高洪水位 的英文怎麼說

中文拼音 [gāohóngshuǐwèi]
高洪水位 英文
high flood level
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種河流的特點,結合以往工程實際,對影響跨河橋梁設計度的主要因素? ?設計流量及其相應的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的河流粗糙系數和比降的確定原則,並介紹了三日降雨量法。
  2. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河沙因素,及僅用沙因素有效研究的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃河中及中低含沙類相應過程的擬合,實現了這一典型非線性關系的精度擬合,各年汛期上下游相應過程的擬合誤差都較小;最後,明確黃河下游含沙量對的主要影響方式,即含沙量主要是與其它因素聯合對作用;另外分析了要實現變動河床過程準確預報的困難所在及改進方向。
  3. The flood damage exposes the contradiction between people and flood, population explosion results in that people need more and more land for farming, a lot of flood - plain, flood - plain protection, retarding basin, and ever floodway are occupied by farmers for agricultural purpose. so that major or even middle and small flood can not be smoothly discharged in the river

    這場災暴露了建國以來治淮工作中久而未決的一個問題,即局部地區為了解決人多地少的問題,大量侵佔河道行灘地,與爭地,不給出路,使得本已不堪重負的河道,即使是中、小來臨,也處在狀況下運行,加劇了中、下游地區的防風險。
  4. It was specially pointed out that, when the tail water is constant maximum tide, the computed flood surface is higher than that of nonsteady current, so there is some safety superelevation. underestimation of the roughness will make downward bias to compute along - river surface and bring hidden trouble for flood control. to improve the section can decrease the water level or offset the water rise for increase of floodplains " roughness, but it need much engineering works

    特別提出,按照恆定流計算出來的設計比非恆定具有一定的安全儲備;而對于灘地糙率的低估又會造成設計的偏低,給防工作帶來隱患;如果利用改進斷面形式來降低或彌補糙率增加帶來的,需要較大的工程量,所以平時應注意灘面的減糙管理工作。
  5. Meanwhile, the flood peak fell off ceaselessly, witch indicates that the new conformation descended greatly

    Sin以上,這比現代時期河一般上升1 zm左右明顯
  6. Currently sewage in sewage pumping station system is pumped manually. so the station is working in low water level and energy is consumed. this mode ca n ' t predict the inflow ' s changing

    當前污泵站排放系統主要採用人工值守方式排,低揚程耗能嚴重,且缺乏預測能力,流量峰來臨時易產生污溢出污染。
  7. Utilizing the highest flood water level in reservoir to amend the original design flood

    利用庫最高洪水位修正原設計
  8. Seeds germinate after floods on moist, non - saline, freshly deposited river banks free of other vegetation. seeds germinate in belts according to flood lines

    胡楊種子后在又濕潤、鹽分不、新沉下來的,又沒有其他植被的河岸發芽。種子沿著的線發芽出來。
  9. Accordingly, it is urgent and important to study the effect of different tongguan riverbed elevations on aggradation and degradation as well as the flood elevation of the lower weihe river

    因此,研究不同潼關程對渭河下游沖淤及的影響具有迫切而重要的現實意義。
  10. Soil embankment is widely used in water conservancy and flood prevention projects because of its being able to drawing on local resources and other advantages. how to analyze and calculate the seepage and stabilities of levees under high level flood reasonably, and supply reliable technological support for dangers removing and strengthening are of great engineering significances

    土質堤防因具有能就地取材等優點而為利及防工程廣泛採用,合理分析與計算高洪水位作用下堤防的滲流及穩定性、為除險加固提供技術支撐具有重要的工程實際意義。
  11. She was doing her midnight meditation when she suddenly awoke and opened her door to find that the rising water was only a few inches from her home. she quickly awakened her family and evacuated them to a higher place, and within minutes, water had submerged their home, which had never been flooded in the thirty odd years they had lived there

    在風災平靜后,各地哀嘆聲中,我耳聞靠近最低洼地區的一師姊如何福至心靈,忽然半夜在打坐時警醒,開門一看已近家門口,趕緊叫醒一家大小往處道路逃生,短短數分鐘后,淹沒了住了三十多年從沒淹過的家。
  12. Floodwaters are still rising after this week ' s heavy downpours across parts of ohio. rescue workers have been using helicopters to pluck people from rooftops and take them to safety

    本周在俄亥俄州的瓢潑大雨使得不斷升。救援人員出人意料的開始使用飛機救助被困屋頂的人們,使其脫離險境。
  13. Aim to analyze the problems in the course of the exploitation and utilization of water resources and offer some references to the sustainable utilization of water resources in baoji city, shaanxi, china in the future. methods beginning with the restrained factors that affects the sustainable exploitation of water resources, the main problems is systematically analyzed that exposed in the course of the exploitation and utilization of water resources : utilization ratio of water resources is low, water waste is serious ; groundwater is exploited excessively, water level drops continuously ; water pollution is serious, water quality worsens obviously ; management system of water resources is imperfect, the facilities of irrigation works wear out seriously. results it is suggested that pursue saving water all - round to build a water - saving society, and perfect the paid - use system of water resources to implement the industrial management of water resources, and strengthen the protecting consciousness of water resources together with controlling groundwater exploitation strictly, and increase the fund investments to enhance the irrigation works abilities of adjusting, holding and preventing the flood, and strengthen the network management of water resources besides improving the official specialized quality. conclusion the reasonable exploitation and utilization of water resources plays a key role in the sustainable development of economy and society in baoji city, shaanxi, china

    目的分析寶雞市資源開發利用中存在的問題,為今後資源的可持續利用提供參考依據.方法從影響寶雞市資源可持續利用的制約性因素入手,系統分析了在資源開發利用中存在的主要問題:資源利用率低,浪費嚴重;地下開采過度,持續下降;污染嚴重,質明顯惡化;資源管理體制不健全,利工程設施老化嚴重.結果提出了相關的解決對策:全面推行節約用,建立節型的社會;完善資源有償使用制度,實現資源的產業化管理;強化資源保護意識,嚴格控制地下開采;加大資金投入力度,提利工程的調蓄防能力;加強資源網路化管理,提管理人員的專業素養.結論資源的合理開發和利用是實現寶雞市經濟社會可持續發展的關鍵
  14. However, on this occasion, as a result of continued heavy rain that lashed the northwest of santa fe, the salado river also burst its banks in a matter of hours, inundating entire townships and flooding a third of the provinces capital city, also named santa fe, where whole neighborhoods were submerged under two meters of water

    然而,此次患卻肇因於西北部地區豪雨不斷,導致薩拉多河在幾小時內即潰決,淹沒了附近所有的城鎮,省會聖塔非市三分之一的面積也被淹沒,達二公尺。
  15. Jahezi reservoir is located at the northwest arid area of china, the primary tasks of which are flood control land irrigation. it has been reinforced in 2003 so the discharge capacity and the safety of dam were increasing at large degree, which created the conditions to utilize the flood sufficiently by raising the limited water level

    夾河子庫地處我國西北乾旱區,主要承擔防及灌溉任務, 2003年除險加固完成後,庫的泄流能力及大壩安全都有很大程度的提,為庫抬汛限,實現資源化創造了條件。
  16. The results indicated that with the change of water and sand condition and the altitude of tongguan and the development of the industry and agriculture in recent decades, the water environment of wei river had changed largely, which were shown as follow : annual runoff and seasonal flood decreased sharply ; water stream of large discharge decreased and the range of runoff decreased greatly ; sediment load per year decreased generally, sediment concentration of water increased, and the sand silting up was serious ; water channel swung and shrank, and water regime deteriorated ; frequencies of big floods decreased obviously, and hyper concentrated flood increased obviously ; water levels of the same runoff rose universally, and the frequencies of the floods increased and aggravated ; water pollution was very serious

    結果表明,近期隨著沙條件、潼關程等的變化及工農業的發展,渭河的環境發生了巨大變化,表現在年量及汛期量銳減;大流量級流出現次數減少,量減少幅度大;年輸沙量總體減少,河含沙量增大,泥沙淤積嚴重;河道向擺動型發展,河道萎縮,河勢惡化;大發生的次數顯著減少,含沙小明顯增多;同流量普遍抬災發生次數增加,災加重;質污染極為嚴重。
  17. The unavoidable flooding of villages occurred when authorities opened sluice gates at a dam on guangdong ' s hanjiang river because water there was building up to too high a level, it said

    報道稱,由於廣東韓江,當地政府開啟了一座壩的泄閘,從而不可避免地淹沒了這些村落。
  18. Combining with case study, the application conditions of hydrologic meteorology forecast information and flood forecast information in dynamic control of the limit water level during flood seasons are also illustrated. ( 3 ) in order to relieve the contradiction between water discharge in flood seasons and water shortage after flood seasons, the manner of flood operation with fixed limited water level during fixed time should be adjusted

    ( 3 )為改變庫汛期棄而汛后又缺的矛盾局面,調整現行庫固定時間固定汛限的調度方式,利用短期氣象預報和預報信息,在不改變現有防標準的前提下研究防預報調度方式,實現防與興利效益的轉換,提資源的利用率。
  19. The key point is how to regulate and control water resources nowadays, in the real - time operation of reservoirs, the fixed limit water level is used, which results in great waste of water resources, so the study on dynamic control of the limit water level is crucial to enhance the water resources utilization in north china

    汛限靜態控製造成資源的大量浪費,對北方流域汛期實施動態控制汛限是提資源利用的關鍵。動態控制汛限決策過程中普遍存在大系統、多目標決策、風險決策、群決策等特點,研究這些特點對開展資源優化配置決策具有十分重要的理論意義與實踐價值。
  20. Finally, by using of the mathematical model, it is calculated and predicted the effect of the different tongguan riverbed elevations as well as the different conditions of incoming water and sediment on the variance of the flood elevation and the tend of aggradation and degradation of the lower weihe river bed. it is answered quantitively the lessening extent of sediment silt and the decreasing extent of the flood elevation of the lower weihe river after 14 years on two different incoming water and sediment conditions with three different tongguan elevations, respectively 328m, 327m and 326m. these results supply important references to the planning of flood control and comprehensive regulations of the weihe river basin

    最後用驗證后的數學模型對不同沙系列、不同潼關程( 328m 、 327m 、 326m )下渭河下游的沖淤趨勢和的變化進行了預測計算,從定量上回答了潼關程從328m降至327m (相當于潼關程降1m )和潼關程從328m降至326m (相當于潼關程降2m )時,渭河下游14年之後各河段的減淤程度以及不同流量級的降低幅度,這些成果對于渭河下游防治理規劃的制定具有重要的參考價值。
分享友人