高爐爐煤氣 的英文怎麼說

中文拼音 [gāoméi]
高爐爐煤氣 英文
total top gas
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞(黑色固體礦物) coal
  • : Ⅰ名詞1 (氣體) gas 2 (空氣) air 3 (氣息) breath 4 (自然界冷熱陰晴等現象) weather 5 (氣味...
  • 煤氣 : coal gas; gas
  1. Abstract : apply computer simulation to the distribution pattern of air - flow without considering the cold condition of the combustion and compare the flow patterns under different designed circumstances. and the effect of the design of the partition in the air way of the burner on the flow and mixture of gas and air is especially studied. the result shows that the design of partition plays a very important role in strengthening the mixture of gas and air, but increases the loss of the resistance in the air way and the total pressure of the air way in same working conditions needs increasing

    文摘:應用計算機模擬的方法,在不考慮燃燒的冷態情況下,研究了熱風燃燒室內的流分佈規律.在此基礎上,比較了2種不同設計方案的流流動特徵,尤其是研究了燃燒器空通道內阻流板的設置與否對空的流動和混合的影響.結果表明,阻流板的設計對加強空的混合有著極為重要的作用,同時也增加了空管道的阻力損失,在同樣的工況條件下需要提管道系統的總壓力
  2. Moreover, the system of powdered coal conveying with primary air is the most important tache, whether the distribution of primary air is even or not directly relates to whether the distribution of powdered coal is even or not in all firing implement and nozzles, sequentially directly relates to whether it is hard to take fire, whether the fire is stable, whether there is coking and how about the heat efficiency of the boiler, hi addition, if there is jamming and deflagrate in the system of powdered coal conveying with primary air, severe safety accident can be resulted

    良好的粉配風是建立合理的內空動力工況和穩定燃燒的必要條件。而其中一次熱風送粉系統又是最重要的一個環節,一次風配風是否均勻直接關繫到粉在各燃燒器和各噴嘴中的分佈是否均勻,從而直接關繫到著火是否困難、火焰是否穩定、局部是否結焦以及鍋的熱效率低。若一次風送粉系統發生堵塞和粉爆燃則可能引發嚴重的安全事故。
  3. Research of maintenance policy based on the expected downtime of the system

    粉鍋摻燒粉燃盡影響的研究
  4. This gas is led off from the top of the furnace to be used.

    頂部引出加以利用。
  5. Tight scale is usually a problem encountered in forgings hardened from direct - fired gas furnaces having high - pressure burners

    頭直燃對鍛件進行淬火時,通常會出現鱗片問題。
  6. They walked by the remoter streets to coburg square, where he had a room at the top of the house, an attic room where he cooked for himself on a gas ring

    他們沿著偏僻的街道走到堡廣場。他的房子在最的一層,是個屋頂樓房,整潔而大方,他有個自己燒煮著食物。
  7. Its current products include : top oscillation electrical precipitator, side electrical oscillation precipitator, magnetism controlled static electricity precipitator, wet electrical precipitator, honeycomb electric catching tar instrument, high - pressur silicon rectifier equipment and plc low - pressure controlling system, blast furnace gas impulse precipitator, high concentration pulverized coal collector, coke oven and boiler flue gas low pressure impulse precipitator, blower fan inhaler, crossing piping gas cooler, high temperature fume cooler, gyre - orientation impulse hop - pocker and all sorts of molded sections

    目前主要產品有:頂部振打臥式電除塵器、側部振打電除塵器、磁控靜電除塵器、濕式電除塵器、蜂窩電捕焦油器、壓硅整流裝置及plc低壓控制系統、脈沖除塵器、濃度粉收集器、焦及鍋用低壓脈沖除塵器、風機空過濾器、橫管式冷卻器、溫煙冷卻器、回轉定位脈沖大布袋及加工各種冷彎型鋼。
  8. Application of low heating value blast - furnace gas in power unit

    低熱值在發電設備中的應用
  9. Study of mixing burning low heating value blast - furnace gas amp; amp; coal

    低熱值粉混燒技術的探討
  10. Study of mixing combustion techniques for coal and law heat value blast - furnace gas

    低熱值粉混燒技術的探討
  11. The top - firing air and gas self - preheating hot blast stove adopts a patented burner and high blast temperature bypass flue

    摘要頂燃式空自身雙預熱熱風採用了頂燃式燃燒器熱風專利的燃燒器技術和溫旁通煙道技術。
  12. But the temperature difference at the vertical direction in combustion chamber in lead column, that is said by operator, is over 60 ?. ( 2 ) according to the experiences in the practice, the second layer air and the second layer gas had a little effect of support burning, and the third air has little effect for combustion, and the power to drawing exhaust gas can only be adjusted in limited range. the problems, it is said above, restricted more advance of some kinds of technology and economy target in spelter refining in new jersey furnace

    由於鋅精餾產量提,一些問題開始暴露出來: ( 1 )燃燒室?舶要求溫度差不超過10 ,而從現場反映的情況來看,燃燒室上、中、下部溫度差已超過60 ; ( 2 )在生產實踐中,發現燃燒室第二層空、第二層作用甚小,第三層空失去助燃作用,廢出口的抽力可調范圍有限;以上這些問題在客觀上制約了精餾塔在鋅精煉中各項技術經濟指標的進一步提
  13. The high pressure blast furnace gas and coke - oven gas mixture used for making red copper casting, bronze casting, aluminum casting, zinc base alloy and some brass casting, is introduced

    介紹了用、焦混合作為燃料,生產紫銅件、錫青銅件、鑄鋁件、鋅基合金及部分黃銅件。
  14. Abstract : the high pressure blast furnace gas and coke - oven gas mixture used for making red copper casting, bronze casting, aluminum casting, zinc base alloy and some brass casting, is introduced

    文摘:介紹了用、焦混合作為燃料,生產紫銅件、錫青銅件、鑄鋁件、鋅基合金及部分黃銅件。
  15. Transformation of additional combustion of blast furnace gas of pulverized - coal fired boiler in a heat power plant

    摻燒的汽溫調節
  16. Technical measures for changing 200 t h pulverized - coal fired boiler to blast furnace gas - fired boiler

    粉鍋改造為全燒及其經濟效益
  17. Transformation of the 130t h pulverized - coal fired boiler to the all blast furnace gas fired boiler and the economic benefit

    混燃在軋鋼加熱上的開發應用
  18. It firstly analyzes the gasification principle and process of coal in constant pressure moving - bed gas producer and the research on gasification process and control of technical condition proves that it is the most effective way to improve the quality of coal for gasification and quality of hot coal gas, enhance the gasification intensity and gasification efficiency of gas producer

    首先,分析了在常壓移動床式發生內的化原理和工藝過程。對化過程工藝條件控制的研究表明,提化用的品質,是改善熱質量,提發生化強度和化效率的最有效途徑,並對化用的指標,提出了具體的要求。
  19. New improved gas wet desulfurization technology for high sulfur coking oven

    硫焦濕法脫硫工藝新改進
  20. It is specially designed for the gasification of bituminous coal with higher gas calorific value than that of km1q series and it has good environmental protection performance

    該產品是專門為燃用煙的用戶設計的型,熱值相對于km1q系列較,環保更可靠。
分享友人