高等采礦學 的英文怎麼說

中文拼音 [gāoděngcǎikuàngxué]
高等采礦學 英文
advanced mining engineering
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : Ⅰ量詞1 (等級) class; grade; rank 2 (種; 類) kind; sort; type Ⅱ形容詞(程度或數量上相同) equa...
  • : 采名詞(采地) feudal estate
  • : 名詞1. (礦床) ore [mineral] deposit 2. (礦石) ore 3. (開采礦物的場所) mine
  • : Ⅰ動詞1 (學習) study; learn 2 (模仿) imitate; mimic Ⅱ名詞1 (學問) learning; knowledge 2 (學...
  • 高等 : higher; advanced; high; of a higher level高等哺乳動物 higher mammal; 高等法院 high court; 高等教...
  • 采礦 : mining; mine (for minerals)采礦船 dredger
  1. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科基金重大項目「摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨性能混凝土技術、上海寶鋼石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術提供咨詢建議。
  2. Along with construction of hydropower project, exploitation of ore, deposition of nuclear waste, development of terrestrial heat and so on, more and more geotechnical engineering is in the high hydraulic head, and deep embedded geohydrological condition, the hydraulic fracturing of rock mass is paid more and more attentions by engineering scholars

    隨著水電工程建設、井工石開、地下核廢料儲存、地熱開發越來越多的巖土工程都處于水頭、大埋深惡劣水文地質條件下,巖體水力劈裂逐漸受到越來越多工程界者的關注。
  3. This paper takes rock mass structural plane that influences the stability of rock mass construction as the main subject of investigation and the underground mining in chengchao iron mine as an illustrating example. for a systematic study of the mechanical features of rock mass structural plane and of measures to control the rock mass structural plane, the methods of theoretical analysis, field survey, computer simulation, numerical calculation and engineering practice are employed jointly, aided by the integration of macro - study with micro - study, qualitative approach with quantitative one and theory with practice. the principle of combining rock mechanical theories with engineering practice is followed from beginning to end, which makes it possible to apply theoretical results to engineering practice, perfect the research method in raising the structural stability of underground construction and solve problems with production in enterprises

    本論文以影響巖體工程穩定性的巖體結構面為主要研究對象,以程潮鐵地下為例,採用理論分析、現場調查、計算機模擬、數值計算和工程實踐多種研究方法,將宏觀與微觀、定性與定量、理論與實踐相結合,系統地研究巖體結構面的力特徵,研究控制巖體結構面的方法、手段和措施,旨在將巖石力理論與工程緊密結合,使理論成果能夠在工程實踐中得到應用,不斷完善提地下工程結構穩定性的研究方法,解決企業生產難題。
分享友人