beam-to-beam weld 中文意思是什麼

beam-to-beam weld 解釋
梁間焊接
  • beam : n 1 梁,棟梁,桁條;(船的)橫梁。2 船幅;(動物、人的)體幅。3 (秤)桿,杠桿,(織機的)卷軸,...
  • to : adv 到某種狀態;〈特指〉到停止狀態;關閉。 ★也常和動詞結合,略去其後賓語,而構成成語: The door i...
  • weld : n 焊接(點),熔接點。vt 焊[熔]接;使密切接合,結合。 A welded joint 【機械工程】熔接頭。vi 被焊...
  1. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產線焊接成形,施工現場用高強螺栓連接,減少了焊接工作量,使進度和質量得到完全保證。
  2. The purpose of the paper is to search the feasibility of the ecletron - beam weld of ti3al intermetallics and tc11 ( a + b ) two phase titanium alloy, and the influence to weld microstructure and properties of the hot deform and heat treatments

    本文的目的是探索ti _ 3al金屬化合物tac - 1b合金與tc11兩相鈦合金電子束焊、熱模鍛及熱處理的可行性,並研究焊后熱加工變形與熱處理對組織與性能的影響。
  3. By vacuum - electron - beam weld of ti3al and tc11 the technology of hot die forging, and then use different heat treatments, study the influence law of the different degree of deform, different heat treatments to the microstructure and properties

    採用熱模鍛技術,通過對tac - 1b 、 tc11進行不同程度的變形、真空電子束焊接,然後採用不同的熱處理工藝,研究熱加工工藝對合金組織,性能的影響規律。
  4. Therefore, in order to understand the long - time performance of the weld, it is necessary to study the welding interface of niobium alloy and stainless steel, and know the microstructure evaluation. explosive welding and vacuum electron beam self - material brazing were used to prepare the specimen

    因此,研究鈮合金與不銹鋼的焊接結合層,分析形成的互擴散層的組織、成分和性能變化,對了解不銹鋼和nb合金的互擴散反應行為,焊接件的焊接工藝改進和長期使用性能的評估是很有意義的。
  5. Instead of the conventional node - node model, the spot - weld is modeled by a new short beam element introduced into between node and clement, which is subject to the tensile and shear forces

    新型焊接單元在有限元節點與單元之間引入短梁單元來模擬焊接關系,單元承受拉伸力和剪切力。
  6. Based on the investigation of research and application of concrete - filled tubular column to steel beam connections in china and abroad, according to engineering practice, six full - size specimens that the joints composed by concrete - filled square tubular column and i - shape steel beam divided as a and b groups have been tested under cyclic - loading in this paper. the three specimens of group a are connected by bolt - weld and the group b connected by welded at the end of beams

    本文在總結分析了國內外關于鋼管混凝土框架節點研究與應用現狀的基礎上,以實際工程為背景,在國內首次進行了a 、 b兩組共6個足尺節點試件的低周反復循環加載試驗,其中a組三個試件梁端採用栓-焊連接; b組三個試件梁端為全對接焊接。
  7. Track planning system of electron beam welding has been applied to weld production of aluminous crossbeam part successfully, and practical results show that this system can shorten development periods, and improve quality of production

    電子束焊接的運動軌跡規劃系統已經成功地應用到了鋁橫梁零件的焊接生產中,運行結果表明該軟體系統縮短了產品開發周期,提高了產品質量。
分享友人