高爐爐期 的英文怎麼說

中文拼音 [gāo]
高爐爐期 英文
blast furnace production campaign
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 期名詞[書面語]1. (一周年) a full year; anniversary 2. (一整月) a full month
  1. The anticipant control curve approximating strategy and corresponding self - learning strategy are submitted and implemented very well. the result of expert control in three - tank liquid level equipment and three - zone high temperature furnace is satisfying

    提出了望曲線逼近策略及相應的自學習機制,並在專家控制器中得到較好的實現,在對三容水槽和三溫區溫加熱實施的專家控制中得到了較好的控制效果。
  2. Abstract : based on the research of ladle flow field, the steel flow i ng low of six strands small billet cc ladle is researched, the methods improves s teel flowi ng in the ladle by setting separating and blocking slag wall, separates the steel from the slag, increases the bluyance rate of inclusion, achieves the desired results, and applies itself to the practice

    文摘:在中間包流場分佈分析的基礎上,藉助水模擬試驗研究了6流小方坯連鑄中間包內鋼水流動規律,通過設置分流擋渣墻改進中間包內的鋼水流動,分離鋼水和渣,提鋼中夾雜物的上浮率,達到了預的效果,並應用於生產實踐
  3. The top widely give or get an electric shocks to wait the evd of the actual shipments the predominances measure to all compare to expect to want little, up widely give or get an electric shock the first shipment 2000 set, ratio in advance conceive big for the shrinkage. machine business enterprise of another 7 greatest discses within evd alliances, now haven t take outed the kind machine, and more have no a substance action on the market. created the even to put off the evd production plan, and start all over again to beat to build the high and pure dvd ; grow the to now return at hesitate the stage ; ten thousand benefits reach a business enterprise is then directed to throw the center of gravity to face philip get the engraving of the dvd ; even if is a top to widely give or get an electric shock, and also apparently diligently not, recent capital increase 577 ten thousand usds used for to engrave the production of the dvd with develop

    上廣電等evd主導者的實際出貨量都比預要少,上廣電首批出貨2000臺,比預先設想大為縮水。 evd聯盟中的另外7大碟機企業,目前還沒有拿出樣機,在市場上更沒有實質性的動作。創維甚至擱置了evd的生產計劃,另起灶打造清dvd長虹目前還在觀望階段萬利達等好幾家企業則直接將重心投向了飛利浦領銜的刻錄dvd即便是上廣電,也似乎用心不專,最近增資577萬美元用於刻錄dvd的生產和研發。
  4. The characteristics of the production are with the high dissociation of parts, complexity of structures, long period of manufacturing, and high cost. in addition the manufacture needs high demands to the resource planning, ability in equilibrium, control of cost, consignment on time and so on

    巴威公司的鍋產品是根據客戶要求製造的,其部件生產的離散性強、結構復雜、製造周長,成本,對資源計劃、能力均衡、成本控制、按交貨等提出了很的要求。
  5. Being demonstrated by production data, the benefits of both economical and social have been achieved by more stable melting process, decrease of bof reblow rate, less consumption of raw material, longer converter campaign, shorter melting time, better working conditions with computerized automatic steel making process on 120 - ton bof at tonggang

    摘要實際生產數據說明,通鋼120t轉實現副槍和動、靜態模型控制下的自動用煉鋼工藝后,吹煉過程穩定,補吹數少,鋼鐵料、合金消耗低,齡提,轉冶煉周縮短,工作環境改善,使轉副槍系統的應用取得了很好的經濟效益和社會效益。
  6. Through researching the con - structon methold of explording stove lump, disposing blasting residual things, residual waste iron of furnace bottom and furnace waist brick, we have developed the disposion stove liners construction craft in the middle and later term of construction blast furnace in pangang group

    通過對炸瘤、處理爆破殘留物、底殘渣鐵和缸磚的施工處理方法的研發,形成了攀鋼中後襯處理施工工藝。
  7. The movement of rotor is balanced ; while the quality of rotor distributes asymmetrically, the additive moving - pressure the equipment engineering company of chinese jialing group fetches in super - carb - prof ambi - whisking fan that is multi - stoves produce line runs under the circumstance of 950 or so. the leaves of fan are prone to distortion, which results in unbalanced vibration and affects the machine ' s normal movement severely

    中國嘉陵集團設備工程公司從德國ipsen公司引進的超級滲碳氣氛( super - carb - prof )多用生產線的氣氛攪拌風機長運行於950左右溫環境中,其扇葉極易變形,從而造成不平衡振動,嚴重影響設備的正常運行。
  8. The largest coal - fired power set - theoratical calculation and design of extra - large boiler ' s foundation slab of phase - shanghai waigaoqiao power plant

    上海外橋電廠二工程特大型鍋基礎厚板理論計算的探討和設計
  9. Series of high pressure thermocouples thermalresistances and thermowells, the thermocouple take the form of spring - loaded, of which protective tube and flange are forged of special alloy, as well the thermowell are formed with bar stock drilled. more further, theconnecting between thermowell and flange can be compressed with tapered thread and the groove at the lower end of flange can be welded with argon arc. these thermocouples are usually used in high equipments of hydrogen cracking device, cracker and vaporizer etc for pressure - resistant in over 30 mpa, operating temperature from 0 up to 800

    系列壓熱電偶阻及套管,熱電偶採用彈簧壓著式,保護套管和法蘭選用特殊合金材料鍛造,套管採用棒料整體鉆孔加工而成,與法蘭連接處以錐管螺紋配合併與法蘭下端渠槽處用氬弧焊接,耐壓30mpa ,使用溫度0800 ,可長使用在加氫裂化裝置裂解裝置,氣化壓設備中。
  10. The stove liner of blast furnace is damaged seriously for the influence of iron water melting metal, chemical corrosion of stove residual and furnace lump in the middle and later term

    摘要由於鐵水熔融金屬以及渣的化學侵蝕和瘤的影響,中後襯受損嚴重。
  11. After appropriate reform measures were taken, the slagging and gas temperature deviation problemes have been completely solved. the boiler efficiency was raised by 2 percentage points and the boiler ' s safety and economics effect got improved

    經本次改造解決了膛出口煙溫偏的問題,實現了鍋在130t h的額定工況下低溫段過熱器前煙溫由大修前的936下降到825的預效果,並提效2個百分點,使鍋運行的經濟性和安全可靠性得到改善和提
  12. Longevity technology of the blast furnace is a tendency of the iron - making development, it is also a topic that is long - term focused on and studied in the iron - making field

    摘要長壽是煉鐵技術發展的一個趨勢,亦是煉鐵界長關注和研究的重點課題。
  13. Abstract : by using the 3 - d unsteady state heat transfer equation, the heat convection and radiation between the checker and the gas which flows through the checker holes, and the heat conduction among the checker in the chamber of the hot blast stove were studied. the time dependable gas temperature and the temperature distributions within the checker were obtained

    文摘:應用三維非穩態熱量傳輸方程,對熱風在燃燒過程中蓄熱室內格子磚與氣體之間的對流和輻射傳熱,以及格子磚內部的導熱過程進行了耦合求解.得到了在燃燒內格子磚及燃燒過程中燃燒廢氣的溫度分佈情況及其隨時間的變化規律
  14. Abstract : the in servie tubular heaters built early in refineries and chemical plans have low thermal load and low heat efficiency, therefore measures for technical reform are offered, including ( 1 ) enlarging the surface area of convection tubes to increase the thermal load of rhe convection section ; ( 2 ) increasign the heat interchanging area of radiant tubes ; ( 3 ) changing the height of the chimney ; ( 4 ) using new burner with forced air supply to increase calorific capacityu ; ( 5 ) adding air preheater between the convection section and chimney to enhence the temperature of the air entering the furnace ; ( 6 ) adopting high temperature radiant coating to improve the effect of radiant heat interchanging

    文摘:針對早建造的煉油廠和化工廠在役管式加熱熱負荷和熱效率低的狀況,提出了若干技術改造措施包括,增大對流管表面積以增大對流段的熱負荷;增加輻射管的換熱面積;修正煙囪度;換用新型燃燒器,變自然通風為強制供風,以增大燃燒器的發熱量,減小過剩空氣系數,節省燃料2 % 3 % ;在對流段和煙囪之間增設空氣預熱器以提空氣入溫度;採用溫輻射塗料增強輻射換熱效果,從而增加熱源對壁的輻射傳熱量和管的傳熱量等。
  15. The in servie tubular heaters built early in refineries and chemical plans have low thermal load and low heat efficiency, therefore measures for technical reform are offered, including ( 1 ) enlarging the surface area of convection tubes to increase the thermal load of rhe convection section ; ( 2 ) increasign the heat interchanging area of radiant tubes ; ( 3 ) changing the height of the chimney ; ( 4 ) using new burner with forced air supply to increase calorific capacityu ; ( 5 ) adding air preheater between the convection section and chimney to enhence the temperature of the air entering the furnace ; ( 6 ) adopting high temperature radiant coating to improve the effect of radiant heat interchanging

    針對早建造的煉油廠和化工廠在役管式加熱熱負荷和熱效率低的狀況,提出了若干技術改造措施包括,增大對流管表面積以增大對流段的熱負荷;增加輻射管的換熱面積;修正煙囪度;換用新型燃燒器,變自然通風為強制供風,以增大燃燒器的發熱量,減小過剩空氣系數,節省燃料2 % 3 % ;在對流段和煙囪之間增設空氣預熱器以提空氣入溫度;採用溫輻射塗料增強輻射換熱效果,從而增加熱源對壁的輻射傳熱量和管的傳熱量等。
  16. Because of lower automating - control, the boiler ' s running efficiency is low, and heating energy waste is very high, one reason is burning control level is very low

    ,作為北方城市冬季取暖的主要設備,長以來,由於自動化程度不,運行效率低,能源浪費嚴重。其中鍋燃燒控制的落後是能耗的主要原因之一。
  17. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的測試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物流的時間分佈規律基本吻合,達到了模擬軟體設計的預目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉次計劃的編制有很的要求,合理安排來料、煉鋼與澆鑄三者間的物流平衡關系將是保證全連鑄作業的重要條件;當出現設備異常情況時,可以利用混鐵與lf站前等待作為物流緩沖池,通過延長系統的平均物流時間來緩解因設備檢修和故障等擾動所造成的影響,確保生產的順利進行。
  18. Beijing shougang group, one of china ' s leading steel manufacturers extinguished one of its four blast furnaces last saturday as part of its pledge to cut its normal output by half during the olympics

    作為中國主要鋼鐵生產商之一的北京首鋼集團上周六熄滅了其四個中的一個,部分兌現其在奧運間削減正常產量一半的承諾。
  19. As general manager of jiansu dayang engineering construction suporvision co. ltd, argainze and complete supervision for nangang no. 3. blast earnace project, plate plant rehead eurrace transforing projecte andit inspection works constraction achieving the desired results in timo control quality conforl, cost contral and sefty contral etc

    作為江蘇大陽工程建設監理公司總經理,組織完成了南鋼3 #工程,中板廠加熱改造工程,中板廠探傷廠房建設工程等項監理業力,均很好的實現了預監理目標,在工程進度、質量、投資安全的控制上取得了顯著成效。
  20. Blast furnace production campaign

    生產
分享友人