anchor deformation 中文意思是什麼

anchor deformation 解釋
錨固變形
  • anchor : n 1 掛錨;錨狀物。2 樁,支架。3 〈比喻〉依靠。4 【體育】一隊運動員中最後參加比賽的人;殿後的人〈...
  • deformation : 變形,走樣
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的角度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧洞穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧洞圍巖應力、變形的影響。
  2. The two models of rigid and elastic piles have been discussed respectively, in which the anchor cable will be regarded as an elastic hinge. under the consideration of deformation harmony of anchor cable with piles bodies and pile bottom conditions, the solutions of the internal forces distribution along piles bodies are presented

    本文分別按剛性樁和彈性樁兩種物理模式,將錨索視為彈性絞支座,利用抗滑樁和錨索位移變形協調條件,計算出不同樁底條件下抗滑樁的內力分佈。
  3. Through inversion analyzing the results of inspection and observation which was applied the multipoint displacement measures and the drilling anchor stress measures to the top surface in the xianggui gypsummine eastern workings, this article will attempt to propose the deformation law of stope terrane after the underwater mine area, which provided a reliable basis for taking measures to control the strata movement

    摘要為了研究湘桂石膏礦的巖體變形規律,對該礦東采區頂板巖孔多點位移計觀測和鉆孔錨桿應力計檢測的結果進行綜合反演分析,提出了水下礦區開挖后采場巖層的變形規律,為採取有效措施控制巖層移動提供了依據。
  4. Ltd. the aim of this research is to find out the causes of abnormal axial force that results in fracture of bolts that anchor the shaft of planet gear and rupture of gear by means of force and deformation analysis, thus propose improving project of zl50 wheel type loader to enhance design quality. prime study content in the paper is described in the following

    本課題研究的目的是通過該變速箱的均載性能、各部件的受力、變形以及齒輪接觸應力的分析,尋找出直齒行星輪機構產生異常軸向力,從而導致變速箱行星軸止動螺栓斷裂及部分行星輪輪齒崩裂的原因,為柳工zl50裝載機行星齒輪變速箱的改進提出方案,提高設計質量和設計水平。
  5. The results show that after water is successfully blocked, the roadway deformation is controlled using the highly - prestressed anchor combined bolting system and the supporting invalidation is avoided

    結果表明,在成功阻斷泥化誘因「水」之後,高強預應力錨桿組合支護體系可有效控制巷道變形,避免泥化導致隨后的錨固失效。
  6. In this paper, author compare with shenzhen holiday plaza project ( be known as firstly deepest foundation pit, deepest excavation depth is 21m ), use combinative method for theory guidance, test study, simulation analysis, project application and information feedback, entirely and deeply study prestress anchor cable composite soil nail, and also make a pilot study for deformation of pile anchor composite soil nail

    本文以深圳假日廣場深基坑支護工程(號稱「深圳第一坑」 ,最深開挖21m )為背景,採用了理論指導、試驗研究、模擬分析、工程應用和信息反饋相結合的方法,對預應力錨索復合土釘支護結構進行了全面深入的研究,對樁錨式復合土釘支護結構的變形進行了初步研究。
  7. The emphasis is given on the studying of the horizontal displacement on the retaining structure consist of piles and anchors, which is a frequent type of retaining structure. it is founded that the rigidity of anchors and magnitude of pre - stress are the main factors which influence the deformation of retaining structures. the optimal design method on pile - anchor systems is presented

    樁錨支護是一種常見的基坑支護模式,本文以樁錨支護結構水平位移為重點,對支護結構剛度、支撐剛度與預應力、支護樁入土深度等對樁頂水平位移的影響進行了分析,指出在樁錨支護體系中,錨桿支撐剛度及預應力對基坑變形的影響最為明顯,並通過工程實例加以驗證。
  8. In light of the existing problem in researching the mechanism of prestressed anchor rope foundation beam system, and based on the loading and deformation compatibility relation of foundation and foundation beam of prestressed anchor rope foundation beam system, through decomposition and discretization of prestressed anchor rope foundation beam system, a new theoretical calculation method that can consider the interaction of prestressed anchor rope foundation beam system, is proposed

    摘要針對現階段預應力錨索地梁與地基共同作用機理研究方面存在的問題,以預應力錨索地梁和地基巖土體之間荷載、變形協調關系為基礎,通過對預應力錨索地梁體系的分解和離散化處理,建立了能考慮預應力錨索地梁體系共同作用的預應力錨索地梁計算理論和方法。
  9. Abstract : taking a deep basal pit in wuhan as a case history, this article adopts the numerical simulation method ( finite element method ) to study the variation of pit excavation depth 、 anchor prestress 、 pile width and embeded depth of pile and their relationship with the horizontal deformation and displacement of the tiedjogglepile

    文摘:以武漢某深基坑為例,採用有限單元數值模擬方法,研究基坑開挖深度、錨桿預應力、樁體厚度、樁體嵌入深度的變化與其錨式連鎖灌注排樁支護結構水平變形位移的關系。
  10. According to test results, author analyses deformation characters and its rules of prestress anchor cable composite soil nail supporting and pile anchor composite soil nail supporting, studies work mechanism of prestress anchor cable composite soil nail supporting structure, explores change regularity of inner force of soil

    三、對預應力錨索復合土釘支護結構進行了大量全方位的現場原位測試試驗。根據試驗測試結果來研究分析預應力錨索復合土釘支護結構和樁錨式復合土釘支護結構的變形特徵及規律。
  11. The new method of soil nailing with micro - pile and pre - stressed anchor wire was used to control the deformation of deep excavation

    採用微型樁預應力錨索配合土釘支護的新型復合土釘支護方案,經有限元計算對復合土釘和一般土釘的兩種方案變形曲線進行對比、分析。
  12. At last, the analysis of the redistribution of the initial crust stress and the distribution of the plastic area is made ; the stability evaluation of the rock mass around the cavern is provided. the outcome is conformed with the reality. then applys the approximately equivalent dissolved rule, and considers the action of anchor staff to consolidate the rock mass, and correspond model is established, nonlinear finite element m ethod is applied to analyze the effect of the supports, the result shows that the action of anchor staff is obvious and deformation and stress state of the rock mass is greatly approved. so, the result conforms that the idea and the means used in the thesis is applicable

    最後運用非線性有限元對廠房開挖后圍巖的應力重分佈和塑性開展區的分佈作了分析,評價了廠房的圍巖穩定性,其結果與實際開挖情況基本吻合,針對圍巖穩定性評價的結果,提出了錨固方案,運用等效概化原理考慮錨桿的作用,建立了採用系統錨桿加固后的地下廠房圍巖的三維彈塑性模型,運用非線性有限元分析了加固效果,結果表明錨固作用明顯,圍巖變形明顯減小,圍巖內的應力狀態大為改善,從而驗證了本文所採用的研究思想和方法是切實可行性的。
  13. Viscous - elastic analysis on deformation in surrounding rock of tunnel by using anchor - grouting support

    錨注支護巷道圍巖變形的粘彈性分析
  14. Based on the characteristics of intense deformation - failure of surrounding rock in a soft and thick coal seam roadway along gob area coal mine, the structure calculating model of original rocks around a roadway along gob area is constructed by knowledge of mechanics, and various bolt - mesh - anchor supporting schemes are simulated and supporting parameters optimized, supporting schemes is proposed, which is secure and economic

    摘要針對松軟破碎厚煤層綜放沿空巷道圍巖變形破壞特徵,建立沿空巷道原始圍巖結構計算模型,模擬計算各種不同支護設計方案,優化支護參數,選定安全經濟的支護方案。
  15. Studies of force and deformation properties considering pile - anchor - soil interaction in deep pits

    深基坑樁錨支護結構受力和變形特性研究
分享友人