baishan 中文意思是什麼

baishan 解釋
白山市
  1. Xiaoxia wang, baishan fang, juxiang luo, wenjun li, liaoyuan zhang. heterologous expression, purification, and characterization of xylose reductase from candida shehatae

    王曉霞,鄭晨娜,王飛飛,方柏山.共表達木聚糖酶和木糖還原酶生產木糖醇的研究
  2. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄洪模型試驗,結合白山已建的建築物及籌建的白山大泵進水口,選定水墊塘的總體布置方案。
  3. The main contents are as follows : in order to finish this work well, the author collected the basic parameters of water cushion in china and foreign countries, and analyzed the questions and shortcoming in the designing of cushion in domestic and abroad, and summarized the design experiment of xiao wan hydraulic power station and ertan hydraulic power station in china, finally the main controlling design parameters of baishan water cushion, that is the allow dynamic impact water pressure and unit water consumed energy rate were asserted

    具體內容如下:為了做好白山水墊塘設計,本文通過收集國內外水墊塘設計的基本參數,分析水墊塘設計存在的問題及不足,總結國內小灣、二灘工程的經驗,確定白山水墊塘設計主要控制參數即允許動水沖擊壓力及水墊塘單位水體消能率。
  4. To design the water cushion of baishan arc dam, the design experiment of ertan hydraulic power station, xiao wan hydraulic power station were refereed. through large amount of scientific experiments and theoretical calculation, and the design coefficients of water cushion in domestic and abroad were summarized, then the design layout of the baishan cushion was worked out at last

    本文針對白山拱壩水墊塘方案設計,參考國內二灘、小灣等工程設計經驗,通過大量的科學試驗和理論計算,總結國內外的水墊塘設計參數,最後確定了白山水墊塘的設計方案。
  5. Research on structural feature and coal floatability of baishan coal

    百善煤的結構特徵及可浮選性研究
  6. Application of silicon powder concrete in baishan hydropower station

    補償收縮硅粉混凝土在白山水電站的應用
  7. In this cool and fruitful golden autumn, we meet at the beautiful foothills of changbai mountain, co - sponsoredby the international foundation for the protection of drinking water, china mining association, the geological environment department of the ministry of national land and resources, the promotion group of the changbai mountain mineral water resources of jilin province, the national land resource bureau of jilin province, the leading group office of building upecological province of jilin province and the people ' s government of baishan city, the fourth china baishan international mineral water festival now is on its way

    值此秋風送爽、碩果累累的金秋時節,我們相聚在美麗的長白山腳下,由國際飲水資源保護組織、中國礦業聯合會、國土資源部地質環境司、吉林省長白山礦泉水資源開發利用工作推進組、吉林省國土資源廳、吉林省生態省建設領導小組辦公室、白山市人民政府聯合主辦的第四屆「中國?白山國際礦泉節」 ,今天隆重開幕了。
  8. Baishan city is a place full of opportunities with its economic growth on a fast track

    白山這塊神奇的土地充滿著無限商機。
  9. Application of section locking device in baishan pumped - storage power station

    分段關閉裝置在白山抽水蓄能電站的應用
  10. Three angular unconformities found in the field work in the previous baishan formation of the carboniferous in poziquan area help to subdivide baishan formation into four formations

    摘要通過野外工作,在前人所劃的坡子泉地區石炭系白山組內新發現三個角度不整合,而將白山組解體成四個組。
  11. Reasons amp; protection measures of landslide in zhanshan village of dahu town, baishan township of minhou county

    閩侯縣白沙鎮大湖鄉珍山村滑坡產生的原因及防治措施
  12. Stars electric successfully run a self - developed governing system in jilin baishan revisable pump powerstation, and became the unique domestic manufacturers who has design and manufacture experience of governing system of large revisable pump type turbine

    事達電氣自行研製開發的抽水蓄能機組調速系統在吉林白山電站成功投運,成為在大型抽水蓄能機組上唯一有運行業績的國內調速器生產廠家。
  13. According to the selected project, a stability test with scale of 1 : 35 of cushion bottom had been done. with the research results of the experiments and the flow shape of xiao wan hydraulic power station were thought about, on the other hand, the ternary complex jet shape of baishan water cushion was analyzed, all this gave a base for the analysis of the force of the cushion bottom. through observation, the dynamic water pressure, the fluctuation pressure, the time - homogeneous pressure on the surface of the bottom and the characteristics of the fluctuation pressure could be got, also the calculation method and the test results were compared to get the argument

    針對選定的方案,進一步做了1 : 35比尺的水墊塘底板穩定性試驗;通過試驗及借鑒小灣水墊塘內水流流態的研究成果,分析白山水墊塘內三元復雜淹沒射流流態,為水墊塘內底板受力分析打下基礎;通過觀測得到水墊塘底板動水沖擊壓力、脈動壓力、底板上下表面的時均壓力及脈動壓力特性,並通過計算方法與試驗成果進行相互比較論證。
  14. Experience in upgrading the breaking - proof system for lump coal in the coal preparation plant of baishan mine

    百善煤礦選煤廠塊煤防破碎系統的改造
  15. Baishan city is china ' s first international mineral water city named by the international drinking water resource protection organization

    白山市是我國第一個由國際飲水資源保護組織命名的國際礦泉城。
  16. Firstable i want to thanks the organizing committee of “ the third china baishan international mineral water festival ” for their invitation to participate in this important event

    女士們,先生們,尊敬的各位來賓:首先,我要感謝第三屆中國白山國際礦泉節組委會邀請我參加這個重要的活動。
  17. Jilin baishan hotel

    吉林省白山市賓館
  18. And sincere thanks to the participating specialists and comrades for their enthusiastic supports and helps on mineral water industry development, especially thanks to the municipal committee of baishan of the chinese communist party and the municipal government of baishan, the contractor of this forum

    對熱情關心和支持礦泉水產業發展的各位專家、與會同志,特別是對承辦本屆天然礦泉水國際論壇的白山市委、白山市人民政府表示衷心的感謝!
  19. Respected leaders and specilalists, ladies and gentlemen, today, the third china ? baishan natural mineral water international forum is now open in baishan, the no 1 city of beautiful changbai mountain, i would like, on behalf of geology environment department of land and resources ministry, to express our warm congratulations to this international forum

    尊敬的各位領導、各位專家、女士們、先生們:第三屆中國?白山天然礦泉水國際論壇今天在美麗的長白山第一市白山市召開了,我代表國土資源部地質環境司對第三屆中國?白山天然礦泉水國際論壇的召開表示熱烈的祝賀!
  20. Development and marketing measures of tourist commodities in baishan region

    白山旅遊商品開發與營銷措施
分享友人