alteration of project 中文意思是什麼

alteration of project 解釋
改動方案
  • alteration : n. 1. 變更,改變,變化。2. 【地質學;地理學】蝕變。3. 〈美方〉閹割。
  • of : OF =Old French 古法語。
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Guided by the theories of property right and company management, this paper, based on the summaries and analysis of lese ' s characteristics, its past achievements and contributions, its three stages of developments and the problems existing at present, offers suggestions for solving these problems and strengthening its competence, including the discussion on the theoretical basis of the company system alteration for lese, its necessity and feasibility. a project of qingan mechanism manufacture company system alteration is then designed on the basis of the author ' s many years of managing experience

    本文以產權理論和公司治理理論為指導,在總結勞服企業特點、歷史貢獻,劃分勞服企業發展三個階段,分析勞服企業存在問題的基礎上,論證了解決勞服企業存在問題,增強勞服企業競爭力的重要途徑? ?對勞服企業進行公司制改造的理論基礎,研究了公司制改造的必要性和可行性,並且根據根據作者的管理實踐設計了慶安機械製造公司的公司制改造方案。
  2. Where delivery of the project is delayed due to such repair, re - construction or alteration, the constructor shall be liable for breach of contract

    經過修理或者返工、改建后,造成逾期交付的,施工人應當承擔違約責任。
  3. Where the construction project fails to meet the prescribed quality requirements due to any reason attributable to the constructor, the developer is entitled to require the constructor to repair, re - construct or make alteration free of charge within a reasonable time

    第二百八十一條因施工人的原因致使建設工程質量不符合約定的,發包人有權要求施工人在合理期限內無償修理或者返工、改建。
  4. Based on a large number of investigations and analysis of excitation settings and their performance in homeland, this paper presents a better project, which adapts to the alteration of excitation system in an _ kang hydropower plant - excitation system on double microcomputer

    在廣泛調查分析國內目前先進勵磁裝置及其工作性能的基礎上,提出了適合安康水電站機組勵磁系統改造的最佳方案? ?雙微機全控橋式自並勵磁系統。
  5. Secondly, the content, evaluating guideline system of the food security cost were discussed, and the quantitative analysis of the food security cost at the view point of center finance expend from reform and opening of china was given. threely, the influnce factors of chinese food security under wto were analyzed thoroughly, and the new stratagem of food security - - big food and little grain ration was proposed, and the food security and its types were discussed. the article thought that ensureing the food security hi the reason cost is the process both food security control was improved and microcosmic foundation was intensified increasingly, that the moderation scale of chinese food security repertory, that the rules, which includes negative correlation alteration of agriculture proportion and modern, etc. must be followed, and that the project of water from south to north must give attention to two or more things water need of food produce ability and output

    認為中國糧食安全與成本優化的過程是一個不斷改進糧食安全調控工作的過程,也是使微觀基礎得以強化的過程;按照社會可承受2的糧食可供波動與控制糧食儲備成本的標準計算,中國糧食安全儲備的適度規模為48872千噸;應根據「農業比重與農業現代化的負相關變動」 、 「比較優勢與農業保護的平衡運用」 、 「大糧食消費與增值的備擇性」 、 「產業結構調整與糧食產能保護的兼容性」等要求建立與實施旨在謀求糧食安全與產業結構調整協調的評價指標體系;北方地區對中國糧食生產與增產具有很強的正相關性,然而它正遭受著越來越嚴重的水缺乏的影響;南水北調工程必須兼顧糧食產能的用水需要,以有效緩解糧食需求的相對穩定與糧食產量波動相對較大之間的矛盾,從而達到減少儲備、節約成本的目的。
  6. This paper has introduced the engineering project financing, traits of main facilities and complexion of technic alteration in the rizhao power plant

    本文對日照電廠工程項目融資形式、主要設備特點及技術改造情況進行了介紹,重點闡述了該工程首次採用無政府擔保的有限追索項目融資的方式所作的有益探索和創新。
  7. This paper advances some measures for controlling effectively the construction cost in the construction stage from aspects of optimizing the construction organization design, implementing the dynamic control of the construction cost, controlling the construction alteration, strengthening the field signature management, and strengthening the management of the project material prices, etc

    從優化施工組織設計、控制工程變更、加強現場簽證和工程材料價格的管理等方面提出了有效控制施工階段工程造價的措施。
  8. And combined with the engineering practice of xiao - xiang highway route alteration project, it introduces the technological process of on - line blockage with high pressure expansive cylinder and the key working procedure of practical operation

    對比囊式封堵和盤式封堵,從安全性、經濟性、可操作性、穩定性和時效性方面論述了膨脹筒式不停輸封堵的特點及其在油氣管道施工中的優越性。
  9. Project scope must be determined before project decision - making and can not be changed at will during the implementing of project, i. e., any product r & d project must be managed by the procedure of startup - scope planning - scope definition - scope check - control of scope alteration

    項目立項前必須確定項目范圍,在項目實施過程中不得隨意進行項目范圍變更。也就是說,對于任何產品研發項目,都必須按項目啟動? ?范圍規劃? ?范圍界定? ?范圍核定? ?范圍變更控制的程序來進行管理。
  10. Project manager, as a leader, organize director, technician to make inspection on management work performance and quality of every position every week, fill “ weekly inspection table ”, make punishment on those who did not finish weekly work plan and do not accord with management system, find reason and submit alteration measure

    由項目經理帶頭,組織主管、技術員對每周各崗位的管理工作計劃完成情況以及質量進行一次檢查,填寫《周檢表》 ,對未完成周工作計劃及不符合管理標準的進行處罰,並由各自管理組查找原因,提交整改措施。
分享友人