高拉索塔 的英文怎麼說

中文拼音 [gāosuǒ]
高拉索塔 英文
tall guyed tower
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 拉構詞成分。
  • : Ⅰ名詞1 (大繩子; 大鏈子) a large rope 2 (姓氏) a surname Ⅱ動詞1 (搜尋; 尋找) search 2 (要; ...
  1. According to the information concerned, the analogous structure were adopted on the alamilo bridge in sevilla, spain and on the curved cable - stayed bridge on golf court in xiaoye city, bingbu country, japan. at present, this kind of structure has not utilized all over the country yet. nanjing, the region of basic seismic intensity 7, is an unfavorable site for anti - earthquake in terms of geological conditions according to seismic code for buildings

    但是,主屬于傾斜聳結構,拱屬于柔性拱結構,屬于特殊懸結構,經檢了解,西班牙sevilla的alamilo橋和日本兵庫縣小野市內爾夫球場上的曲線斜橋採用過類似結構,國內目前尚未有此形態的結構記載,南京地區地震基本烈度為七度,地質條件按照建築抗震設計規范之規定,屬對抗震不利地段。
  2. Dearest and me too. sonya, natasha, petya, anna mihalovna, vera, and the old count were all hugging him ; and the servants and the maids flocked into the room with talk and outcries

    尼婭娜莎彼佳安娜米哈伊洛夫娜薇老伯爵都在擁抱他,男女僕人擠滿了幾個房間,說東道西,興得叫起來了。
  3. Design of ganzhuxi bridge a cable - stayed bridge with single plane, dwarf piers and hig - low towers

    甘竹溪大橋麵斜橋方案設計
  4. With the appearance of high strength concrete high tensile steel wire and cable, the cable - stayed bridge is more and more widely used and popular. it unites three diversely bearing structure style, compression tower tension cable and bending press beam, into one bridge style

    橋是隨著強度混凝土材料、強鋼絲和的出現才得到廣泛推廣應用的橋型,它把主受壓、及主梁受壓彎的三種不同受力的構件有機地組合在一個統一體中。
  5. Seek the sound cable tension to aim at minimum of maximum stress by the method of fem analysis combined with optimization. during optimization, use virtual lamina beam element to analyze the structure. the result of optimization of the cable tension of wenhui bridge shows this method is easy, effective and applicable

    用虛擬層合梁單元對結構進行計算,以梁和的最大應力最小為優化目標,採用有限元計算同優化分析相結合的方法來確定斜橋的合理成橋恆載力,文暉大橋成橋恆載力的優化結果表明該方法簡單、效、適用。
  6. The tower shafts, most of which are hollow and varying in cross section, and altitudinal construction bring trouble to the form work and the stress of strand wire. and the cracks on the crossbeams will be caused by the following - deformation of the bracing structure joints, elastic deformation , uneven settlement and temperature changes. the additional stress of the base slab and the foundation is caused by the deviation of cable bent tower construction

    但大跨度橋梁混凝土施工設備進場及現場管理都比較困難;柱多為空心變截面,且為空作業,給模板工程及預應力張帶來一定困難;支撐系統連接的間隙變形、彈性變形、不均勻沉降以及環境溫差可導致橫梁裂縫;施工偏位會引起的承臺和基礎的附加應力,對加勁梁的架設影響大;懸吊結構未完體系(架設時)施工階段的風致振動往往影響到施工的安全和質量;實心柱部分體積較大,易產生溫度裂縫。
  7. The cables, which will be the bridge ' s main support, are strung from tower to tower. they are made up of wire that ' s high tensile steel

    作為大橋的主要支撐,繩被繃在之間。它們是由強度的鋼絲組成的。
  8. The cable - stayed bridge of the hong kong section has a main span of 210m with a single inclined tower 158m in height. viaducts carry the approach roads to the bridges with piers at a typical spacing of 75m

    香港側的斜橋主跨長度為210米,單柱式後仰158米,架引橋跨距一般為75米。
分享友人