餘下工程 的英文怎麼說

中文拼音 [xiàgōngchéng]
餘下工程 英文
remaining works
  • : Ⅰ同「余」Ⅰ-Ⅳ1. Ⅱ名詞(姓氏) a surname
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 餘下 : remaining
  1. 177cl - sha tin new town - remaining engineering works

    177cl -沙田新市鎮-餘下工程
  2. In view of the engineering practice that retaining wall in the front edge of landslide is only deformed but not destructed completely as a result of the slide of slope, this paper presents a back calculation method of landslide shear strength index considering the residual resistance of retaining wall occurring topple, translation and shear deformation

    摘要針對滑坡的滑動僅使其前緣的擋墻發生位移或變形,但未使之完全破壞的實踐,系統提出了滑坡前緣的擋墻在發生傾覆、前移和剪切三種變形,考慮擋墻變形后對滑坡的剩抗滑作用進行滑帶土抗剪強度指標反算的理論和方法。
  3. According to the study of unrepairable product residue mean life, based on the mathematical description of the residue mean life and the basic knowledge of reliability and mathematical statistics, a method is deduced to assess the confidence lower limit for the mean residual life, and an engineering instance is analyzed

    通過對不可修復產品平均剩壽命的研究,基於產品平均剩壽命的數學描述,利用可靠性及數理統計的基礎知識,逐級推演,提出了適用於各種壽命分佈類型的產品平均剩壽命置信限的一種評估方法,並結合實例進行了分析。
  4. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開挖,除趾板與其游1 / 9底寬范圍以及壩腳挖除沖積層至弱風化(局部微風化)基巖外,其部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本特點在游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  5. The dynamic response of cylindrical shells and conical shells under radial non - uniform impulsive loading has an important application in the filed of military and civil engineering. in this dissertation, the problem of transient response of the cylindrical shell under longitudinal line - loading and that of the conical shell under cosinoidal impulsive loading are studied, and some useful conclusions that have important significances in both theoretic studies and engineering applications are obtained

    圓柱殼和圓錐殼在側向沖擊載荷作用的動力響應具有重要的軍事和民用背景,本文對縱向線載荷作用的圓柱殼瞬態響應問題和弦沖擊載荷作用的圓錐殼瞬態響應問題進行了研究,取得了一些具有重要理論意義和實用價值的研究成果。
  6. After an initial study, the government has identified 16 sections of nullahs that can be improved and formulated a long - term plan to deck over them in phases. of the 16 projects, eight will be completed in three years, four in six years and the remaining four in 10 years

    經初步研究,政府已經選定十六段可以改善的明渠,並訂立了一個長期計劃,分階段加以覆蓋,其中八段的會在三年內完成,四段在六年內完成,四段在十年內完成。
  7. Current, the company sets professional designing institute and at provincial each district sets 10 branches, have personnel of technology of of all kinds project more than 160, skilled worker 500 more than person, for china the building decorates association director unit, home of guild of adornment of standing director unit and zhejiang province building installs guild of adornment of zhejiang province building appoint vice - chairman unit

    目前,公司設專業設計院並於省內各地設有十個分公司,擁有各類技術人員160名,技術人500人,為中國建築裝飾協會理事單位,浙江省建築裝飾行業協會常務理事單位及浙江省建築裝飾行業協會家裝委副會長單位。
  8. The test obsvervation include air temperature, ground temperature, foundation moisture, freeze depth, freeze capicity, freeze residual capicity, groundwater table and shape transform of canal lining, etc. throught systemic observation, analysis of impact about each factor on fundation freeze capicity, evaluate effect on anti freeze of various canal lining, comparison on technology and ecnomic of different method, a kind of main canal lining format is been recommended to engineering practice with siutable to ningxia local feature, fufilling the need of main canal safey i application, economic and practical, that is using polystyrene plate laying under concrete slate and grit taking replace of filling layer and optimizing design

    試驗觀測內容包括氣溫、地溫、基土含水量、凍深、凍脹量、凍脹剩量、地水位和砌體外觀變化等項目。通過系統的觀測,分析各因素對基土凍脹量的影響,評價各種襯砌型式的防凍西安理大學碩士專業學位論文脹效果,並進行技術和經濟綜合分析比較,推薦出了適合我區特點、滿足乾渠安全運行、經濟實用、防凍脹效果好的乾渠防滲襯砌型式,即混凝土板鋪設聚苯乙烯板和砂礫石換填層結構型式,加以優化設計,用於實踐。
  9. C. complete the remaining landscaping works and irrigation system ; and

    C .完成環境美化和灌溉系統及
  10. Will be drained down again after the waders leave in may and the whole project is expected to be finished in early october 2002

    待過境涉禽於五月離去后,基圍會再被放乾以進行的推土,整個推土預計於二二年十月初完成。
  11. Using the complex potential method in the plane theory of elasticity of an anisotropic body, a series solution to the stress field of a finite plate containing multiple cracks subjected to arbitrary loads is obtained by means of the faber series expansion, and the stress intensity factors at the crack tips are calculated based on the theories of fracture mechanics. equivalence yield stress is introduced in order to consider the effects of the plastic zones, with which the strip yield criteria is developed in the article so that the effects of structural size and the crack interactions on the stress distribution can be considered accurately. the effects of plate size, crack size and crack distributions on the stress intensity factors as well as the residual strength of the plate are studied detailedly

    採用各向異性體平面彈性理論中的復勢方法,以faber級數為具,得到了含多裂紋有限大板在任意載荷作用應力場的級數解,並應用斷裂力學方法確定裂紋尖端的應力強度因子;引入當量屈服應力考慮裂尖塑性區的影響,提出基於帶屈服準則的剩強度分析模型,能夠充分考慮結構尺寸和裂紋之間相互作用對應力場的影響;通過數值計算詳細討論了結構尺寸和裂紋之間位置關系對應力強度因子和結構剩強度的影響規律,得到了一系列對應用具有實用價值的結論。
  12. Mainly adopting mathematical - statistical method and in combination with engineering practice, this paper discusses the residual life estimation method of hydraulic steel gate structure under different rusty conditions and analyses the reliability of residual life of existing hydraulic steel gate ( including extended service ones )

    主要採用數理統計理論的方法,結合實踐,探索水鋼閘門結構在不同銹蝕條件的剩壽命估算方法,分析既有(包括超期服役)水鋼閘門剩壽命的可靠性。
  13. Science park at pak shek kok - phase 1 remaining works

    白石角科學園-第1期餘下工程
  14. Information paper on remaining engineering infrastructure works for pak shek kok development

    關于白石角發展計劃基礎設施餘下工程的資料文件
  15. Outstanding works in progress between kam ying road and footbridge fb1

    錦英路至行人天橋fb1之餘下工程進行中
  16. Wan chai east and north point sewerage, remaining works

    灣仔東部及北角污水收集系統餘下工程
  17. Information paper on pwp item no. 177cl - sha tin new town - remaining engineering works

    關于"務計劃項目第177cl號沙田新市鎮餘下工程"的資料文件
  18. Air and sea communications - port works - improvements to government dockyard - remaining works capital works reserve fund - block allocations

    海空交通-港口-政府船塢改善計劃-餘下工程
  19. Improvement to hong kong central mid level and high level areas water supply - remaining works

    港島中區半山及以上地區供水改善計劃餘下工程
  20. Improvement to hong kong central mid - level and high level areas water supply - remaining works

    港島中區半山及以上地區供水系統改善計劃餘下工程
分享友人