預計航程 的英文怎麼說

中文拼音 [hángchéng]
預計航程 英文
projected range
  • : Ⅰ副詞(預先; 事先) in advance; beforehand Ⅱ動詞(參與) take part in
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • : Ⅰ名詞(船) boat; shipⅡ動詞(航行) navigate (by water or air); sail
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 預計 : estimate; calculate in advance; expect
  • 航程 : air-range; sail; flying range; voyage; passage; range
  1. Cost - this module realizes at present only budgeting and verification of part of the cost incurred in the maintenance and service of aton, i. e., management of the consumption of paint, fuel oil and lub oil

    5 、成本控制于系統:它上要負貢在標維護過中直接成本的使用情況(成本核算)以及使用惰況(成本算) 。
  2. Allows you to plan your trip ahead of time. it displays the scheduled departure and arrival times of our flights up to 2 years from now

    顯示現在至未來兩年我們班的離開及抵達時間,讓您能劃旅
  3. Hong kong north west express limited " hknwe " today held a ground breaking ceremony for the reconstruction and modification of the tuen mun ferry pier to facilitate the operation of a new cross - boundary ferry service in the first quarter of 2006

    香港西北運快線有限公司西北運今天為屯門渡輪碼頭的改建工舉行動工儀式。碼頭改建工乃配合在二零零六年第一季開展的跨境渡輪服務。
  4. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下洞室群圍巖穩定的安全可靠性分析:被成都勘測設研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工體系的長期監控警決策系統開發:為監控、報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下洞室群圍巖穩定的安全可靠性分析:被中南勘測設研究院應用於初步設方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東運規劃設院的靠船墩優化設和加固提供依據; ( 7 )溪洛渡高拱壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度算:為溪洛渡重大工壩體的靜動力安全穩定性及溫控方案提供依據。
  5. Nonlinear model based predictive control ( nmpc ) not only is a valuable approach for solving practical control problems, but also is the frontier of nonlinear control theory. the perceptible successes of mpc strategies can be attributed to several factors including its inherent ability to handle input and output constraints, time delay and incorporation of an explicit model of the plant into the optimization problem. this dissertation discusses two kinds of nonlinearity ( or nonlinear system )

    本文沿著理論研究與工實際相結合的設思路,較為系統和全面的研究了非線性模型測控制理論,提出改進新演算法;探討了非線性模型測控制理論在自主水下行器控制系統設中的應用,豐富和發展了模型測控制理論,本論文的主要工作及意義有以下幾個方面: 1 )從工應用的角度研究有限域無終端約束廣義測控制穩定性充分條件,為有約束廣義測控制穩定性研究奠定了基礎。
  6. Coastal and estuarine engineering, layout and planning of harbours and navigation channels ; river training, siltation prediction and its measures ; mathematical model computation and physical model experiments

    海岸河口工、港口道總體布局規劃、河道整治、泥沙淤積的測和對策、數學模型算和物理模型試驗研究。
  7. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對洞庭湖區的洪水組成、水流泥沙演變、河道湖泊水系分佈特點以及河道湖泊疏浚工布局情況,利用gis技術模擬洞庭湖地形變化,採用有限體積法建立了湖泊二維水力學算模型測疏浚工實施后的水位、流量、流速流場變化,為河道、道港口整治、河道疏浚清淤等工決策與實施提供了可靠理論依據。
  8. For this reason, the following problems are researched emphatically : firstly, the long - term prediction method for calculating the extreme values of slamming pressure is founded. the effects of sea conditions, ship speeds, traveling directions, loading conditions on the results of long - term prediction are studied. on this basis, the computing process is simplified rationally, so as to this method can be used in practical engineering computations

    為此,本文主要在下面幾個方面進行了探索:首先,建立了底板砰擊極值壓力的長期報方法,通過分析海況、速、向角、裝載狀態等不同的影響,合理簡化了長期報的算過
  9. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理位置和營運現狀,說明了船閘在道建設和水資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運量發展的測,並確定東溝船閘的設代表船型及營運組織;第三章東溝船閘改造工本章通過船閘改造工主要技術參數:船閘規模、尺度、設水位和高等的確定,設了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的設,並選定了啟閉機的主要技術參數和型式;第四章採用了工項目經濟評估方法對東溝船閘改造工二個設方案進行全面綜合比較后,確定了推薦方案。
  10. Out multilingual team at klm royal dutch airlines sales & service center will help you to plan your journey, provide travel solutions and help you to find the best deal for your trip

    荷蘭皇家空公司中國區乘客訂中心的多語種工作人員將協同您設,給您提供線建議,幫您撈到最惠票價。
  11. Based on the statistic materials of ports and shipping lines and the advice of specialists, this article analyzed the development course and status of passenger ocean transport on china - korea course, generalized the current problems. taking the port of weihai, qingdao and renchuan for example, using time series method, the author forecasted the volume of passenger on china - korea course in the next 10 years, analyzed the supply capacity and structure of passenger transport fleet, studied the constitute of the fleet, and made balance program for the passenger transport capacity on china - korea course, put forward tariff policy and competition mode of shipping companies

    本文在調查收集港各方面的統資料,聽取有關專家的意見的基礎上,分析了中韓線海上客運的發展歷和現狀,總結了現在存在的問題;運用時間序列測法,選取威海、青島和仁川為例,對山東半島至韓國間的客滾運輸線的客、貨運輸進行了今後10年該線的客流量測;分析了客運船隊運力供給及其結構,研究了當前船隊構成存在的問題,作出了中韓線客運運力的平衡規劃;提出運公司的運價策略,運輸競爭模式。
  12. As at today, 20 airlines have expressed interest to operate a total of 203 additional scheduled and ad - hoc charter flights ( i. e. a total of 406 flight movements ) from march 25 to april 7, with most applications falling on the period between march 29 ( good friday ) and april 1 ( easter monday ). the number of total flight movements on the first and the last days of the period are expected to be 653 and 619 respectively

    截至今日為止,二十間空公司表示有意在三月二十五日至四月七日期間,增加二百三班額外編定班和專包機(即共四百六機架次) ,其中以三月二十九日(復活節假期首日)至四月一日(復活節星期一)期間的加班機申請為最多,首尾兩天分別有六百五十三和六百一十九架次機升降。
  13. Abstract : approximate methods for calculating aerodynamic heating rates on space shuttles are discussed. various methods are given for predicting the heating rate at axisymmetric stagnation points, general three dimensional stagnationpoints and the leading edge stagnation point of wings. numerous laminar and turbulent heating techniques for flat plates and cones are analyzed and compared. a brief review of some methods is presented to predict heating rate for winward centerline and lateral direction off the symmetry plane. the results show that the methods are simpler and can guarantee enought precision for predicting aerodynamic heating environment of space shuttles

    文摘:介紹了國內外天飛機氣動加熱的工算方法.給出了軸對稱、非軸對稱和機翼前緣等各種外形駐點熱流密度的算,分析和比較了平板、錐體的層流和湍流熱流密度算的各種方法,概述了天飛機迎風面中心線和離開中心線橫向熱流密度的算.算結果表明,本文方法用在天飛機氣動熱環境初步設中比較簡單並且有足夠精度
  14. By completing more than 5 self - learning packages last year, mr. david tse, chief experimental officer and aviation forecaster, received an award under the learning recognition scheme of the civil service training and development institute

    身為報員的總學術主任謝明浩先生於去年完成公務員培訓處的自學課達五個以上,獲頒發自學獎勵劃獎項。
  15. News, information and route map. includes vr station and journey tours

    -提供劃及訂服務,並提供公司資料。
  16. The flight layout method based on the orientation theory and the simulation process and technology of aerial photography are introduced, the influence of the simulation rehearsal on aerial photography is discussed

    摘要介紹了一種基於定向理論的線設方法,利用設結果實現了攝模擬的技術與過,討論了實現攝過模擬演功能對攝工作的重要影響。
  17. In the paper, through the example of the waiting hall of xt an international airport, several main questions meet in the design have been discussed, analyzed and solved, which include in negative friction force around pile in collapsible loess, the calculating method of bearing capacity of pile. the crack control methods of analysis and design in the super - length reinforced structure have been tested in the project, and reached the effect to be hoped

    本文通過西安咸陽國際機場新站樓工的具體實例,分析、論述了建築結構在設中遇到並解決的幾個主要問題:如自重濕陷性黃土場地樁基負摩阻力問題;淺層土雖經強夯但下層土仍有可能產生負摩阻力時樁的承載力算方法;對鋼筋混凝土結構的裂縫控制實現超長設的分析和設對策,經過工驗證,達到了期的效果。
  18. The paper describes how to develop this network monitor and diagnose system. data acquisition based on pxi, design and accesses sql server database, network remote monitor based on asp. net and remote diagnose based on web service have been finished. a rlv healthy remote and diagnose system is developed and achieve prospective aim

    論文對該網路化監測診斷系統實現的各個方面進行了詳細的介紹,完成了基於pxi的虛擬儀器採集、 sqlserver數據庫設與訪問、基於asp . net的網路化遠監測和基於網路服務( webservice )的遠診斷部分序設,以天器為對象,開發了rlv健康監控與遠診斷系統,達到了期的設目的。
  19. The same conclusion as derived from the original pda under approximate condition is concluded this way without any approximations. the second method is the instant - state performance prediction based on the hyca method. this method not only gives the off - line recursive error variance relation, but also gets a series of performance measurement such as track life

    然後應用兩種方法對其進行性能估測,一是基於riccati方的穩態性能估,其結果與pda演算法近似條件下得出的結論相同;二是基於hyca方法的瞬態性能測,不僅給出了誤差方差的離線遞推關系,而且得到了跡壽命等一系列性能指標的估值。
  20. In the last part, with this new icx system model, the author design, program and implement an internet - based distributed e - business application ? cx online reservation system, and combine the model with practice application organically

    本文的最後,運用該新型的icx系統模型,作者設、編、實現了一個基於internet的分散式電子商務應用示例? ?冰浪在線定系統,將系統模型與實際應用進行了有機的結合。
分享友人