acceptance final 中文意思是什麼

acceptance final 解釋
最終驗收
  • acceptance : n. 1. 接受;驗收2. 答應,承認;(政黨候選人)接受提名。3. 【商業】承兌,認付(期票)。
  • final : adj 最終的,最後的,終極的;結局的,結果的;決定性的。 the final ballot 決選投票。 the final caus...
  1. Formalize and obtain final acceptance for the project

    獲得對項目的認同和正式接受。
  2. China will become a wto member thirty days after filing its formal acceptance with the wto. one final point is that we fully expect the wto to approve taiwan s accession in the same time frame as china s accession

    然後,中國需要完成國內批準程序並正式接受世貿組織成員地位。中國將在向世貿組織提出正式接受成員資格后30天成為世貿組織的成員。
  3. The guarantee period of the equipment supplied by the seller shall expire after 12 ( twele ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract

    賣方所提供的設備保質期按照合同第七章的規定:從最終驗收合格證書接受日開始算起,有效期為壹年( 12個月) 。
  4. The guarantee period of the equipment supplied by the seller shall expire after 12 ( twelve ) month counting from the date of final acceptance certificate as per chapter 7 of the present contract

    賣方所提供的設備保質期按照合同第七章的規定:從最終驗收合格證書接受日開始算起,有效期為壹年( 12個月) 。
  5. For that equipment for which operation is started before the date of the final acceptance certificate, the guarantee period of 12 ( twele ) months shall commence from the date of operation and that part of the equipment shall be deemed as accepted

    如果在驗收合格證沒有下來之前運行設備的話,那麼就默認為已經接受該設備了,並自機器運行之日起開始計算保修期( 12個月) 。
  6. For that equipment for which operation is started before the date of the final acceptance certificate, the guarantee period of 12 ( twelve ) months shall commence from the date of operation and that part of the equipment shall be deemed as accepted

    如果在驗收合格證沒有下來之前運行設備的話,那麼就默認為已經接受該設備了,並自機器運行之日起開始計算保修期( 12個月) 。
  7. ( a ) cover for the benefit of the principal shall remain in full force and effect under section 1 in respect of the insured property until the date of final acceptance of the project insured

    建設單位方在本保險第一部分(注:指物質損失保險部分)項下就被保險財產的受益在保險期間有全部效力,該效力至被保險工程的最後驗收時終止。
  8. This paper, through the research on the implementing of gaobazhou water conservancy project, demonstrated that the project is technical feasible, economic reasonable, and is conform to the state macro policy in external environment. described the full - aspect management on the design process of gaobazhou water conservancy project, fully demonstrated that the selection of design scheme and the design quality is directly related to the investment, quality and progress control of the project ; described the full - aspect management on the construction process of gaobazhou water conservancy project, discussed the management procedure and manner of supervisor in the construction process, how does the contractor to complete construction task scientifically and reasonably by following the certain supervision procedure based on the contract ; described the management on the procurement of gaobazhou water conservancy project, clarified these cautions to be taken during material and equipment procurement through the discussion on the content of procurement contract ; described the project acceptance and after - event evaluation of gaobazhou water conservancy project, fully defined the content for the final acceptance of the project ; fully described the comprehensive management carried out on gaobazhou water conservancy project, mainly focused on the study of information management, communication management, conflict management and risk management, which ensured the smooth execution of the project

    本文通過對高壩洲水利樞紐工程項目實施的研究,論證了高壩洲水利樞紐工程項目在技術上是可行的,在經濟上是合理的,在外部環境方面符合國家的宏觀政策;闡述了高壩洲水利樞紐工程設計過程的全面管理,充分論證了設計方案的選擇及設計質量的高低,直接關繫到工程項目的投資、質量和工程進度的控制好壞;闡述了高壩洲水利樞紐工程施工過程的全面管理,論述了監理在施工過程中的管理程序和方法,施工單位遵循一定的監理程序,依據施工合同科學合理地完成施工任務;闡述了高壩洲水利樞紐物質設備的采購管理,通過對采購合同內容的論述,明確了物質設備采購時應注意的問題;闡述了高壩洲水利樞紐工程項目驗收及后評價,明確了高壩洲水利樞紐工程項目竣工驗收的內容;較全面地闡述了高壩洲水利樞紐工程項目實施的綜合管理,重點研究了保證高壩洲水利樞紐工程項目順利實施的信息管理、溝通管理、沖突管理和風險管理。
  9. Actions on account of hidden defects cannot be brought ( against the contractor ) after five years have elapsed since the date of final acceptance of the work

    工程最後驗收日算起五年後,不得就隱藏缺陷(對承包商)提出訴訟。
  10. Firstly, the author introduces the development history and law of anti - dumping procedural law, then discusses its concept, characteristics, fundamental principles, relation between it and anti - dumping substantive law, finally expounds the jurisdiction, competent authorities, parties and their rights of anti - dumping case. part ii, anti - dumping investigation procedure. this part mainly discusses initiation mechanism, conditions of petition and acceptance, way and content of investigation, preliminary determination, final determination, concerned stipulations of chinese anti - dumping ordinance and its perfection

    筆者首先簡要介紹了國際國內反傾銷程序法的發展歷史以及「其由國內法到統一法,又從統一法到國內法,再由國內法到統一法,且日趨統一」的發展規律,接著重點論述了反傾銷程序法的概念、特徵一基本原則、反傾銷實體法與程序法的關系,最後闡述了反傾銷案件的管轄和主管機關、反傾銷申訴案件的當事人及其權利。
  11. Particular attention lies in the evidence for the products suitability as determined by independent experts, starting with acceptance test certificates to en 10204 in 3. 1 c versions for the materials used and ends with acceptance of the final products by the tv

    尤其注意中立的專家們對我們產品適用性的認可,從en 10204驗收測試認證書材料的使用3 . 1c版本到tv對最終產品的接受。
  12. The warranty period shall be 12 months counting from the date on which the buyer, the end - user and the seller sign the certificate of final acceptance of the contract goods

    保證期自買方,最終用戶和賣方簽署合同貨物最終驗收證書之日起十二個月。
  13. Probe into the engineering mechanical completion and final acceptance optimization

    工程機械竣工和最終驗收優化的探討
  14. Responsibilities : the mechanical engineer is in charge of the project from the design to the commissioning and final acceptance of the equipments

    崗位職責:機械技術工程師負責從設備設計、現場調試到最終驗收的一系列工作。
  15. Packaging - requirements for packaging recoverable through composting and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging

    包裝.通過合成及生物降解規定包裝可回收性的求.試驗計劃和包裝最終驗收評定標準
  16. Packaging - requirements for packaging recoverable through compositing and biodegradation - test scheme and evaluation criteria for the final acceptance of packaging

    包裝.對通過合成和生物降解產生的可回收包裝材料的要求.包裝材料最終驗收的試驗計劃和評價標準
  17. Compile the inspection and test plan of components purchased including process inspection and final acceptance inspection

    制定采購部件的檢驗試驗計劃,包括過程檢驗和最後驗收程序的計劃。
  18. The undertaking organization should carry out the assessment of the occupational - disease - prevention measures before the final acceptance of the construction project

    建設項目在竣工驗收前,建設單位應當進行職業病危害控制效果評價。
  19. Pneumatic fluid power - cylinders - final examination and acceptance criteria

    氣壓液動.氣液缸.最終檢驗和驗收標準
  20. Site acceptance shall mean the final acceptance of the equipment carried out by the purchaser at purchaser ' s facility in accordance with the acceptance test manual

    現場驗收是指買方按照驗收手冊對買方設施上安裝的設備所的最後驗收。
分享友人