高水位線 的英文怎麼說
中文拼音 [gāoshuǐwèixiàn]
高水位線
英文
high water line- 高 : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 位 : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
- 線 : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
- 水位 : stage; water level
-
So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method
本文立足於黑龍江省各種河流的洪水特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計洪水流量及其相應洪水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和洪水比降的確定原則,並介紹了三日降雨量法。Hangzhou yuhang chengnan line factory organized in 1993, was located the beautiful hangjiahu plain of hangzhou yuhang disctrict linping town, the close neighbor no. 320 national highways and the huhang highway near linping exit, the geographical position superior, the transportation was extremely convenient, this factory area amounted to 2, 500 square meters, the floor space reaches 700 even aspects, at present the staff has 29 people, technical personnel had 3, the factory main equipment has the dye vat, the system line machine and so on the special - purpose supplementary equipment, the fixed asset more than 2 million yuan, at present main production ribbon product and so on black silk ribbon line, nylon line, real silk thread, produces high mainly sells to hangzhou, shanghai, and the peripheral locality, the product quality deeply user communities ' faith, this factory by the science management, the rich experience and the advanced technology and the craft, had guaranteed this factory product high level, the high quality, simultaneously continuously pursue the good prestige, take the customer demand foundation of as the enterprise survival, welcome the new old customer to come this factory service discussion, communal development
杭州餘杭成楠制線廠創辦於1993年,位於美麗的杭嘉湖平原杭州市餘杭區臨平鎮,緊鄰320國道及滬杭高速公路臨平出口處,地理位置優越,交通十分方便,該廠佔地面積達2500平方米,建築面積達700平方面,目前職工有29人,其中技術人員有3名,工廠主要設備有染缸、制線機等專用配套設備,固定資產200多萬元,目前主要生產絳綸線、尼龍線、真絲線等產品,產高品主要銷往杭州、上海、及周邊地區,產品質量深受廣大用戶的信賴,該廠以科學的管理,豐富的經驗及先進的技術和工藝,保證了該廠產品的高水平、高品質,同時一直追求良好的信譽,以客戶的需求為企業生存之本,歡迎新老客戶前來該廠業務洽談,共同發展。At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel
首先,系統分析了影響黃河水位的水沙因素,及僅用水沙因素有效研究水位的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應水位過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中高及中低含沙類洪水相應水位過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪水位過程的擬合誤差都較小;最後,明確黃河下游含沙量對水位的主要影響方式,即含沙量主要是與其它因素聯合對水位作用;另外分析了要實現變動河床洪水位過程準確預報的困難所在及改進方向。Application of the c. o. clark unit hydrography to the flux computation in a small scale basin of the loess plateau
單位線在黃土高原小流域匯水演算中的應用From the beginning of sq9 ' s development, the sedimentary environment turn to be lake basin bog. with water becoming shallow, coal seam appeared in lowstand system tract, delta plain and delta front are the main sedimentary bodies in highstand system tract
從層序9開始,水體開始變淺,向湖沼環境過渡,低水位體系域和水進體系域出現了煤線,高水位體系域以三角洲平原及三角洲前緣沉積為主。The curves of the highest water level in t years in the three survey stations of huangpu river, which may be useful to the government, are given out at the end of this paper
本文最後給出了黃浦江三個水文觀測站處的t年一遇的最高水位曲線,供市政設計部門參考。Article 33 it is forbidden to pile or deposit solid wastes and other pollutants on beaches and bank slopes below the highest water level of rivers, lakes, canals, irrigation channels and reservoirs
第三十三條禁止在江河、湖泊、運河、渠道、水庫最高水位線以下的灘地和岸坡堆放、存貯固體廢棄物和其他污染物。The position or height of such a line or plane
水平高度水平線或水平面的位置或高度Seeds germinate after floods on moist, non - saline, freshly deposited river banks free of other vegetation. seeds germinate in belts according to flood lines
胡楊種子洪水后在又濕潤、鹽分不高、新沉下來的,又沒有其他植被的河岸發芽。種子沿著洪水位的線發芽出來。After the reservoir sluices, the national highway 213 in this area will be submerged. so the national highway 213will increase its elevation to about 920 meters. in order to estimate the influence of the slope - sliding and bank - collapsing which caused by the reservoir sluices to the elevated highway, and to estimate possible emigration problem, stability analysis of landslide body no. l, 2, and 3 in i, ii area which located in bank accumulation body of zipingpu reservoir in national highway 213 is made by transfer coefficient method and 2 - d 3 - d fem in this paper
紫坪鋪水庫正常蓄水位高程877m ,水庫蓄水后將淹沒該段現國道213線,因此國道213線將改線抬高至920m高程附近,為正確評價因水庫蓄水造成的滑坡、塌岸對改線公路的影響,以及可能產生的移民問題,本文用傳遞系數法和二維、三維有限元方法對有可能失穩的213國道紫坪鋪庫區庫岸堆積體、區的1號、 2號、 3號滑坡體進行了穩定性分析。According to the request of this subject, we have developed the system hardware and software for the slave device and the inspection software running on the pc. in this paper all of the followings is illustrated detailedly, such as the research on the principles of measurement and its realization, three means of water - level measurement that are separately based on photo electricity coder, pressure sensor and potentiometer ; selection of the microchip, we choose an advanced integrated soc ( system on chip ) microchip c8051f021 as the main controller ; realization of signal sampling, processing and its conversion in the mcu ; application of high precision 16 bits adc cmos chip - - ad7705 in our system, designing its interface with the microchip and relevant program ; using a trickle charge timekeeping chip ds1302 in the system which can provide time norm and designing of its i / o interface and program ; additionally, a 4 ~ 20ma current output channel to provide system check - up using ad421. in the system, ad421, ad7705 and the microchip compose spi bus ; to communicate with the master pc, here we use two ways which are separately rs232 and rs485 ; moreover, there are alarm unit, keyboard unit, power supply inspection unit and voltage norm providing unit in the system
針對研製任務的要求,課題期間研製了下位機系統硬體和軟體,開發了上位機監控軟體,其中所作的具體工作包括:測量原理的研究和在系統中的實現,在本次設計中用三種方法來進行水位測量,分別是旋轉編碼器法、液位壓力傳感器法和可變電阻器法;主控晶元的選擇,我們選用了高集成度的混合信號系統級晶元c8051f021 ;實現了信號的採集和處理,包括信號的轉換和在單片機內的運算;高集成度16位模數轉換晶元ad7705在系統中的應用,我們完成了它與單片機的介面設計及程序編制任務;精確時鐘晶元ds1302在系統中的應用,在此,我們實現了用單片機的i o口與ds1302的連接和在軟體中對時序的模擬,該晶元的應用給整臺儀器提供了時間基準,方便了儀器的使用;另外,針對研製任務的要求,還給系統加上了一路4 20ma模擬信號電流環的輸出電路來提供系統監測,該部分的實現是通過採用ad421晶元來完成的,本設計中完成了ad421與單片機的spi介面任務,協調了它與ad7705晶元和單片機共同構成的spi總線系統的關系,並完成了程序設計;與上位機的通信介面設計,該部分通過兩種方法實現: rs232通信方式和rs485通信方式;系統設計方面還包括報警電路設計、操作鍵盤設計、電源監控電路設計、電壓基準電路的設計。Another hidden danger is the weakening of the impervious ability of the dam resulting from the closeness of the height of line seepage of the reservoir water level to the contact plane between the residual solum, talus solum and basement rocks
水庫水位浸潤線標高和殘坡積土與基巖接觸界面標高較接近,而使此高程的防滲能力更加薄弱,這也是此壩體的隱患之一。The result show that the position of free surface is higher because of frusta of brake, especial obvious in the head of frusta of brake ; flux coefficient and pressure on dam are quite influenced by type of frusta and 3 a type frusta of brake relative to 2 type frusta of brake has bigger flux coefficient and smaller pressure on dam ; obvious influence of ability of discharge flow for different ratio of thickness of frusta and breadth of brake and pressure on dam reduces with increasing ration of thickness of frusta and breadth of brake, while bigger flux coefficient is obtained when tlb = 0. 2
結果表明,閘墩河海大學博士論文的存在抬高了水面線的位置,其中在閘墩頭部尤其明顯;墩型對流量系數和壩面壓力影響較大, 3a型閘墩相對於2型閘墩具有更大的流量系數和更小的壩面壓力:不同的墩厚閘寬比t / b對泄流能力也將產生顯著的影響,隨著墩厚閘寬比的增加,壩面壓力降低,而當t / b二0 . 2時溢流壩具有更大的流量系數。After more than 20 years of the company refined, and continually improving production processes costumes, with the tide, and clothing production lines have been introduced from germany and other garment processing equipment, employ ethnic chinese in france paid suit offset division ; at the same time assigning staff hours and ordered popular fabric quarter, after strict steam advance further, sampling inspection, guarantee " laoer first " costumes gather high - quality and high - quality mass production of high - grade brand character
公司經過20餘年的磨礪,不斷改進服飾生產工藝,緊跟潮流,相繼從德國引進服裝生產流水線及其它服裝加工設備,在法國高薪聘請華裔西服製版師;同時分派專人分季訂購國內外流行面料,經過嚴格的蒸氣預縮、取樣檢驗,保證「老兒頭」服飾集聚高質量、高品位系列化等高檔品牌特質。1 the company has excellent production condition and public facilities such as self - provide power plant supplying high voltage wire of 35 kv, two sets 16000 kva transformers in power station, one deep well with water discharge of tons per hour, water pool with water pcapacity of 150 tons, one water tower with 100tons, two boilers with four tons, three compressed air machines to make sure the requirement of production. the company located at no. 62haozhuang st. taiyuan city and is 0. 7 kilometer away from dongshan expressway and also 2. 5 kilometer away from the railway station. the company was also equipped with communication facilities for example international telephone and fax
該公司具有良好的生產條件及公用設施:有自備電廠供給35kv高壓進線,變電站16000kva變壓器兩臺深井一眼,每小時出水50噸蓄水池150噸水塔1個,容量100噸4噸鍋爐兩臺,空壓機三臺,保證生產需求。公司位於太原市郝莊正街62號,距東山過境公路0 . 7公里,離車站貨場2 . 5公里,交通十分便利。有國際電話及傳真機等通訊設施。Shkp keeps systematic records of previous anomalies and their causes, which helps avoid reoccurrence. professionals from the construction and monitoring teams test over 100 things in new flats including windows, floors, walls, bathtubs, wiring, door hinges and screws, to ensure that everything is up to scratch when the development handed over
另方面,在業主驗收新樓前,建築及監察部會反覆檢查測試單位每一細節,由窗地板墻身浴缸到電線門鉸螺絲等超過100項,確保質素達到高水平。After analyzing, the author got the basic character of tidal flat hydrodynamic : the time of flooding on bare flat and ebbing is basically the same and the time of flooding on pioneer zone of salt marsh is a little short ; the process curve of current speed on bare flat did not appear peak value on the beginning of flooding and at the end of ebbing but presented double peak, that is, it presented double peak in winter and spring and ebbing peak value disappeared in summer and autumn, salt marsh presented single peak character in a year and the process curve in tidal creek presented double peak ; all current direction on every spot presented gyration current and the current speed changed rapidly during the high water level without obvious slack water period
分析得到了潮灘水動力基本特徵:光灘水位漲潮和落潮時間基本相等,而鹽沼前緣帶水位漲潮時間略短;光灘流速過程線在漲潮初和落潮末出現峰值,呈現「雙峰型」特徵,鹽沼前緣帶則冬、春季節呈現「雙峰型」 ,夏、秋季節落潮峰值消失,鹽沼帶四季呈現單峰特徵,潮溝內過程線為「雙峰型」 ;各測點流向均呈現回轉流特徵,在高水位時流向迅速改變,不存在明顯的憩流。( 4 ) on the basis of analysed result and the status quo of huxi bank, computing the slope safety and seepage of bank by fem. the result shows that the tarus quo of huxi bank could not satisfy theslope safety on designed flood lever. after the reinforcement of seepage, the method can not only reduced leakage, debace the soggy but also ameliorate stress fields. lt also can reduce horizontal displacement and certical displacemeng which have disadvantages to bank
進行堤體防滲加固后,不但可以減少滲漏,降低堤身浸潤線,還可以有限度地提高抗滑穩定安全系數,改善堤身及地基的應力場,使在高水位作用下產生的不利於堤體安全的水平位移和豎向位移減小。對在後繼采動中可能造成的防滲材料的破壞進行了校核,結果表明材料是安全的。The test result indicates that the output voltage and water level of the sensor show linear relationship, the sensor can be used for water level detection of boiler
測試結果表明:傳感器的輸出電壓與水位高低變化呈線性關系,可用於鍋爐水位的檢測。Tidal variations are mainly caused by the gravitational attractions of the moon and the sun. near new moon or full moon each month, the earth, moon and sun are aligned along a straight line and the sea - level rise and fall will have a larger range. this is called a spring tide
潮汐變化主要受月球和太陽的引力影響,每月的新月或滿月前後,地球月球和太陽三者連成一線,水位會升得特別高和降得特別低,這現象稱之為大潮或天文大潮。分享友人