高水頭 的英文怎麼說

中文拼音 [gāoshuǐtóu]
高水頭 英文
high water head高水頭水力發電廠 high-head hydro-power station; 高水頭水力樞紐 high waterhead hydraulic system; 高水頭水輪機 high head hydraulic turbine
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • 水頭 : waterhead; head; flood peak水頭落差 head fall; 水頭坡降 water table gradient
  1. A research on canceling telescopic joint of the penstock about the high head development near power house

    取消高水頭電站壓力鋼管近廠房段伸縮節研究
  2. Using a vortex - flow drop shaft to convey water from a high level to a diversion runnel under the condition of high water - head and large discharge is a new kind of technology in the scheme of reusing a diversion tunnel as a discharge tunnel

    近年來,為解決高水頭、大流量導流洞改建泄洪洞的技術難題,旋流式豎井泄洪洞逐漸成為研究熱點之一。但迄今為止,該技術尚未得到推廣應用,其主要原因在於人們對豎井螺旋流運動特徵缺乏足夠的了解和深入的研究。
  3. Finite volume method is appilied in numerical modeling of the flow in no - pressure tunnel of high water reservoir in this paper. i select standard k - turbulence modeling that put forward by launder and spalding in 1972 by weighted poly - turbulence modeling. the difficulty is that there is free surface in flow, but free surface problem ' s calculating region is indefinitely

    本文利用有限體積法對高水頭庫無壓泄流進行了紊流數值模擬,根據多種紊流模型的優缺點進行比較,選擇了launder和spalding於1972年提出的標準的k ?紊流模型。
  4. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井泄洪洞應用於高水頭、大泄流量情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣工程導流洞改建,對高水頭( 252m ) 、大泄流量( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高水頭、大流量條件下,豎井空腔段下部流速很,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是工程界關注的重大問題。
  5. The roto - jet pump is a new kind of very low specific speed pump which is developed in recent years. it is always used in carbin black, food production, chemical industry and deep well mining system to supply the steady outflow with low flux and high pressure

    旋轉噴射泵是近些年才發展起來的一種極低比轉數泵,主要用在碳黑、食品、化工以及深井采礦系統中用以提供小流量高水頭的穩定出流。
  6. The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate

    錦屏二級電站是一首部設低閘,採用長隧洞引高水頭、大流量的引式電站。
  7. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井洞室結構,就兩種襯砌結構型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌結構選型角度分析對比了兩種襯砌結構型式在圍巖及襯砌結構應力與變形、襯砌結構鋼筋混凝土開裂、圍巖與襯砌結構聯合承載、結構安全儲備、經濟等方面的優劣。
  8. Optimization calculation of adjustable seal in some high - head radial gate

    高水頭弧門伸縮式封選型計算
  9. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦電站700mw輪機的參數選擇進行了研究,通過對國內外的大容量、高水頭輪機的比轉速統計計算,利用輪機的相似理論,採用回歸統計計算方法,統計出了比轉速統計方程,並進行了輪機主要參數選擇論證,提出了適合拉西瓦電站輪機的主要目標參數。
  10. The impulse type turbines are the best election for high head and small discharge hydraulic power resources. they have compact structure, small size, and high efficiency and need fewer investments. they have been divided into turgo and pelton type

    沖擊式輪機是開發高水頭,小流量力資源的最佳機構,它具有投資小,效率,體積小,結構緊湊等特點。該機型又分斜擊式斗式兩種。
  11. The transient cfd simulation including the spiral case, stay vane, guide vane, runner vane and draft tube at different operation points is studied fitly, then the result of the pressure distribution on runner blade is provided for the runner transient structural simulation by fluid - structure interaction ( fsi ) method

    文中首先對高水頭小負荷的渦帶工況下混流式輪機內流場進行非定常cfd計算,得到渦帶工況下葉片表面不同時刻的壓力載荷,並利用流固耦合方法對轉輪進行結構場瞬態特性計算,分析轉輪葉片的動應力特性。
  12. Design for stoplog gate with high water head of temporary shiplock of tgp

    三峽臨時船閘高水頭疊梁門設計
  13. Structural study on underground bifurcation of hydropower station with high pressure

    高水頭電站地下埋藏式鋼岔管結構研究
  14. The analysis of effects of reservoir under the high water head upon tunnel seepage flow based on geo - slope

    分析高水頭作用下庫對隧道的滲流影響
  15. Research on vibration problem of hydraulic turbines under the high head and low output operation conditions

    輪機在高水頭低負荷工況下振動問題的研究
  16. Research on elastic slab vibration of inverted arch plunge pool under high water head and large discharge

    高水頭大流量作用下反拱墊塘彈性單底板塊振動規律研究
  17. It is suitable for unit with a water head higher than 500 meters, and it has been successfully used in the units with a water head of 600 - 800 meters

    適用於500米以上的高水頭機組,已分別在600 - 800米段的機組中成功使用。
  18. It concludes that percolation of roller compact concrete is of self - compactness by time effect under continuous action of water head and there may exist partial darcy flow regime in roller compact concrete under high water head

    認為在持續作用下,碾壓混凝土的滲透具有時效自密性;高水頭作用下的碾壓混凝土可能存在偏達西流現象。
  19. Along with construction of hydropower project, exploitation of ore, deposition of nuclear waste, development of terrestrial heat and so on, more and more geotechnical engineering is in the high hydraulic head, and deep embedded geohydrological condition, the hydraulic fracturing of rock mass is paid more and more attentions by engineering scholars

    隨著電工程建設、井工礦石開采、地下核廢料儲存、地熱開發等越來越多的巖土工程都處于高水頭、大埋深等惡劣文地質條件下,巖體力劈裂逐漸受到越來越多工程界學者的關注。
  20. On the heavy silt - laden rivers, desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head, but also for the runoff river hydropower station with lower water head

    摘要在多沙河流上,無論是壩大庫的高水頭電站,還是低河床式樞紐,電站進口的取排沙歷來是一個倍受關注的問題。
分享友人