馬壩 的英文怎麼說

中文拼音 []
馬壩 英文
maba
  • : Ⅰ名詞1 [動物學] (哺乳動物) horse 2 (象棋棋子) horse one of the pieces in chinese chess3 (姓...
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. Hong kong s airport was the only asian achiever in a list that included the panama canal, the channel tunnel and egypt s aswan high dam

    香港國際機場贏得這項殊榮,是亞洲區唯一可與巴拿運河英法海峽隧道和埃及阿斯旺水同享殊榮的建築工程項目
  2. Salmon that manage to evade the commercial fishing fleets, hungry bears, dams, and fishermen swim to their birthplaces and spawn before dying

    為了回到它的出生地產卵,大哈魚必須從漁船、饑餓的熊、河以及漁網的重重圍捕下逃生。
  3. China is building a large hydro power station on the upper reaches of yarlung zango ( brahamputra ) river and a barrage on sutlej, which was first reported by the hindustan times in june last year

    中國正在雅魯藏布江(布拉普特拉河)上游建造一座大型水電站,同時還在薩特累季河建造一座大,這一消息于去年六月時被《印度斯坦時報》首次披露。
  4. And from the end of the reservoir, a 3 - mile long aqueduct would gravitate water to the shenzhen reservoir. from the reservoir, water further gravitates to hong kong. the dongshen water supply scheme started at the qiutou (

    東深工程運河起自廣東省東莞市橋頭縣,流經司、旗嶺、灘、塘廈、竹塘、沙嶺、上埔、雁田及深圳等地,全長83公里,主要建設包括6座攔河閘和八級抽水站。
  5. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam bodys tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和庫區特大洪水等因素對家田尾礦堆積體穩定性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的穩定性。
  6. In this paper, regarding the analysis of stability factors of majiatian tailings fill dam, namely regional geologic structure, rock - soil body of dam foundation, poor geology phenomenon, leach consolidation and chemical consolidation of tailings, seepage water of dam body and king - size flood water of majiatian tailings reservoir, a preliminary demonstration on probability of earthquake liquefaction and seepage failure of dam body ' s tailings sand soil, of the dam body failure resulted from abutment landslide and of the flood water overflowing crest, as well as on the contribution of leach consolidation and chemical consolidation of tailings to the stability of dam body has been performed

    通過對家田尾礦庫區域地質構造、庫區不良地質觀察、尾礦淋濾固結和化學固結、體滲透水和庫區特大洪水等因素對家田尾礦堆積體穩定性影響的分析,初步論證了體尾礦砂土的地震液化、滲透破壞、肩滑坡使體失穩和洪水漫頂的可能性,以及尾礦淋濾固結和化學固結作用有助於體的穩定性。
  7. As he rode towards the dike, prince andrey smelled the fresh, muddy smell of the pond

    在馳經過堤時,安德烈公爵聞到池塘的綠藻和清涼的氣息。
  8. Through the all - sided tectonic analyses, it can be deduced that there are two aspects will be the hidden defects to the dam and the engineering stability of the reservoir area. one is the dislocation interfaces resulting from the the majiaheba faultage ' s thrusting overriding and other causes of formation. the second is the region of strong deformation, such as the above of the dam, middle and high positions of the lava layers and the regions of overprint of the structure of ne to the one of nw, which should be taken into account especially

    通過區域和區錯動帶的全面構造解析,認為由家河斷層逆沖推覆作用而在區形成的向金沙江下游緩傾的錯動帶以及其它成因的錯動帶是區和庫區工程穩定的隱患,尤其是變形較強的址區上游區、中高層位以及北西向構造期的錯動帶疊加於北東向構造期錯動帶的部位,更應該引起足夠的重視。
  9. The second stage of the uprating engineering works were implemented after the signing of the agreement in august 1979 endorsing the planning report for the second stage extension of the dongshen water supply system. the main works were to extend the pumping facilities at matan, tongxia, zhutang, shaling, shanpu and yantian, and to increase the height of the main dam of shenzhen reservoir by 1 metre. the new works included the construction of a new pumping station - the dongjiang pumping station at the intake point at the riverbank of dongjiang to increase the volume of supply

    第二期工程於1979年8月簽訂《東江深圳供水工程第二期擴建規劃報告》協議后進行,主要是再擴大原工程在灘、塘廈、竹塘、沙嶺、上埔及雁田的抽水站,加高深圳水庫主1米,新建的工程則包括于新開河口興建東江抽水站,提高供水數量。
  10. The dislocation interfaces, which have different directions, different combinations, different scale, different deformation strength and different properties, are belonged to shallow structure. they are the products of multi - stages, multi - periods and multi - causes of movement during the himalayan epoch. they were controlled by and resulted from 2 structural stress fields of ne structure and nw structure

    由此認識到,區發育的不同方向、不同形態和組合型式、不同規模、不同變形強度和不同性質的錯動帶屬于地殼淺部構造層次,是本區喜拉雅運動多期次、多階段、多成因的構造產物,分屬于區域上ne向構造帶和nw向構造帶的構造成分,並受控于這兩期構造的構造應力場。
  11. Just upstream is a small beaver dam, one of three ? the first dams documented on the river in 50 years

    就在上游不遠處,有個小型的海貍水,是50年來首次被記錄到的三個水之一,拉河的支流沼溪就有六個海貍水
  12. The dislocation interfaces of early stage were controlled by the slide of the ne fold. the dominant dislocation interfaces, in the dam area, is the one of the second stage, which resulted from the slide of the lava layer and lagerkluftes from nw to se because of the affect of the majiaheba faultage ' s thrusting overriding to the dam area from nw to se. the dislocation interfaces of the third stage were the result of the overprint of the structure of ne to the one of nw

    早期階段形成的錯動帶受控于北東向縱彎褶皺的層間彎滑機制;第二階段形成的錯動帶在區佔主導地位,它們是由於北東向家河斷層由北西向南東的滑脫逆沖推覆影響區,並造成區向南東緩傾的巖層沿原生構造面向南東滑動的結果;第三階段形成的錯動帶則是由於北西向構造疊加於早期北東向構造之上而致。
  13. 1. china international exhibition centre 2. xibahe 3

    1 .國際展覽中心2 .西河3 .安貞橋4 .甸橋
  14. The energy minister, malcolm wicks, also has a letter on his desk from mr hain, calling for a " clear commitment " in the government ' s energy review to examine the costs and benefits of the severn barrage

    能源大臣爾康?維克斯,也有一封來自海恩的信,要求在政府的能源政策覆審中有明確的交代以檢驗賽文巨的花費與利益。
  15. The entire village of ma wan at tung chung, lantau island, was removed and the villagers moved to a government - built village at nearby pa mei in connection with phase ii of the tung chung new town development

    在東涌新市鎮第二期發展計劃中,大嶼山東涌灣村全村搬遷,政府在尾附近興建遷置村,安置該村村民。
  16. Sino - foreign joint venture yangzhou baifa caps co., ltd, devel - oped from yangzhou 2nd caps factory , established in 1970, is located at xinba town, the suburb of yangzhou city, jiangsu province, which is specializing in manufactruing various baseball caps, junior caps, chindren hats, bucket hats etc

    揚州百發帽業有限公司源於揚州第二帽廠,創建於一九七0年,地處江蘇省揚州市南郊新鎮,是生產各式棒球帽、運動帽、帽、盆帽和折帽的專業生產廠家。
  17. The sceneries are including piled rainbow bridge, big sand dam, e lu long, moon lake ( chai shi tan reservoir ), and ma ti river

    包括疊虹橋景區、大沙景區、三腳洞景區、阿路龍景區、明月湖景區(即柴石灘水庫) 、蹄河景區。
  18. Mr ma jun, being the famous chinese dams freshwater activist and the director of an ngo called the institute of public and environmental affairs, was named as one of the 100 most influential persons in the world by time magazine in may 2006

    中國著名水淡水資源保育人士軍先生為非政府組織公眾與環境研究中心的主任,於2006年5月獲時代雜志選為全球100名最具影響力的人物之一。
  19. When completed the concrete dam was 150 ft. high and was the most magnificent of its kind in hong kong. aside from the main dam, there were three subsidiary dams, 37 kms of catchwaters, a water treatment works in tsuen wan and service reservoirs in lai chi kok, ma tau wei, diamond hill and ngau tau kok

    除主外,還包括了三條副、長37公里的引水道、配合水塘供水的荃灣濾水廠,以及荔枝角、頭圍、鉆石山、牛頭角等配水庫,集水區廣達2 , 000畝。
  20. The stability of the section of the ash dam situated in a seismic zone for matou power plant is analyzed with the total seismic stress approach of shear strength herein, and then the engineering measures to enhance the seismic stability of the dam are studied as well ; which can provide a reference basis for the seismic design of the dam

    摘要採用地震總應力抗剪強度分析法對粉煤灰進行了斷面穩定計算分析,研究了提高頭發電總廠貯灰地震穩定性的工程措施,為體的抗震設計提供參考依據。
分享友人