驗電板 的英文怎麼說

中文拼音 [yàndiànbǎn]
驗電板 英文
proof plane
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ名詞1 (片狀硬物體) board; plank; plate 2 (專指店鋪的門板) shutter 3 [音樂] (打拍子的樂器) ...
  1. Can be used to locate cable and pc board emission " hot spots " and evaluate emc problems at the breadboard and prototype level

    ,可用於探測纜和印製的發射「熱點」並評估試和樣機階段的磁相容
  2. Electronics engineers build their models with breadboard circuits, using the laws of physics to determine expected values for various properties and then precision instruments to measure actual values

    子學工程師通過路試建造模型,運用物理學法則確定不同屬性的期望值,然後使用精密儀器來測量出實際值。
  3. Such as : the liner of coal bunker of power station, the lining of dust cyclone and classifying cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and low friction vehicle testing surface etc

    玄武巖鑄石主要用於襯砌火廠煤倉,各種規格旋風器,鋪設各類化工廠地面,汽車剎車試場地面等,也用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  4. The cast basalt tiles may be used in all kinds of ways. such as : the liner of coal bunker of power station, the lining of dust cyclone, the liner of chemical storage tank and warehouse for corrosion material, the floor material for chemical plants and lowfriction vehicle testing surface etc

    玄武巖鑄石主要用於襯砌火廠煤倉,各種規格旋風除塵器、旋流器、鋪設各類化工廠地面,汽車剎車試場地面等,也可用於襯砌酸洗槽或儲存腐蝕性物品的貯存室。
  5. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經的基礎上,結合蓮花水站在1995年及1996年導流渡汛工程措施設計及水工模型試,對混凝土面堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  6. At the same time, differen t arrays of electrodes have been studied. flow visualization has shown that the plasma between symmetric streamwise electrode strips ca n ' t induce flow velocity at the same phrase driving but can at multi - phrase driving, and asymmetric streamwise eledtrode strips can induce flow velocity both at the same phrase and at multi - phrase driving in still air. in principle, the experimental results correspond to that of the cooperant research between university of tennessee and nasa langley research center

    流動顯示實表明,在一個大氣壓下,對于極對稱分佈的情況,在同相位的射頻激勵下,靜止的空氣中沒有明顯的現象,而在多相位射頻激勵下,靜止空氣中的二維平上可以產生推力,誘導了流場;對于極的非對稱分佈的情況,在同相位或多相位的射頻激勵下,都能在二維平上產生推力,並誘導流場。
  7. According to the urgency and the necessity of reconstructing material mechanics lab, plans and suggestions were put forward in six aspects which consist of reconstructing universal material machine and photo - elastic instrument, rebuilding electrical testing lab, increasing devisable experiments, adding virtual experiments, making exhibit - boards

    摘要鑒于改造材料力學實室的緊迫性和必要性,從改造萬能材料試機、光彈儀和測實間,增加設計型實項目,增加虛擬實,製作展示等6個方面,提出了具體方案和建議。
  8. More than one thousand kinds of products have been produced, such as : the teaching models about physiology, biology, medicine, acupuncture and so on ; the section of biological specimen ; electro - dynamic mixer, comminuter, high speed homogenizer, writing board, pen, paraffin, stain et al

    生產的種類生理、生物、醫學、針灸等教學模型及生物標本切片和實動攪拌機、搗碎機、高速均質機、書寫、筆、石蠟、色素等產品種類千余鐘。
  9. Experiment research on active suspension of piezoelectric plate

    的主動控制實研究
  10. Based on the above work, the thesis brings forward the hardware platform scheme of the remote electronics experiment platform, which integrates the main experiment board, the signal source, the digital oscilloscope

    在此基礎上,提出了集實、信號源、數字示波器於一體的全數字化遠程子實硬體平臺方案。
  11. A complete solution provided by schneider electric on this project, schneider electric provided the low voltage switchboard, alarm monitoring system, control consoles, emergency engine telegraphy system, general alarm system and fire alarm system and some auxiliaries as a complete package including the design, manufacturing, engineering, factory accept test ( fat ), site commissioning and sea trial

    在該項目中,施耐德氣公司提供了低壓配、報警監測系統、監控臺和駕控臺、應急車鐘、通用報警系統和火警系統,以及其它一些輔助設備等的完整總包,它包括了設計、製造、工程、工廠收、現場調試和海上試航。
  12. According to the hardware structure of the main experiment board, the circuit netlist transformation program translates the visual circuit description to the actual netlist

    根據實的硬體結構,設計的專用路網表轉化程序,將便於用戶理解的圖形化的路描述轉化為便於實際硬體操作的路網表。
  13. The pcb designed with protel99se, is more convenient and reliable than the circuit on the bread board. that will be for the latter research

    用protel99se設計了印刷( pcb ) ,較之在麵包上搭建的實路,具有調試更方便,結構更緊湊,性能更穩定的優點。
  14. A circuit plate for the principle experiment of the pcm data dispatch amp; display in telemetry

    數據分路顯示原理實設計
  15. Recurring to the circuit netlist, the mcu of the main board finishes the digital setting for the parameters and the structure of the experiment circuit, which realize to do all kinds of electronics experiments in the same main experiment board

    控制實的單片機藉助于路網表所提供的信息,完成實路結構和參數的全數字化設置,從而實現了在同一實上完成不同的子實
  16. Measuring insulation resistance and reliability test protection device for main switchboard ( emergency switchboard )

    總配(應急配)絕緣阻測量和保護裝置可靠性試
  17. The assistance circuit board is made by myself, which is used to test the interface. the results show that the interface downloaded in the in - system programmable logic device - isp1032e and the driver programs for the generalized interface are executable

    用我們自己製作的外圍輔助試進行檢測試,結果表明下載到isplsi1032e中的多路復用介面路達到設計要求。
  18. Standard test method for conducting traverse and concentrated load tests on panels used in floor and roof construction

    進行地和屋面建築用配的橫向和集中載荷試的標準試方法
  19. The forth part introduces the hardware design of embedded remote watching based on wavelet video compression. the schematic drawing and the circuit board is presented. up to now the image can been outputted through the circuit board

    第四部分針對當前比較流行的嵌入式遙視,對一個基於小波視頻壓縮的實際遙視應用系統做了硬體設計,完成了硬體原理圖的設計和實的製作及調試,目前實已經能夠輸出圖像。
  20. Therefore, it is necessary for us to conduct a series of principle analysis on different sections of the station such as the fuel system, lube system and cooling system of the diesel engine for generators, and the shaft generator as well as the main switchboard etc. it is also important to carry out at meantime a number of reliability tests and analyze the test results so as to assure all the units of the station will run smoothly

    因此,我們通過對船舶站中柴油機的供油系統、潤滑系統、冷卻系統、軸帶發機、主配等各個環節從原理上進行分析,並進行必要的可靠性試,對試數據進行分析,確保船舶站各個環節的運行良好。