程,結合已有的橋梁施工控的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非線性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非線性的桁元模擬斜拉索、施工掛藍作為結構單元進行拆裝,參與受力計算,整個施工過程按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、築完畢階段混凝土、張拉應力鋼筋和張拉斜拉索。
  20. Throw the research we can get the performance of the joint of the unbond precast and pretressed continuous beam and how the moment redistributes. we got the conclusion that compare the monolithic prestressed continuous beam, the unbond precast and pretressed continuous beam has short amplitude modulation capacity

    得到應力連續梁接縫處的受力性能,內力重分佈的表現形式,並認為在極限荷載下應力連續梁的調幅能力低於整式連續梁等特性。
分享友人