all concrete frame 中文意思是什麼

all concrete frame 解釋
全混凝土框架
  • all : adj 1 所有的,全部的,整個的,一切的。2 非常的,極度的,盡可能的。3 〈口語〉用盡,用完。n pron 全...
  • concrete : adj 1 具體的,有形的;實在的,實際的。2 固結成的,混凝土製的。3 圖案詩歌的(參閱concrete poetry)...
  • frame : n 1 機構;組織;系統。2 結構,框架,構架,骨架,骨骼。3 體格,身軀。 4 精神狀態,心情。5 【園藝】...
  1. The shear mechanism, failure mode, deformation capacity, bearing capacity and the reliability of the anchored angle steels of the wrapped steel concrete cast - in - site frame typical story exterior joints under the middle and high axial compression ratio ( n = 0. 3, 0. 5, 0. 6 ), the working performance, failure mode, and the shear capacity of top story joints under the crack moment, the hysteresis characteristic and the dissipation energy capacity of the test joints are all analysed based on the 1 / 4 model pseudo - static tests of five specimens of wrapped steel concrete cast - in - site frame exterior joints, which varied in axial compression ratio, distribution of the beam angle steels and the stirrup ratio

    基於上述分析,本次試驗通過五個外包鋼混凝土邊節點1 4比例模型的偽靜力試驗,以柱的軸壓比、梁角鋼布置形式、配箍率等為主要參數,分析外包鋼混凝土現澆框架一般層邊節點在中高軸壓比( n = 0 . 3 、 0 . 5 、 0 . 6 )條件下,節點的抗剪機理、破壞模式、變形能力、承載能力和角鋼錨固的可靠性;分析了頂層邊節點在張開彎矩作用下的工作性能、破壞模式和抗剪承載力;分析了試驗節點的滯回性能和耗能能力。
  2. Especially the bridge engineering has to be concerned with high, new and difficult technologies. new technologies firstly adopted are post - tensioned prestressed concrete simply - supported box girder, assembly two - way prestressed concrete simply - supported t - girder, reinforced concrete continuous rigid frame, and steel - concrete composite continuous girder. all these have formed a series of new bridge structures taking prestressed concrete simply - supported box girder as main feature

    由於秦沈客運專線的特殊技術要求,在鐵路建設史上首次採用了后張法預應力混凝土箱形簡支梁、裝配式雙向預應力混凝土t形簡支梁、鋼筋混凝土剛構連續梁、鋼與混凝土結合連續梁等橋跨結構,形成了以預應力簡支箱梁橋跨結構為主要特徵的一系列橋梁新結構。
  3. For validate the scenario, the dissertation selected 176 students ( 12 ~ 14 years old ) in three middle and primary schools in guangdong province. and these cases are being happened but solved not yet. finally choose following three cases : " concrete factory survey ", " park investigation " and " convey of school " the basic frame of gbs cases is : first of all present a target problem which will be resolved to student and fix a set of actions plan involved knowledge and skills which would be learned by student

    上述3個基於目標的行動計劃的基本框架是:首先學生確定要解決的目標問題;其次,在教師參與和指導下,根據具體問題設定一系列的行動計劃;在這一計劃中,隱藏了多種需要目標技能才能解決的次級問題,最後,學生通過解決這一系列的具體問題,並對行動結果進行理解和反思,最終形成對問題的解決方案。
  4. The first term of square covers 100, 000 ? with over 100, 000 ? building area. with architecture frame of all concrete pavements, it concentrates the business state of mart of professional market, 1 + 2 style and tradition

    鄭州(中國)調味廚具商貿廣場一期佔地10萬平方米,建築面積10萬余平方米。建築為全混凝土框架結構,匯集了專業市場的大賣場、 1 + 2模式和傳統相結合的商業形態。
  5. ( 4 ) it was figured out that variational history of incremental dissipated hysteretic energy of high strength concrete tentative frame columns under different loading cycle levels ; through analyzing all sorts of damage models comparatively, damage model of high strength concrete frame column are put forward, which offers good basement for further damage analysis

    ( 4 )計算出高強混凝土試驗框架柱的累積滯回耗能隨加載循環水平的變化,通過對各損傷模型的比較分析,提出了高強混凝土框架柱的損傷模型,為進一步進行損傷分析打下了良好的基礎。
  6. In consideration of the principle in which all of the prestressed concrete members in a same structure have to satisfy the two types of limit state, the design method on normal section of prestressed concrete members in statically indeterminate structures, taking account of the effect of the prestressing process, is presented to avoid the shortage in design method of post - tensioned bonded concrete frame structures at present

    本文針對現行超靜定預應力混凝土框架結構設計方法還存在的一些問題,在前人的基礎之上對現行超靜定預應力混凝土結構設計方法加以分析和研究,提出了一種超靜定預應力混凝土結構構件正截面設計的單位面積法。
分享友人