b-power 中文意思是什麼

b-power 解釋
板極電源
  • b :
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  1. 1 gowan m k, biro l l, jackson d b. power considerations in the design of the alpha 21264 microprocessor. in proc. 35th acm ieee design automation conf.,

    1通過實驗觀察到,無論對于單線程還是多線程負載, 2op指令占動態指令總數的比率較小,但平均等待時延較長。
  2. In this paper, we analyze and practise the enterprise - level application of b / s structure developed on j2ee platform, which is in the information - flattop plan proposed by yunnan electric power company

    本文針對雲南電力集團公司提出的「信息航母計劃」 ,對在j2ee平臺上開發b s結構的企業級應用程序進行了一定的分析、研究和實踐工作。
  3. The schematic flow of low temperature geothermal fluids through a power station in italy is presented in example b.

    例子B是義大利一個電站利用低溫地熱流體的流程示意圖。
  4. 404 b. c. athens and sparta square off in the peloponnesian war. athens and many other city - states begin to diminish in power

    公元前431 - 404年雅典和斯巴達展開伯羅奔尼撒戰爭,此後雅典和許多其他城邦的權力開始削弱。
  5. Juventus are now in serie b and, while their appeal could see the 17 - point penalty reduced, moggi believes there were power games at work far stronger than his own

    尤文現在不得不帶著- 17分參加乙級聯賽。莫吉堅信,足壇存在著比他強大得多的勢力。
  6. B god is the all powerful creator and sustainer of the universe. god is real and accessible. the power of god enables ordinary people to lead extraordinary lives

    上帝是宇宙間萬能的創造者和支撐者。上帝是真的,是可以接近的。上帝的力量可以使普通人過上美好的生活。
  7. Therefore, in december 2000 the bureau of transportation of taipei city government completed a feasibility study for an lrt system in the taipei shin - yi district. this study recommended the adoption of an lrt system with a standard track gauge, power supply from overhead wires, two or three cars per train, a length of 90m for platforms, a certificate system for fare payment, consideration of the possibility of using electronic sensor ticketing systems, type b right - of - way for at grade sections, and signaling control for passing priority at the intersections. the study also proposed an initial lrt line of 9. 6 kilometers in length with 9 stations

    現代化輕軌運輸系統之運輸效能已較電車系統大幅提升,以一般採用b型路權為主,少部分a與c型路權之系統而言,每小時單向運能達到5 , 000至15 , 000人次,介乎高運量捷運與公車系統之間,適合擔負都會地區市郊與市中心區的聯絡路線、市中心區集散路線、鐵路與捷運系統接駁路線、都市周邊環狀線、特定區間(新市鎮)聯絡線、都會區次要運輸走廊運輸主軸等服務類型。
  8. The company passed iso9001 in 2001 : 2000 international quality management system attestations. now the predominant product has already become xr series helical gear units, xf series parallel shaft helical gear units, xk serial helical - bevel gear units, xs series helical - worm gear units, xt series spiral bevel gear units, xb series high power gear units, xh series high power gear units, nmrv series worm gear units, mb, mbn series planetary friction mechanical speed variator, x, b series cycloid reducer, wb series cycloid micro reducer to wait more than ten serieses, several thousand kinds of specificationses of in general use product

    現主導產品已形成xr系列斜輪硬面減速機xf系列平行軸斜輪減速機xk系列斜輪螺旋錐輪減速機xs系列斜輪蝸輪減速機, xt系列螺旋錐輪減速機, xb系列螺旋錐輪-斜輪減速機xh系列平行軸斜輪減速機nmrv系列蝸輪減速機, mb mbn系列行星錐盤無級變速機, x b系列擺線針輪減速機, wb微型擺線針輪減速機等十幾個系列數千種規格的通用產品。
  9. Martin cunningham, john power eatondph 1 8 ador dorador douradora must be where he called monks the dayfather about keyes s ad, thomas kernan, simon dedalus, stephen dedalus, b. a., edward j. lambert, cornelius kelleher, joseph m c. hynes, l. boom, c. p. m coy, - m intosh, and several others

    坎寧翰約翰鮑爾eatondph 1 8 adordor douradora 194準是為了凱斯那條廣告的事兒把蒙克斯叫了去才排錯的托馬斯。
  10. Hydraulic fluid power. cylinder 160 bar compact serie. clevis bracket form b

    液壓流體動力. 160巴小型系列液壓缸. b型v形支架
  11. 15 nevine aboughazaleh, daniel mosse, childers b r, melhem r g. collaborative operating system and compiler power management for real - time applications

    盡管以往存在大量的動態電壓調節方法的研究,但是很少涉及最優化的調節點配置方法。
  12. 17 nevine aboughazaleh, daniel mosse, childers b r, melhem r. toward the placement of power management points in real - time applications. compilers and operating systems for low power, norwell : kluwer academic publishers, 2003, pp. 37 - 52

    本文建立了動態電壓調節的分析模型,證明了無電壓調節開銷情況下啟發性的x0配置是最優的調節點配置,試驗模擬進一步驗證了x0配置是最優的調節點配置方法。
  13. The components, microstructure, luminousness, thickness and surface topography of the films were analysised via xrd, uv ? vis, xps, ellipsometric examination and stm. the photocatalytic properties of these fims are characterized by the decomposition rate of methylene blue or rhodamine b. the effect of sputtering power, temperature, o2 mass flow, bias, w - doping and sputtering time on photocatalytic properties are discussed

    採用x射線衍射儀、紫外-可見光分光光度計、 x光電子能譜儀、薄膜厚度測試儀及掃描探針顯微鏡等測試手段,研究分析了薄膜的組分、結構、透光率、膜厚和表面形貌等。
  14. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕軌系統為標準軌距,架空線供電之大部分低底板輕軌車輛,每列車以二輛編組營運,月臺設計長度為60公尺,以付費證明系統收費,平面段采b型路權,交叉路口以交通號志管制,給予優先通行權。二線合計之建設成本,以89年幣值估算,約需新臺幣131億元。
  15. Kavanagh s example as a poet of rural realism inspired seamus heaney b. 1939 whose vision of the redemptive power of poetry earned him a nobel prize for literature in 1995. among his contemporaries, thomas kinsella b

    Kavanagh作為一個鄉村現實主義詩人,激發了seamus heaney (生於1939年)的創作熱情,他對詩歌拯救力量的想象力,為他贏得了1995年的諾貝爾文學獎。
  16. Hieron won this race b. c. 472, while at the height of his power at syracuse. probably the ode was sung at syracuse, perhaps, as has been suggested, at a banquet

    西隆在公元前472的比賽中贏得這次比賽,同時也達到他在錫拉庫扎權力的頂峰。這首頌歌也許是在錫拉庫扎吟唱,也許象曾經說的那樣是在宴會上演唱。
  17. Foshan power design institute is the state grade b power design organization with the qualification of 220kv and below power supply, transferring and distributing engineering exploiting, designing and engineering consulting. the company has separate judical person qualification

    佛山電力設計院有限公司是具有220千伏及以下輸變配電工程勘察設計和工程咨詢資質的國家乙級電力設計單位,具有獨立法人資格。
  18. The shajiao b power station in guangdong, replied sir gordon without hesitation, which was a build - own - transfer ( bot ) project completed in just 22 months, and which helped alleviate guangdong province s need for electricity

    胡爵士毫不猶豫地表示,廣東省的沙角b發電廠正是他的最大成就。發電廠從興建、擁有至轉售僅僅花了二十二個月,並大大紓緩了廣東省電力供應緊張的問題。
  19. Best known is his " slipform " method of construction, which enables one high - rise floor to be erected every three days. his 2x350mw coal - fired shajiao b power station in guangdong set a world record of sending the first electricity in month 22 after ground - breaking - a feat that earned the company the british construction award of 1988

    他以滑模的施工技術聞名,能夠每三日加建一層樓。他僅僅花了二十二個月便在廣東省建成了2x35萬千瓦的沙角b發電廠,用煤發電,並隨即開始供電,打破了世界紀錄,更贏得一九八八年的英國建築獎。
  20. The unsteady flow as thrust vectoring nozzle deflecting dynamically is investigated. the method of calculating the unsteady flow in the nozzle is given and the flow of the nozzle in the maximum power setting and maximum a / b power setting of the engine is calculated

    研究了矢量噴管動態偏轉過程中氣流的非定常流動和矢量噴管非定常流動計算方法,計算了矢量噴管在發動機某中間狀態和加力狀態下的非定常流場。
分享友人