blast furnace plant 中文意思是什麼

blast furnace plant 解釋
高爐車間
  • blast : n 1 (風)一陣,(氣流等的)一股;疾風,強風;【冶金】鼓風,送風;噴氣,噴焰。2 管樂器聲,汽笛聲...
  • furnace : n. 1. 爐子;熔爐;高爐。2. 極熱的地方。3. 磨煉;艱難。vt. 在爐中燒熱(金屬)。
  • plant : n 1 植物,草木 (opp animal); 草本;〈商用語〉樹秧,苗木。2 莊稼,作物,收獲;(植物的)生育。3 ...
  1. Kzl series air clean filter to enter empty to is it stand to press since, the compressor and air conditioner imprison the wind system, blast furnace air - introduced machine of steel plant, gas turbine, air making oxygen raw materials air compressor filter, strain and contain a large number of dust except that among them, prevent from in dust particle long - time adjustment air current sports, to operated equipment above blade, impeller, flow dish and part lead to the fact the harm

    Kzl系列空氣自潔過濾裝置kzl系列空氣自潔過濾裝置是對進入空壓站壓縮機及空調關風系統,鋼鐵廠高爐引風機燃氣輪機制氧原料空壓機的空氣進行過濾,濾除其中含有大量塵埃,避免灰塵粒子在長時間的調整氣流運動中,對以上運行設備的葉片葉輪流道及部件將造成損害。
  2. Transformation of additional combustion of blast furnace gas of pulverized - coal fired boiler in a heat power plant

    鍋爐摻燒高爐煤氣的汽溫調節
  3. Our work grows out of a small blast furnace plant which is set up in1913

    我們廠的前身是一家小煉鐵廠,建於1913年。
  4. With process data of blast furnace no. 1 in tianjin iron plant, the parameters, ru and sita, of model have been optimized based on criteria of predictability, hit ratio, direction hit ratio and mean sum of square error according to each variable respectively

    以可預測率、預測命中率、趨勢預測命中率及平均誤差平方和為評價標準,確定了各影響因素的警戒參數ru和濾波參數sita的優化值范圍。
  5. As a simple overview, the blast furnace needs coke from the coke plant to reduce the iron ore ( iron oxide ) to iron

    焦爐廠中生成的焦炭在高爐中還原鐵礦石(鐵的氧化物)成鐵。
  6. In this thesis, a new model used for prediction of silicon content in hot metal based on self - organized experience evolution approach has been investigated by developing prototype of the model with software engineering methodology, optimizing model parameters and testing it with process data of blast furnace in tianjin iron plant

    針對目前鐵水硅含量預測方法尚不能滿足高爐過程式控制制需要的現狀,根據所提出的高爐鐵水硅含量自組織經驗進化預測模型原理,用軟體工程方法學設計和開發了相應軟體原型,並從理論和實踐角度對這種新的智能預測模型進行了研究。
  7. The compressor driven by steam turbine for no. 4 blast furnace and the collecting heat supply system is a modification and extension project of existent power plant in tisco

    高爐汽動鼓風站及集中供熱設施,是太鋼現有的發電廠的改擴建工程。
分享友人