黃期過短 的英文怎麼說
中文拼音 [huángqīguòduǎn]
黃期過短
英文
short luteal phase-
The improvement plan for the right bank revetment of the first - step stilling basin for the normal spillway of huangbizhuang reservoir is optimized for many times, which has met the requirements to save the investment, shorten the construction period, guarantee the continuity of the boundary and satisfy the operation of the project at last
摘要黃壁莊水庫正常溢洪道一級消力池右岸躺坡改建方案經過多次優化,達到了節約投資、縮短工程工期,保證了邊界的連續性,滿足工程運用要求。Festivals in an agricultural society coincide with the change in the seasons. after a bumper harvest in autumn and the winter solstice, people begin to feel increasingly excited about ushering in the spring festival, or chinese new year, as the weather gets colder
農業社會的節慶是跟著大自然的季節走,收割了秋獲的金黃稻穀,在日最短夜最長的冬至吃過湯圓,隨著天氣越冷,期待過年的氛圍就越熱烈。Through above experiment, it would be expected to shorten port wine stain cure time and use them in curing degeneration of macula
通過上述實驗,試圖縮短鮮紅斑痣的治療時間,另外期望在需更強的殺傷效應的光敏劑才能完成的老年黃斑變性的治療方面能得到應用。On 18 april 1942 she launched 16 u. s. army b - 25 bombers to attack japan, a strike that caused relatively little damage but which had enormous strategic implications. the hornet was then sent to the south pacific to reinforce u. s. units following the battle of coral sea, but was recalled to pearl harbor in mid - may
作為當時最大最新的航母「大黃蜂」號自然被選中參加空襲東京的任務,經過短期的特殊改裝后, 1942年4月2日, 「大黃蜂」號載著16架b - 25轟炸機在哈爾西的企業號護航下突入日本近海。Conclusions as following have got through test study : ( 1 ) when impact compaction technology is applied to treat collapsible loess subgrade, the effect depth may be treated generally can not override 80 cm and impact compaction pass is optimum at 30 times. ( 2 ) for stratified impact compaction of subgrade, when compactness of each level reaches codeslstandards loose laying depth of 80 cm fits 40 impact compaction pass is the optimum combination of subgrade construction. when average compactness in each level reaches codeslstandards loose laying depth of 80 cm fits 30 impact compaction pass is the optimum combination o ( 3 ) the quality control method may request impact compaction pass as the main control index and at the same time the final division settlement is less than 10 % of total settlement as large area subgrade is constructed
通過試驗研究主要得出如下認識:沖擊壓實技術處理濕陷性黃土地基時,其有效處理深度一般不超過80cm ,沖壓遍數以30遍左右為宜;對路基分層沖壓,在要求土體中各點壓實度均達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓40遍;在只要求土體平均壓實度達到規范要求時,路基沖壓最佳組合為虛鋪厚度80cm 、沖壓30遍;大面積施工時,質量控制方法可按照在以沖壓遍數作為主要控制指標的同時,要求最後10遍分計沉降量小於累計沉降量10 ;在施工單位自己購置沖擊壓實機情況下,與傳統施工相比較,沖擊壓實技術是一種既能節約資金又能大量縮短工期的施工方法。分享友人