驗收程序 的英文怎麼說

中文拼音 [yànshōuchéng]
驗收程序 英文
acceptance procedure
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ動詞1 (把攤開的或分散的事物聚集、合攏) put away; take in 2 (收取) collect 3 (收割) harvest...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 驗收 : check and accept; check before acceptance; check upon delivery; acceptance check; control reception
  • 程序 : 1 (進行次序) order; procedure; course; sequence; schedule; ground rule; routing process 2 [自動...
  1. Equipement for harvesting. combine harvesters. test procedure

    割設備.聯合割機.試
  2. Disigning coolant channel on the firebox of liquid rocket engine to loxodrome ( equal - angle helix ) groove can improve firebox coolant capability greatly. because the width dimension of loxodrome groove is narrow and the depth is deep, some machining methods are incapable, such as end - milling or electrochemistry. according to the peculiarities, a cnc disk - cutter - milling method which is composed of five motion axes with four simultaneously interpolated ones is researched. because most firebox generatrix is composed of complex curves, it is very difficult to get cnc cutting program with manual means. in order to deal with the problem, the loxodrome mathematics model is studied, and an auto - programming software system is developed. the software system can generate cnc cutting program of loxodrome on many kinds of turned surface. the constriction - distension segment of firebox is the most representative workpiece. the sharp changing of its generatrix slope makes loxodrome milling difficult. with the theory analyzing and practice cutting experiment, some applied techniques, which include milling mode and direction, choosing cutter diameter and cutting start point setting, are developed. adopting the technology above, tens regular workpiece have been manufacturing. the two - year manufacture practice has confirmed the validity and feasibility of developed loxodrome coolant channel milling method. the developed technology is also worth to be referenced to other similar workpiece

    將液體火箭發動機燃燒室的冷卻通道設計為斜航線(等傾角螺旋線)槽形,可以大幅度改善燃燒室的冷卻性能.斜航線冷卻槽的槽寬尺寸較小而槽深尺寸較大,所以無法使用棒銑刀銑削、電化學等加工方式.針對這些特點,提出了五軸控制、四軸聯動的數控片銑刀銑削加工方法.由於燃燒室外表面的母線輪廓復雜,手工編制數控加工難度大.為了解決數控加工的編制問題,研究了斜航線的數學模型,開發了自動編軟體系統.使用該系統,可以生成多種母線輪廓回轉體外表面上的斜航線數控加工.燃燒室斂-擴張段的母線斜率變化大,加工難度大,是斜航線冷卻通道加工的最典型工件.經過理論分析和實際切削實,研究了針對該類型工件的片銑刀直徑選擇、銑削方式和方向、刀具調整和起刀點的設置等多項實際的加工方案.採用上述的一系列技術,已經成功地加工了數十個合格工件.經過兩年多的實際生產過應用,證了所開發的斜航線冷卻通道加工方法的正確性和可行性.這些加工技術的研製成功,對其他相似類型零件的加工亦具有參考意義
  3. Thales communications shall make good within a reasonable time the non conformities and submit the corrected equipment to acceptance as per the above mentioned procedure

    泰雷茲通信公司應在一段合理的時間內彌補不足之處,並將修正過的設備按照上述提交
  4. Follow up and monitor manufacturing process, inspect and accept the finished components of wind turbine ; supervise the fulfillment of specifications and relative standards

    制定采購部件的檢計劃,包括過和最後驗收程序的計劃。
  5. Procedure for inspection, testing and acceptance of wrought aluminium and aluminium alloys

    鍛鋁和鋁合金的檢驗收程序
  6. Procedure for inspection, testing and acceptance of steel sheet and strip

    鋼板和鋼帶檢驗收程序
  7. Procedure for inspection, testing and acceptance of seamless steel tubes and tubestock

    無縫鋼管和管材的檢驗收程序
  8. Procedure for inspection, testing and acceptance of aluminium - base and magnesium - base ingots and castings

    鋁基和鎂基鑄錠和鑄件的檢驗收程序
  9. Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection

    制定采購部件的檢計劃,包括過和最後驗收程序的計劃。
  10. Introduction of a rule of completion acceptance on municipal engineering quality

    備案制下市政工質量竣工驗收程序介紹
  11. Implementation of the acceptance procedures ( documentationwise )

    (文檔方面的)驗收程序的實施。
  12. Procedure for inspection, testing and acceptance of wrought copper alloys

    鍛造銅合金的檢測,試驗收程序
  13. Delivery and acceptance process

    交付及驗收程序
  14. Lot acceptance procedure for verifying compliance with the specified quality level in ppm

    證符合規定質量等級ppm批量驗收程序
  15. Fixed railway equipment. safety electromechanical relays. approval procedure and type tests

    鐵路固定設備.安全電機繼電器.驗收程序和定型試
  16. Tas semiconductor devices - technology approval schedule for monolithic microwave integrated circuits

    半導體器件.單片微波集成電路的技術驗收程序
  17. Rules of procedure of the iec quality assessment system for electronic components - part 3 : approval procedures ; amendment 1 concerning approval and accreditation of a supervising inspectorate

    電子元器件iec質量評定體系的規則.第3部分:驗收程序.修改件1 :監督檢查人員職責的認可和鑒定
  18. This paper analyzes the inefficiency of present acceptance procedures for urban rail transit construction in china in line with the characteristics of urban rail transit engineering, and puts forward a new systemic acceptance procedure for it

    摘要針對城市軌道交通工的特點,分析當前我國城市軌道交通建設領域工驗收程序的不足,提出一種系統的工驗收程序和相應的工作流
  19. Railway applications - wheelsets and bogies - monobloc wheels - technical approval - forged and rolled wheels

    鐵路設施.輪副和轉向架.整輪.技術驗收程序.鍛制和軋制輪
  20. Tas semiconductor devices - part 16 - 10 : technology approval schedule for monolithic microwave integrated circuits

    半導體器件.第16 - 10部分:單片型微波集成電路的技術驗收程序
分享友人